{"article":{"annotation":{"article_id":"vilanova-del-valles-starts-priority-flood-damage-repairs-2026","available_at":"2026-10-19T09:48:08.793519Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"0d8d89794a4c03db135270d894a50d07f6aba8ed74dce2842199ea0fb1d63607","input_sha256":"7e7ef74b3b7a7a57a76b6f5bb6e9da8247fbb1bdf958433eef49fe70b596aad2","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"ES","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"]}],"geometry":null,"id":"iso3166-1:ES","kind":"country-or-area","labels":{"ar":"إسبانيا","en":"Spain","es":"España","fr":"Espagne"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000154","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: floods","source_urls":["https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"]}],"method":"controlled-rules-v1","rule_id":"floods","status":"candidate"},{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=es","category":"infrastructure","content":{"key_points":[],"paragraphs":["El plan municipal, publicado el 18 de octubre, prioriza los puntos con riesgo para viviendas, problemas de acceso o afecciones a servicios básicos y carreteras. También identifica dos intervenciones estructurales: ampliar la capacidad hidráulica del puente de la BP-5002 sobre el Mogent y reducir el riesgo de inundación en la riera d’Ardenya.","El consistorio informó de una reunión de coordinación celebrada el 9 de octubre con Protección Civil, el Instituto Cartográfico y Geológico, la Agencia Catalana del Agua, el área de infraestructuras de la Generalitat y los Bomberos. Los puntos de trabajo se actualizarán semanalmente según criterios técnicos; algunas obras podrían causar afecciones puntuales al tráfico."],"sections":[]},"corrections":[],"country":"ES","data":{"blocks":[{"description":{"ar":"الجدول وخطوات التنسيق الواردة في خطة البلدية بتاريخ 18 أكتوبر 2026.","de":"Zeitplan und Koordinierungsschritte aus dem kommunalen Plan vom 18. Oktober 2026.","en":"Schedule and coordination steps stated in the municipality’s 18 October 2026 plan.","es":"Calendario y coordinación señalados en el plan municipal del 18 de octubre de 2026.","fr":"Calendrier et coordination indiqués dans le plan municipal du 18 octobre 2026.","pt":"Calendário e coordenação indicados no plano municipal de 18 de outubro de 2026.","tr":"Belediyenin 18 Ekim 2026 planında belirtilen takvim ve koordinasyon adımları."},"id":"vilanova-flood-recovery-timeline","items":[{"date":"2026-10-04","description":{"ar":"تسببت الأمطار بأضرار في البنية التحتية البلدية.","de":"Der Starkregen beschädigte kommunale Infrastruktur.","en":"Rain damaged municipal infrastructure.","es":"Las lluvias dañaron infraestructuras municipales.","fr":"Les pluies ont endommagé les infrastructures municipales.","pt":"A chuva danificou infraestruturas municipais.","tr":"Yağışlar belediye altyapısında hasara yol açtı."},"label":{"ar":"أمطار غزيرة وفيضانات","de":"Starkregen und Überschwemmungen","en":"Heavy rain and flooding","es":"Lluvias intensas e inundaciones","fr":"Fortes pluies et inondations","pt":"Chuva intensa e inundações","tr":"Aşırı yağış ve taşkınlar"},"status":"occurred"},{"date":"2026-10-09","description":{"ar":"ناقشت البلدية والجهات الإقليمية الأولويات.","de":"Kommunale und regionale Stellen stimmten Prioritäten ab.","en":"Municipal and regional bodies discussed priorities.","es":"El ayuntamiento y organismos regionales examinaron las prioridades.","fr":"La mairie et les organismes régionaux ont examiné les priorités.","pt":"A Câmara e as entidades regionais discutiram prioridades.","tr":"Belediye ve bölgesel kurumlar öncelikleri görüştü."},"label":{"ar":"اجتماع تنسيق بين الجهات","de":"Koordinierungssitzung der Behörden","en":"Inter-agency coordination meeting","es":"Reunión de coordinación entre organismos","fr":"Réunion de coordination entre organismes","pt":"Reunião de coordenação entre entidades","tr":"Kurumlar arası koordinasyon toplantısı"},"status":"occurred"},{"date":"2026-10-19","description":{"ar":"كان من المقرر أن يبدأ فريقان العمل على الطرق ومنحدرات المجرى.","de":"Zwei Teams sollten Arbeiten an Straßen und Bachböschungen beginnen.","en":"Two teams were scheduled to begin work on roads and stream slopes.","es":"Estaba previsto que dos equipos comenzaran trabajos en caminos y taludes.","fr":"Deux équipes devaient commencer à travailler sur les routes et les talus du ruisseau.","pt":"Estava previsto que duas equipas começassem trabalhos em estradas e taludes.","tr":"İki ekip yol ve dere yamaçlarında çalışmaya başlayacak."},"label":{"ar":"بدء أعمال الإصلاح الأولى","de":"Erste Reparaturarbeiten","en":"First repair works","es":"Primeras obras de reparación","fr":"Premiers travaux de réparation","pt":"Primeiros trabalhos de reparação","tr":"İlk onarım çalışmaları"},"status":"scheduled"}],"methodology":{"ar":"التواريخ والحالات وفق إشعار البلدية؛ وكانت أعمال 19 أكتوبر مقررة فيه.","de":"Daten und Status entsprechen der Mitteilung der Stadt; die Arbeiten am 19. Oktober waren darin geplant.","en":"Dates and statuses follow the municipality’s notice; the 19 October works were scheduled in that notice.","es":"Fechas y estados según el aviso municipal; las obras del 19 de octubre estaban previstas en ese aviso.","fr":"Les dates et statuts suivent l’avis municipal ; les travaux du 19 octobre y étaient annoncés.","pt":"As datas e os estados seguem o aviso municipal; os trabalhos de 19 de outubro estavam previstos nesse aviso.","tr":"Tarihler ve durum, belediyenin duyurusunda yayımlanan tarihlere göre verildi; 19 Ekim çalışmaları duyuruda planlanmıştı."},"sourceUrls":["https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"],"title":{"ar":"الأعمال ذات الأولوية بعد الفيضانات","de":"Vorrangige Arbeiten nach Überschwemmungen","en":"Priority works after flooding","es":"Obras prioritarias tras las inundaciones","fr":"Travaux prioritaires après les inondations","pt":"Trabalhos prioritários após as inundações","tr":"Seller sonrası öncelikli çalışmalar"},"type":"events","updatedAt":"2026-10-19T08:36:37Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026/data/vilanova-flood-recovery-timeline?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026/data/vilanova-flood-recovery-timeline?lang=es&format=json"},"id":"vilanova-flood-recovery-timeline"}],"data_types":["events"],"editorial_illustration":{"alt":"Ilustración conceptual de transporte, puentes y conexiones de infraestructura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-49c26628-3cd3-5973-b4d9-e86b5d6acad0","event_period":"2026-10-19","event_period_basis":"event-or-reference-period","id":"vilanova-del-valles-starts-priority-flood-damage-repairs-2026","image":null,"importance":0.6,"language":"es","modified_at":"2026-10-19T09:46:58+00:00","publication_basis":"publication-record","published_at":"2026-10-19T09:46:58+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Ilustración conceptual de transporte, puentes y conexiones de infraestructura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"vilanova-del-valles-starts-priority-flood-damage-repairs-2026","sources":[{"checkedAt":"2026-10-19","name":"Ajuntament de Vilanova del Vallès","publishedAt":"2026-10-18","url":"https://www.vilanovadelvalles.cat/actualitat/noticies/vilanova-prioritza-les-actuacions-per-recuperar-la-seguretat-de-les-infraestructures-afectades-pels-aiguats.html"}],"summary":"El Ayuntamiento de Vilanova del Vallès anunció que el 19 de octubre comenzarían las primeras obras para recuperar la seguridad de las infraestructuras dañadas por las inundaciones del 4 de octubre. Dos equipos actuarán en taludes de la riera d’Ardenya, el camino de Vilassar y la carretera de Can Bosc.","text":"El Ayuntamiento de Vilanova del Vallès anunció que el 19 de octubre comenzarían las primeras obras para recuperar la seguridad de las infraestructuras dañadas por las inundaciones del 4 de octubre. Dos equipos actuarán en taludes de la riera d’Ardenya, el camino de Vilassar y la carretera de Can Bosc.\n\nEl plan municipal, publicado el 18 de octubre, prioriza los puntos con riesgo para viviendas, problemas de acceso o afecciones a servicios básicos y carreteras. También identifica dos intervenciones estructurales: ampliar la capacidad hidráulica del puente de la BP-5002 sobre el Mogent y reducir el riesgo de inundación en la riera d’Ardenya.\n\nEl consistorio informó de una reunión de coordinación celebrada el 9 de octubre con Protección Civil, el Instituto Cartográfico y Geológico, la Agencia Catalana del Agua, el área de infraestructuras de la Generalitat y los Bomberos. Los puntos de trabajo se actualizarán semanalmente según criterios técnicos; algunas obras podrían causar afecciones puntuales al tráfico.","title":"Vilanova del Vallès inicia reparaciones prioritarias tras las inundaciones","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},{"api_url":"https://newsverum.com/api/v1/articles/vilanova-del-valles-starts-priority-flood-damage-repairs-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"}],"url":"https://newsverum.com/es/news/vilanova-del-valles-starts-priority-flood-damage-repairs-2026"},"version":"1"}
