{"article":{"annotation":{"article_id":"worley-bcei-veri-merkezi-enerji-2026","available_at":"2026-10-11T21:35:04.831547Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"75b18dbb0e13735296df894c80c9d27dfd4de8d71ce57fb251e4191ea69fda1b","input_sha256":"e9019b0973bee12317bc70d75e4c164cee7c6ddd6a45dffe2ced97f0e2835bb7","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000256","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.worley.com/en/insights/our-news/low-carbon-energy/2026/bcei-contracts-us-data-center-expansion"]}],"method":"controlled-rules-v1","rule_id":"energy-broad","status":"candidate"},{"concept_id":"medtop:13000000","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: data center","source_urls":["https://www.worley.com/en/insights/our-news/low-carbon-energy/2026/bcei-contracts-us-data-center-expansion"]}],"method":"controlled-rules-v1","rule_id":"technology","status":"candidate"},{"concept_id":"medtop:20000225","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: data center","source_urls":["https://www.worley.com/en/insights/our-news/low-carbon-energy/2026/bcei-contracts-us-data-center-expansion"]}],"method":"controlled-rules-v1","rule_id":"computing-it","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/worley-wins-three-us-data-center-energy-engineering-contracts?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["Burr Computer Environments awarded Worley three engineering services contracts for US energy center projects. The scope includes engineering, detailed design and procurement support for behind-the-meter power serving data center campuses.","Planned systems combine gas turbines, aeroderivative turbines, reciprocating engines, battery storage and campus electrical distribution. US offices and a global engineering team will deliver the work. The announcement disclosed neither contract values nor total campus power capacity."],"sections":[]},"corrections":[{"at":"2026-10-06T21:55:42+03:00","language":"en","text":"The missing language translations for this article have been added."},{"at":"2026-10-07T00:57:19+03:00","language":"en","text":"German and Portuguese editions and translations of the data and correction explanations have been added to this article."}],"country":null,"data":null,"data_downloads":[],"data_types":[],"editorial_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-946eeae6-2e84-5f82-a718-6530e063e81b","event_period":"2026-08-26","event_period_basis":"event-or-reference-period","id":"worley-bcei-veri-merkezi-enerji-2026","image":null,"importance":0.4,"language":"en","modified_at":"2026-10-07T00:57:19+03:00","publication_basis":"source-date","published_at":"2026-08-26","reading_minutes":1,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"worley-wins-three-us-data-center-energy-engineering-contracts","sources":[{"checkedAt":"2026-10-02","name":"Worley","publishedAt":"2026-08-26","url":"https://www.worley.com/en/insights/our-news/low-carbon-energy/2026/bcei-contracts-us-data-center-expansion"}],"summary":"The BCEI awards cover design and procurement support.","text":"The BCEI awards cover design and procurement support.\n\nBurr Computer Environments awarded Worley three engineering services contracts for US energy center projects. The scope includes engineering, detailed design and procurement support for behind-the-meter power serving data center campuses.\n\nPlanned systems combine gas turbines, aeroderivative turbines, reciprocating engines, battery storage and campus electrical distribution. US offices and a global engineering team will deliver the work. The announcement disclosed neither contract values nor total campus power capacity.\n\nThe missing language translations for this article have been added.\n\nGerman and Portuguese editions and translations of the data and correction explanations have been added to this article.","title":"Worley wins three US data center energy engineering contracts","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/worley-wins-three-us-data-center-energy-engineering-contracts?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/worley-wins-three-us-data-center-energy-engineering-contracts"},{"api_url":"https://newsverum.com/api/v1/articles/worley-wins-three-us-data-center-energy-engineering-contracts?lang=en","language":"en","url":"https://newsverum.com/en/news/worley-wins-three-us-data-center-energy-engineering-contracts"},{"api_url":"https://newsverum.com/api/v1/articles/worley-wins-three-us-data-center-energy-engineering-contracts?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/worley-wins-three-us-data-center-energy-engineering-contracts"},{"api_url":"https://newsverum.com/api/v1/articles/worley-wins-three-us-data-center-energy-engineering-contracts?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/worley-wins-three-us-data-center-energy-engineering-contracts"},{"api_url":"https://newsverum.com/api/v1/articles/worley-wins-three-us-data-center-energy-engineering-contracts?lang=es","language":"es","url":"https://newsverum.com/es/news/worley-wins-three-us-data-center-energy-engineering-contracts"},{"api_url":"https://newsverum.com/api/v1/articles/worley-wins-three-us-data-center-energy-engineering-contracts?lang=de","language":"de","url":"https://newsverum.com/de/news/worley-wins-three-us-data-center-energy-engineering-contracts"},{"api_url":"https://newsverum.com/api/v1/articles/worley-wins-three-us-data-center-energy-engineering-contracts?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/worley-wins-three-us-data-center-energy-engineering-contracts"}],"url":"https://newsverum.com/en/news/worley-wins-three-us-data-center-energy-engineering-contracts"},"version":"1"}
