{"article":{"annotation":{"article_id":"vilanova-del-valles-starts-priority-flood-damage-repairs-2026","available_at":"2026-10-19T09:48:08.793519Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"0d8d89794a4c03db135270d894a50d07f6aba8ed74dce2842199ea0fb1d63607","input_sha256":"7e7ef74b3b7a7a57a76b6f5bb6e9da8247fbb1bdf958433eef49fe70b596aad2","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"ES","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"]}],"geometry":null,"id":"iso3166-1:ES","kind":"country-or-area","labels":{"ar":"إسبانيا","en":"Spain","es":"España","fr":"Espagne"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000154","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: floods","source_urls":["https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"]}],"method":"controlled-rules-v1","rule_id":"floods","status":"candidate"},{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=fr","category":"infrastructure","content":{"key_points":[],"paragraphs":["Le plan municipal publié le 18 octobre donne la priorité aux endroits présentant un risque pour les logements, des problèmes d’accès ou des atteintes aux services essentiels et au réseau routier. Il relève aussi deux interventions structurelles : augmenter la capacité hydraulique du pont de la BP-5002 sur le Mogent et réduire le risque d’inondation le long du ruisseau d’Ardenya.","La mairie indique avoir tenu le 9 octobre une réunion de coordination avec la Protection civile, l’Institut cartographique et géologique, l’Agence catalane de l’eau, les services d’infrastructures de la Generalitat et les pompiers. Les lieux d’intervention seront actualisés chaque semaine selon les priorités techniques ; les travaux peuvent perturber ponctuellement la circulation."],"sections":[]},"corrections":[],"country":"ES","data":{"blocks":[{"description":{"ar":"الجدول وخطوات التنسيق الواردة في خطة البلدية بتاريخ 18 أكتوبر 2026.","de":"Zeitplan und Koordinierungsschritte aus dem kommunalen Plan vom 18. Oktober 2026.","en":"Schedule and coordination steps stated in the municipality’s 18 October 2026 plan.","es":"Calendario y coordinación señalados en el plan municipal del 18 de octubre de 2026.","fr":"Calendrier et coordination indiqués dans le plan municipal du 18 octobre 2026.","pt":"Calendário e coordenação indicados no plano municipal de 18 de outubro de 2026.","tr":"Belediyenin 18 Ekim 2026 planında belirtilen takvim ve koordinasyon adımları."},"id":"vilanova-flood-recovery-timeline","items":[{"date":"2026-10-04","description":{"ar":"تسببت الأمطار بأضرار في البنية التحتية البلدية.","de":"Der Starkregen beschädigte kommunale Infrastruktur.","en":"Rain damaged municipal infrastructure.","es":"Las lluvias dañaron infraestructuras municipales.","fr":"Les pluies ont endommagé les infrastructures municipales.","pt":"A chuva danificou infraestruturas municipais.","tr":"Yağışlar belediye altyapısında hasara yol açtı."},"label":{"ar":"أمطار غزيرة وفيضانات","de":"Starkregen und Überschwemmungen","en":"Heavy rain and flooding","es":"Lluvias intensas e inundaciones","fr":"Fortes pluies et inondations","pt":"Chuva intensa e inundações","tr":"Aşırı yağış ve taşkınlar"},"status":"occurred"},{"date":"2026-10-09","description":{"ar":"ناقشت البلدية والجهات الإقليمية الأولويات.","de":"Kommunale und regionale Stellen stimmten Prioritäten ab.","en":"Municipal and regional bodies discussed priorities.","es":"El ayuntamiento y organismos regionales examinaron las prioridades.","fr":"La mairie et les organismes régionaux ont examiné les priorités.","pt":"A Câmara e as entidades regionais discutiram prioridades.","tr":"Belediye ve bölgesel kurumlar öncelikleri görüştü."},"label":{"ar":"اجتماع تنسيق بين الجهات","de":"Koordinierungssitzung der Behörden","en":"Inter-agency coordination meeting","es":"Reunión de coordinación entre organismos","fr":"Réunion de coordination entre organismes","pt":"Reunião de coordenação entre entidades","tr":"Kurumlar arası koordinasyon toplantısı"},"status":"occurred"},{"date":"2026-10-19","description":{"ar":"كان من المقرر أن يبدأ فريقان العمل على الطرق ومنحدرات المجرى.","de":"Zwei Teams sollten Arbeiten an Straßen und Bachböschungen beginnen.","en":"Two teams were scheduled to begin work on roads and stream slopes.","es":"Estaba previsto que dos equipos comenzaran trabajos en caminos y taludes.","fr":"Deux équipes devaient commencer à travailler sur les routes et les talus du ruisseau.","pt":"Estava previsto que duas equipas começassem trabalhos em estradas e taludes.","tr":"İki ekip yol ve dere yamaçlarında çalışmaya başlayacak."},"label":{"ar":"بدء أعمال الإصلاح الأولى","de":"Erste Reparaturarbeiten","en":"First repair works","es":"Primeras obras de reparación","fr":"Premiers travaux de réparation","pt":"Primeiros trabalhos de reparação","tr":"İlk onarım çalışmaları"},"status":"scheduled"}],"methodology":{"ar":"التواريخ والحالات وفق إشعار البلدية؛ وكانت أعمال 19 أكتوبر مقررة فيه.","de":"Daten und Status entsprechen der Mitteilung der Stadt; die Arbeiten am 19. Oktober waren darin geplant.","en":"Dates and statuses follow the municipality’s notice; the 19 October works were scheduled in that notice.","es":"Fechas y estados según el aviso municipal; las obras del 19 de octubre estaban previstas en ese aviso.","fr":"Les dates et statuts suivent l’avis municipal ; les travaux du 19 octobre y étaient annoncés.","pt":"As datas e os estados seguem o aviso municipal; os trabalhos de 19 de outubro estavam previstos nesse aviso.","tr":"Tarihler ve durum, belediyenin duyurusunda yayımlanan tarihlere göre verildi; 19 Ekim çalışmaları duyuruda planlanmıştı."},"sourceUrls":["https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"],"title":{"ar":"الأعمال ذات الأولوية بعد الفيضانات","de":"Vorrangige Arbeiten nach Überschwemmungen","en":"Priority works after flooding","es":"Obras prioritarias tras las inundaciones","fr":"Travaux prioritaires après les inondations","pt":"Trabalhos prioritários após as inundações","tr":"Seller sonrası öncelikli çalışmalar"},"type":"events","updatedAt":"2026-10-19T08:36:37Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026/data/vilanova-flood-recovery-timeline?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026/data/vilanova-flood-recovery-timeline?lang=fr&format=json"},"id":"vilanova-flood-recovery-timeline"}],"data_types":["events"],"editorial_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-49c26628-3cd3-5973-b4d9-e86b5d6acad0","event_period":"2026-10-19","event_period_basis":"event-or-reference-period","id":"vilanova-del-valles-starts-priority-flood-damage-repairs-2026","image":null,"importance":0.6,"language":"fr","modified_at":"2026-10-19T09:46:58+00:00","publication_basis":"publication-record","published_at":"2026-10-19T09:46:58+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"vilanova-del-valles-starts-priority-flood-damage-repairs-2026","sources":[{"checkedAt":"2026-10-19","name":"Ajuntament de Vilanova del Vallès","publishedAt":"2026-10-18","url":"https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"}],"summary":"La mairie de Vilanova del Vallès a annoncé que les premiers travaux visant à rétablir la sécurité des infrastructures touchées par les inondations du 4 octobre commenceraient le 19 octobre. Deux équipes interviendront sur les talus du ruisseau d’Ardenya, le chemin de Vilassar et la route de Can Bosc.","text":"La mairie de Vilanova del Vallès a annoncé que les premiers travaux visant à rétablir la sécurité des infrastructures touchées par les inondations du 4 octobre commenceraient le 19 octobre. Deux équipes interviendront sur les talus du ruisseau d’Ardenya, le chemin de Vilassar et la route de Can Bosc.\n\nLe plan municipal publié le 18 octobre donne la priorité aux endroits présentant un risque pour les logements, des problèmes d’accès ou des atteintes aux services essentiels et au réseau routier. Il relève aussi deux interventions structurelles : augmenter la capacité hydraulique du pont de la BP-5002 sur le Mogent et réduire le risque d’inondation le long du ruisseau d’Ardenya.\n\nLa mairie indique avoir tenu le 9 octobre une réunion de coordination avec la Protection civile, l’Institut cartographique et géologique, l’Agence catalane de l’eau, les services d’infrastructures de la Generalitat et les pompiers. Les lieux d’intervention seront actualisés chaque semaine selon les priorités techniques ; les travaux peuvent perturber ponctuellement la circulation.","title":"Vilanova del Vallès lance des réparations prioritaires après les inondations","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"}],"url":"https://newsverum.com/fr/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},"version":"1"}
