{"article":{"annotation":{"article_id":"zushi-renewables-arvin-edison-canal-hydro-ferc-2026","available_at":"2026-10-21T00:47:15.665332Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"e3dd95d81de88c214e17a6fd9c922c0485b69248ec1c5220e4388fa67b940f6b","input_sha256":"9d1c0a992ff8e0a0754ebbcb03434182b3ed8dc275f483b4c3090f3538dbf671","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"US","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.federalregister.gov/documents/2026/10/20/2026-21437/zushi-renewables-llc-notice-of-preliminary-determination-of-a-qualifying-conduit-hydropower-facility"]}],"geometry":null,"id":"iso3166-1:US","kind":"country-or-area","labels":{"ar":"الولايات المتحدة الأمريكية","en":"United States of America","es":"Estados Unidos de América","fr":"États-Unis d’Amérique"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000257","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: Renewables, hydropower","source_urls":["https://www.federalregister.gov/documents/2026/10/20/2026-21437/zushi-renewables-llc-notice-of-preliminary-determination-of-a-qualifying-conduit-hydropower-facility"]}],"method":"controlled-rules-v1","rule_id":"renewables","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["Zushi Renewables filed for the Arvin Edison Canal Hydrokinetic 1 project on 1 October and supplemented its notice on 13 October. Four 10-kW turbines would provide 40 kW of installed capacity along an irrigation canal operated by the Arvin-Edison Water Storage District near Bakersfield, California.","FERC staff preliminarily found that the project would not change the canal’s primary agricultural water-delivery purpose and meets the qualifying conduit hydropower criteria. That preliminary finding means the project would not require a licence or exemption from licensing. Comments and intervention motions are due by 16 November 2026."],"sections":[]},"corrections":[],"country":"US","data":{"blocks":[{"description":{"ar":"مراحل الطلب والتعليق التي حددتها فيرك في الملف CD27-2-000.","de":"Antrags- und Stellungnahmetermine laut FERC im Verfahren CD27-2-000.","en":"Application and comment milestones stated by FERC in docket CD27-2-000.","es":"Etapas de solicitud y comentarios indicadas por la FERC en el expediente CD27-2-000.","fr":"Étapes de la demande et des commentaires indiquées par la FERC dans le dossier CD27-2-000.","pt":"Etapas do pedido e dos comentários indicadas pela FERC no processo CD27-2-000.","tr":"FERC’in CD27-2-000 dosyasında açıkladığı başvuru ve yorum aşamaları."},"id":"regulatory-milestones","items":[{"date":"2026-10-01","description":{"ar":"قدمت زوشي رينيوابلز طلب مشروع الطاقة المائية الحركية في القناة.","de":"Zushi Renewables reichte den Antrag für sein hydrokinetisches Leitungsprojekt ein.","en":"Zushi Renewables filed for its conduit hydrokinetic project.","es":"Zushi Renewables presentó la solicitud para su proyecto hidrocinético en conducción.","fr":"Zushi Renewables a déposé une demande pour son projet hydrocinétique en conduite.","pt":"A Zushi Renewables apresentou o pedido para o seu projeto hidrocinético em conduta.","tr":"Zushi Renewables kanal hidrokinetik projesi için başvuru yaptı."},"label":{"ar":"تقديم الطلب","de":"Antrag eingereicht","en":"Application filed","es":"Presentación de la solicitud","fr":"Dépôt de la demande","pt":"Pedido apresentado","tr":"Başvuru sunuldu"},"status":"occurred"},{"date":"2026-11-16","description":{"ar":"تُقدم التعليقات وطلبات التدخل في الملف CD27-2-000 بحلول الساعة الخامسة مساءً بتوقيت الساحل الشرقي.","de":"Stellungnahmen und Beteiligungsanträge im Verfahren CD27-2-000 sind bis 17 Uhr Eastern Time einzureichen.","en":"Comments and intervention motions in docket CD27-2-000 are due by 5 p.m. Eastern Time.","es":"Los comentarios y solicitudes de intervención del expediente CD27-2-000 vencen a las 17:00, hora del Este.","fr":"Les commentaires et demandes d’intervention dans le dossier CD27-2-000 doivent parvenir avant 17 h, heure de l’Est.","pt":"Os comentários e pedidos de intervenção no processo CD27-2-000 devem ser apresentados até às 17h, hora do Leste.","tr":"CD27-2-000 dosyası için yorumlar ve müdahale başvuruları 17.00 Doğu Saati’ne kadar alınır."},"label":{"ar":"الموعد النهائي للتعليقات والتدخل","de":"Frist für Stellungnahmen und Beteiligung","en":"Comments and intervention deadline","es":"Fecha límite para comentarios e intervención","fr":"Date limite des commentaires et interventions","pt":"Prazo para comentários e intervenção","tr":"Yorum ve müdahale son günü"},"status":"scheduled"}],"methodology":{"ar":"نُقلت تواريخ الإيداع والموعد النهائي للتعليقات كما وردت في إشعار فيرك.","de":"Antragsdaten und Stellungnahmefrist sind der FERC-Mitteilung entnommen.","en":"Filing dates and the comment deadline are transcribed from FERC’s notice.","es":"Las fechas de presentación y el plazo de comentarios se transcriben del aviso de la FERC.","fr":"Les dates de dépôt et l’échéance des commentaires sont reprises de l’avis de la FERC.","pt":"As datas de apresentação e o prazo para comentários foram transcritos do aviso da FERC.","tr":"Başvuru tarihleri ve yorum son günü FERC duyurusunda verildiği şekilde aktarılmıştır."},"sourceUrls":["https://www.federalregister.gov/documents/2026/10/20/2026-21437/zushi-renewables-llc-notice-of-preliminary-determination-of-a-qualifying-conduit-hydropower-facility"],"title":{"ar":"جدول فيرك لمشروع زوشي للطاقة المائية في القناة","de":"FERC-Zeitplan für Zushis Leitungshydropower-Projekt","en":"FERC schedule for Zushi’s conduit hydro project","es":"Calendario de la FERC para el proyecto hidroeléctrico en conducción de Zushi","fr":"Calendrier de la FERC pour le projet hydroélectrique en conduite de Zushi","pt":"Calendário da FERC para o projeto hidroelétrico em conduta da Zushi","tr":"Zushi kanal hidroelektrik projesi için FERC takvimi"},"type":"events","updatedAt":"2026-10-20T23:41:00Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026/data/regulatory-milestones?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026/data/regulatory-milestones?lang=en&format=json"},"id":"regulatory-milestones"}],"data_types":["events"],"editorial_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-40f3c24d-c0fa-5cd1-85a2-a4b2d67aaec0","event_period":"2026-10-15","event_period_basis":"event-or-reference-period","id":"zushi-renewables-arvin-edison-canal-hydro-ferc-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-21T00:44:04+00:00","publication_basis":"publication-record","published_at":"2026-10-21T00:44:04+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"zushi-renewables-arvin-edison-canal-hydro-ferc-2026","sources":[{"checkedAt":"2026-10-21","name":"Federal Energy Regulatory Commission","publishedAt":"2026-10-20","url":"https://www.federalregister.gov/documents/2026/10/20/2026-21437/zushi-renewables-llc-notice-of-preliminary-determination-of-a-qualifying-conduit-hydropower-facility"}],"summary":"Staff said the four-turbine canal project meets criteria for conduit hydropower that does not require a licence.","text":"Staff said the four-turbine canal project meets criteria for conduit hydropower that does not require a licence.\n\nZushi Renewables filed for the Arvin Edison Canal Hydrokinetic 1 project on 1 October and supplemented its notice on 13 October. Four 10-kW turbines would provide 40 kW of installed capacity along an irrigation canal operated by the Arvin-Edison Water Storage District near Bakersfield, California.\n\nFERC staff preliminarily found that the project would not change the canal’s primary agricultural water-delivery purpose and meets the qualifying conduit hydropower criteria. That preliminary finding means the project would not require a licence or exemption from licensing. Comments and intervention motions are due by 16 November 2026.","title":"FERC preliminarily finds Zushi Renewables’ 40-kW California hydro project qualifies","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026"},{"api_url":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026"},{"api_url":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026"},{"api_url":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026"},{"api_url":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026"},{"api_url":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026"},{"api_url":"https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026"}],"url":"https://newsverum.com/en/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026"},"version":"1"}
