{"article":{"annotation":{"article_id":"westgold-beta-hunt-annualised-2-million-tonne-rate-september","available_at":"2026-10-21T14:40:37.214378Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"2e6bd37f437e31cf6ba9c2f43b2fd7559040a928eca2cc644c12761ea4073aac","input_sha256":"ec9207ead9af5a509f540074013c96e8563c206ace9fdc8c614a411b8d6aec24","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"AU","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.newswire.ca/news-releases/beta-hunt-infrastructure-investment-enables-2mtpa-run-rate-801156978.html"]}],"geometry":null,"id":"iso3166-1:AU","kind":"country-or-area","labels":{"ar":"أستراليا","en":"Australia","es":"Australia","fr":"Australie"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000349","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.newswire.ca/news-releases/beta-hunt-infrastructure-investment-enables-2mtpa-run-rate-801156978.html"]}],"method":"controlled-rules-v1","rule_id":"business-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september?lang=en","category":"business","content":{"key_points":[],"paragraphs":["Westgold Resources said on 21 October that its Beta Hunt underground mine in Western Australia achieved an annualised mining rate of 2 million tonnes in September. The company said this was recorded before its interim primary ventilation system was commissioned ahead of schedule at month-end.","Westgold said it invested A$33.3 million over two years to address constraints through ventilation, dewatering, water supply, power distribution and underground infrastructure upgrades. It is targeting sustained mining at 2 million tonnes per annum from Q2 FY27; that future target is distinct from the annualised September rate."],"sections":[]},"corrections":[],"country":"AU","data":{"blocks":[{"description":{"ar":"المعدل السنوي المحسوب في سبتمبر والهدف الذي تسعى ويست غولد إلى استدامته بدءاً من الربع الثاني للسنة المالية 2027.","de":"Annualisierte September-Rate und Zielrate, die Westgold ab dem zweiten Quartal FY27 dauerhaft erreichen will.","en":"The September annualised rate and Westgold’s target for a sustained rate from the second quarter of FY27.","es":"Ritmo anualizado alcanzado en septiembre y ritmo que Westgold pretende sostener desde el segundo trimestre del FY27.","fr":"Rythme annualisé atteint en septembre et rythme que Westgold vise à maintenir à partir du deuxième trimestre FY27.","pt":"Ritmo anualizado de setembro e meta que a Westgold pretende manter a partir do segundo trimestre do FY27.","tr":"Eylül ayında ulaşılan yıllıklandırılmış hız ve Westgold’un FY27’nin ikinci çeyreğinden itibaren hedeflediği sürdürülebilir hız."},"id":"beta-hunt-mining-rates","items":[{"basis":"estimate","label":{"ar":"معدل التعدين السنوي المحسوب","de":"Annualisierte Abbaurate","en":"Annualised mining rate","es":"Ritmo de extracción anualizado","fr":"Rythme d’extraction annualisé","pt":"Ritmo de mineração anualizado","tr":"Hızlandırılmış madencilik hızı"},"measure":{"aggregation":"rate","frequency":"monthly","geography":"australia","id":"westgold-beta-hunt-september-annualised-rate","periodRole":"reference-period","unitCode":"mtpa"},"period":"2026-09","unit":"million tonnes per annum","value":2},{"basis":"target","label":{"ar":"معدل التعدين المستدام المستهدف","de":"Angestrebte nachhaltige Abbaurate","en":"Target sustained mining rate","es":"Ritmo de extracción sostenido previsto","fr":"Rythme d’extraction durable visé","pt":"Ritmo de mineração sustentado pretendido","tr":"Hedeflenen sürdürülebilir madencilik hızı"},"measure":{"aggregation":"rate","frequency":"quarterly","geography":"australia","id":"westgold-beta-hunt-sustained-mining-target","periodRole":"reference-period","unitCode":"mtpa"},"period":"2026-12","periodStart":"2026-10","unit":"million tonnes per annum","value":2}],"methodology":{"ar":"أعلنت الشركة معدلاً سنوياً محسوباً لشهر سبتمبر، وليس كمية استخرجت خلال عام كامل. والمعدل المستدام هدف مستقبلي للربع الثاني من السنة المالية 2027.","de":"Das Unternehmen meldete eine annualisierte September-Rate: ein berechneter Wert, keine tatsächlich über ein ganzes Jahr geförderte Menge. Die nachhaltige Rate ist ein künftiges Ziel für Q2 FY27.","en":"The company reported an annualised September rate: this is a calculated rate, not tonnes mined over a full year. The sustained rate is a future target for Q2 FY27.","es":"La empresa informó de un ritmo anualizado de septiembre: es una tasa calculada, no toneladas extraídas en un año completo. El ritmo sostenido es una meta futura para el T2 del FY27.","fr":"L’entreprise a déclaré un rythme annualisé en septembre : il s’agit d’un taux calculé, et non du tonnage extrait sur une année entière. Le rythme durable est un objectif futur pour le T2 FY27.","pt":"A empresa informou uma taxa anualizada de setembro: trata-se de um ritmo calculado, não do volume extraído durante um ano inteiro. O ritmo sustentado é uma meta futura para o T2 do FY27.","tr":"Eylül için açıklanan yıllıklandırılmış kazı hızı, bir yılda fiilen çıkarılmış cevher miktarı değildir. Sürdürülebilir hız, Ekim–Aralık 2026 olan FY27 ikinci çeyreği için açıklanan hedeftir."},"sourceUrls":["https://www.newswire.ca/news-releases/beta-hunt-infrastructure-investment-enables-2mtpa-run-rate-801156978.html"],"title":{"ar":"معدلات التعدين في بيتا هانت","de":"Abbauraten bei Beta Hunt","en":"Beta Hunt mining rates","es":"Ritmos de extracción de Beta Hunt","fr":"Rythmes d’extraction de Beta Hunt","pt":"Ritmos de mineração de Beta Hunt","tr":"Beta Hunt madencilik hızları"},"type":"metrics","updatedAt":"2026-10-21T14:16:00Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september/data/beta-hunt-mining-rates?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september/data/beta-hunt-mining-rates?lang=en&format=json"},"id":"beta-hunt-mining-rates"}],"data_types":["metrics"],"editorial_illustration":{"alt":"Conceptual illustration of industry, engineering and logistics connections.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"event_id":"event-de15dae5-7f4f-58ba-88f7-ce1412d4b437","event_period":"2026-10-21","event_period_basis":"event-or-reference-period","id":"westgold-beta-hunt-annualised-2-million-tonne-rate-september","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-21T14:40:05+00:00","publication_basis":"publication-record","published_at":"2026-10-21T14:40:05+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Conceptual illustration of industry, engineering and logistics connections.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"slug":"westgold-beta-hunt-annualised-2-million-tonne-rate-september","sources":[{"checkedAt":"2026-10-21","name":"Westgold Resources Limited","publishedAt":"2026-10-21","url":"https://www.newswire.ca/news-releases/beta-hunt-infrastructure-investment-enables-2mtpa-run-rate-801156978.html"}],"summary":"The September run rate is not annual production; the company is targeting sustained output at that pace from Q2 FY27.","text":"The September run rate is not annual production; the company is targeting sustained output at that pace from Q2 FY27.\n\nWestgold Resources said on 21 October that its Beta Hunt underground mine in Western Australia achieved an annualised mining rate of 2 million tonnes in September. The company said this was recorded before its interim primary ventilation system was commissioned ahead of schedule at month-end.\n\nWestgold said it invested A$33.3 million over two years to address constraints through ventilation, dewatering, water supply, power distribution and underground infrastructure upgrades. It is targeting sustained mining at 2 million tonnes per annum from Q2 FY27; that future target is distinct from the annualised September rate.","title":"Westgold records an annualised 2 million-tonne rate at Beta Hunt","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/westgold-beta-hunt-annualised-2-million-tonne-rate-september"},{"api_url":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september?lang=en","language":"en","url":"https://newsverum.com/en/news/westgold-beta-hunt-annualised-2-million-tonne-rate-september"},{"api_url":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/westgold-beta-hunt-annualised-2-million-tonne-rate-september"},{"api_url":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/westgold-beta-hunt-annualised-2-million-tonne-rate-september"},{"api_url":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september?lang=es","language":"es","url":"https://newsverum.com/es/news/westgold-beta-hunt-annualised-2-million-tonne-rate-september"},{"api_url":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september?lang=de","language":"de","url":"https://newsverum.com/de/news/westgold-beta-hunt-annualised-2-million-tonne-rate-september"},{"api_url":"https://newsverum.com/api/v1/articles/westgold-beta-hunt-annualised-2-million-tonne-rate-september?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/westgold-beta-hunt-annualised-2-million-tonne-rate-september"}],"url":"https://newsverum.com/en/news/westgold-beta-hunt-annualised-2-million-tonne-rate-september"},"version":"1"}
