{"article_url":"https://newsverum.com/pt/news/uk-energy-dogger-bank-offshore-wind-farm-phase-c-turbines-2026-11-01","block":{"description":{"ar":"تقرير العمليات الرسمي حول Dogger Bank Wind Farm Consortium في المملكة المتحدة.","de":"Offizieller Betriebsbericht zu Dogger Bank Wind Farm Consortium im Vereinigten Königreich.","en":"Official operations report on Dogger Bank Wind Farm Consortium in the United Kingdom.","es":"Informe oficial de operaciones de Dogger Bank Wind Farm Consortium en el Reino Unido.","fr":"Rapport officiel des opérations de Dogger Bank Wind Farm Consortium au Royaume-Uni.","pt":"Relatório oficial de operações de Dogger Bank Wind Farm Consortium no Reino Unido.","tr":"Birleşik Krallık genelinde Dogger Bank Wind Farm Consortium üzerine resmi operasyon raporu."},"id":"overview-event","items":[{"date":"2026-11-01","description":{"ar":"اكتمال التحقق الهندسي الرسمي والاعتماد التنظيمي عبر كافة مرافق المشروع.","de":"Formelle technische Validierung und behördliche Zertifizierung am Standort abgeschlossen.","en":"Formal engineering validation and multi-agency regulatory certification concluded across the site.","es":"Validación técnica formal y certificación regulatoria concluidas en las instalaciones.","fr":"Validation technique formelle et certification réglementaire multi-agences conclues sur le site.","pt":"Validação técnica formal e certificação regulatória concluídas nas instalações.","tr":"Saha genelinde resmi mühendislik doğrulaması ve çok kurumlu düzenleyici sertifikasyonu tamamlandı."},"label":{"ar":"تسليم المرحلة التشغيلية: Dogger Bank Wind Farm Consortium","de":"Übergabe der Betriebsphase: Dogger Bank Wind Farm Consortium","en":"Operational Phase Delivery: Dogger Bank Wind Farm Consortium","es":"Entrega de la Fase Operativa: Dogger Bank Wind Farm Consortium","fr":"Livraison de la Phase Opérationnelle: Dogger Bank Wind Farm Consortium","pt":"Entrega da Fase Operacional: Dogger Bank Wind Farm Consortium","tr":"Operasyonel Aşama Teslimi: Dogger Bank Wind Farm Consortium"},"status":"occurred"}],"methodology":{"ar":"تم التجميع من وثائق مؤسسية موثقة وسجلات عامة وإحصاءات رسمية.","de":"Zusammengestellt aus verifizierter institutioneller Dokumentation und offiziellen Daten.","en":"Compiled from verified institutional documentation, public records, and official statistics.","es":"Compilado a partir de documentación institucional verificada y registros estadísticos oficiales.","fr":"Compilé à partir de documents institutionnels vérifiés et de statistiques officielles.","pt":"Compilado a partir de documentação institucional verificada e registos estatísticos oficiais.","tr":"Doğrulanmış kurumsal belgeler, resmi istatistikler ve kamuya açık kayıtlardan derlenmiştir."},"sourceUrls":["https://doggerbank.com/press-releases/phase-c-offshore-turbine-installation-milestone-november-2026"],"title":{"ar":"Dogger Bank Wind Farm Consortium تنجز عملياتها الاستراتيجية في المملكة المتحدة","de":"Dogger Bank Wind Farm Consortium Schließt Strategische Operationen im Vereinigten Königreich Ab","en":"Dogger Bank Wind Farm Consortium Completes Strategic Operations Across the United Kingdom","es":"Dogger Bank Wind Farm Consortium Completa sus Operaciones Estratégicas en el Reino Unido","fr":"Dogger Bank Wind Farm Consortium Achève ses Opérations Stratégiques au Royaume-Uni","pt":"Dogger Bank Wind Farm Consortium Conclui Operações Estratégicas no Reino Unido","tr":"Dogger Bank Wind Farm Consortium Birleşik Krallık Genelinde Stratejik Operasyonlarını Tamamladı"},"type":"events","updatedAt":"2026-11-01T00:00:00Z"},"version":1}
