{"article":{"annotation":{"article_id":"uk-data-centre-siting-science-advice-grid-water-local-trust","available_at":"2026-11-12T17:29:17.155631Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"c2f2de4a0c9052b9f833f6adb24619634ea8931de1c2a192e3dc7020f3becb1d","input_sha256":"156813df6c807840ec90393e76ca7c0e729d8dc0057afc28cf45e31f6541396d","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"GB","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.gov.uk/government/publications/data-centre-siting-in-the-uk/data-centre-siting-in-the-uk"]}],"geometry":null,"id":"iso3166-1:GB","kind":"country-or-area","labels":{"ar":"المملكة المتحدة لبريطانيا العظمى وآيرلندا الشمالية","en":"United Kingdom of Great Britain and Northern Ireland","es":"Reino Unido de Gran Bretaña e Irlanda del Norte","fr":"Royaume-Uni de Grande-Bretagne et d’Irlande du Nord"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:13000000","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.gov.uk/government/publications/data-centre-siting-in-the-uk/data-centre-siting-in-the-uk"]}],"method":"controlled-rules-v1","rule_id":"technology-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust?lang=en","category":"technology","content":{"key_points":[],"paragraphs":["The UK Government Office for Science published notes on November 12 from a February roundtable about where future domestic data centres should be located. The discussion, chaired by the government chief scientific adviser, concluded that there is no obvious framework for predicting the amount of onshore capacity the country will need. It recommended assessing which workloads require UK facilities and what public or private functions they serve. The publication expressly says it is not a statement of government policy; it records combined views from participants at the time.","The notes frame demand as uncertain because it depends on the pace of artificial-intelligence adoption, commercial activity, data-protection choices and the level of sovereignty government wants for sensitive information. Cloud facilities increasingly combine conventional computing with AI workloads, while businesses may not distinguish between the types of service they purchase. The experts therefore suggested planning around tasks, latency, data sensitivity and reliability rather than assuming that every sector needs a separate facility or assigning capacity from a single national forecast.","Location decisions carry different technical requirements. Smaller edge facilities can place computing closer to devices and users, while large hyperscale sites need land, substantial power and cooling. AI training can often tolerate more latency than inference services that respond to user requests. The report notes that financial trading and some public services may value very fast connections or domestic data handling, while other workloads could be delivered from overseas or centralized sites. These are examples discussed at the meeting, not a complete inventory of confirmed UK demand.","Grid access emerged as a key constraint. The notes say delays in securing connections influence siting and could undermine digital-growth objectives. They also recommend a national interactive map of data centres, fibre routes, power lines and related infrastructure. Such a map could help planners and communities see where capacity is concentrated, but its usefulness would depend on current data, common definitions and the treatment of commercially sensitive information. The roundtable did not provide a quantified estimate of current UK capacity or a forecast for future gigawatts.","Water needs were described as less decisive for UK siting than power availability, partly because facilities can use closed-loop cooling or ventilation in the country's relatively cool climate. That does not make water irrelevant. The report highlights a trade-off: systems that use less water can consume more electricity, and cooling design must account for regional conditions such as flood risk. The notes also discuss climate adaptation, including future temperatures and water availability, so a site that appears suitable under current conditions may face different operating constraints later.","Carbon emissions and local acceptance are additional considerations. The meeting notes say data centres have limited control over the power mix available at a given location and suggest considering incentives to co-locate facilities with low-carbon generation. Participants also argued that communities need transparent planning procedures and credible evidence of local benefits. Claims about jobs or protection from electricity price increases should be testable. That recommendation matters because a national digital infrastructure case does not by itself establish that a specific community will receive lasting employment or lower bills.","Waste heat could be reused for services such as laundries, food preparation or greenhouses, but the notes say UK opportunities are limited without district heating networks and when facilities are built far from suitable users. The point is practical: heat reuse depends on proximity and infrastructure, not only on the temperature of exhaust air. Likewise, the suggestion to map sites and connections is an expert recommendation rather than a funded programme. No deadline, budget or legal change is announced in this publication.","The document offers a set of planning questions rather than an approved siting policy. It brings together competing needs for digital resilience, power connections, land, emissions, cooling, security and community trust, while acknowledging that future demand is difficult to calculate. Its immediate news value is that the government science office has made these trade-offs public. The next steps depend on policymakers and local authorities deciding whether to turn the advice into formal guidance, data systems or planning rules. Those decisions are not made by the meeting notes themselves."],"sections":[]},"corrections":[],"country":"GB","data":{"blocks":[{"columns":[{"key":"measure","label":{"ar":"المقياس","de":"Kennzahl","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Ölçüt"},"language":"en","type":"text"},{"key":"detail","label":{"ar":"القيمة أو النطاق المعلن","de":"Gemeldeter Wert oder Umfang","en":"Reported value or scope","es":"Valor o alcance comunicado","fr":"Valeur ou périmètre communiqué","pt":"Valor ou âmbito comunicado","tr":"Bildirilen değer veya kapsam"},"language":"en","type":"text"}],"description":{"ar":"عوامل التخطيط المسجلة في ملخص المائدة المستديرة لمكتب العلوم الحكومي المنشور في نوفمبر 2026.","de":"Planungsfaktoren aus einer im November 2026 veröffentlichten Zusammenfassung eines Runden Tisches des Government Office for Science.","en":"Planning factors recorded in a Government Office for Science roundtable summary published in November 2026.","es":"Factores de planificación recogidos en el resumen de una mesa redonda de la Oficina Gubernamental para la Ciencia publicado en noviembre de 2026.","fr":"Facteurs de planification consignés dans le résumé d’une table ronde du Government Office for Science publié en novembre 2026.","pt":"Fatores de planeamento registados no resumo da mesa-redonda do Government Office for Science, publicado em novembro de 2026.","tr":"Kasım 2026’da yayımlanan Hükümet Bilim Ofisi yuvarlak masa özetiyle kaydedilen planlama etkenleri."},"id":"reported-data","methodology":{"ar":"يلخص هذا الجدول التوصيات ونقاط النقاش الواردة في ملاحظات الاجتماع الرسمية. عُقدت المائدة المستديرة في 20 فبراير 2026. وتقول الوثيقة إن الآراء المشتركة للمشاركين ليست سياسة حكومية ولا تقدم توقعاً للسعة الوطنية.","de":"Diese Tabelle fasst Empfehlungen und Diskussionspunkte aus den offiziellen Sitzungsnotizen zusammen. Der Runde Tisch fand am 20. Februar 2026 statt. Die Veröffentlichung erklärt, dass die gemeinsamen Ansichten der Teilnehmer keine Regierungspolitik sind, und enthält keine nationale Kapazitätsprognose.","en":"This table summarizes recommendations and discussion points in the official meeting notes. The roundtable took place on 20 February 2026. The publication states that its combined participant views are not government policy and provides no national capacity forecast.","es":"Esta tabla resume recomendaciones y puntos debatidos en las notas oficiales de la reunión. La mesa redonda tuvo lugar el 20 de febrero de 2026. La publicación indica que las opiniones conjuntas de los participantes no son política gubernamental y no ofrece una previsión nacional de capacidad.","fr":"Ce tableau résume les recommandations et les points de discussion des notes officielles. La table ronde s’est tenue le 20 février 2026. La publication précise que les points de vue collectifs des participants ne constituent pas une politique gouvernementale et ne fournit aucune prévision nationale de capacité.","pt":"Esta tabela resume recomendações e pontos de discussão constantes das notas oficiais da reunião. A mesa-redonda realizou-se em 20 de fevereiro de 2026. A publicação afirma que as opiniões conjuntas dos participantes não são política governamental e não apresenta uma previsão nacional de capacidade.","tr":"Bu tablo resmî toplantı notlarındaki öneri ve tartışma noktalarını özetler. Yuvarlak masa 20 Şubat 2026’da yapıldı. Yayın, katılımcıların ortak görüşlerinin hükümet politikası olmadığını belirtir ve ulusal kapasite tahmini sunmaz."},"rowTranslations":[{"detail":{"ar":"قال المشاركون إنه لا يوجد إطار واضح لتقدير سعة مراكز البيانات المستقبلية داخل المملكة المتحدة.","de":"Teilnehmer sagten, es gebe keinen offensichtlichen Rahmen zur Schätzung künftiger Rechenzentrumskapazität im Vereinigten Königreich.","en":"Participants said there is no obvious framework for estimating future UK onshore data-centre capacity.","es":"Los participantes dijeron que no existe un marco evidente para calcular la futura capacidad nacional de centros de datos del Reino Unido.","fr":"Les participants ont indiqué qu’il n’existait pas de cadre évident pour estimer la future capacité nationale des centres de données au Royaume-Uni.","pt":"Os participantes disseram que não existe um quadro evidente para estimar a futura capacidade nacional de centros de dados no Reino Unido.","tr":"Katılımcılar, Birleşik Krallık’taki gelecekteki yerel veri merkezi kapasitesini tahmin etmek için belirgin bir çerçeve olmadığını söyledi."},"measure":{"ar":"توقع الطلب","de":"Nachfrageprognose","en":"Demand forecasting","es":"Previsión de la demanda","fr":"Prévision de la demande","pt":"Previsão da procura","tr":"Talep tahmini"}},{"detail":{"ar":"حُددت تأخيرات التوصيل بوصفها عاملاً رئيسياً في قرارات اختيار المواقع.","de":"Verzögerungen bei Anschlüssen wurden als wichtiger Faktor für Standortentscheidungen erkannt.","en":"Connection delays were identified as a key factor in siting decisions.","es":"Los retrasos en las conexiones se identificaron como un factor clave para las decisiones de ubicación.","fr":"Les retards de raccordement ont été identifiés comme un facteur clé des décisions d’implantation.","pt":"Os atrasos nas ligações foram identificados como um fator essencial nas decisões de localização.","tr":"Bağlantı gecikmeleri yer seçimi kararlarında temel bir etken olarak belirlendi."},"measure":{"ar":"الوصول إلى الشبكة","de":"Netzanschluss","en":"Grid access","es":"Acceso a la red","fr":"Accès au réseau","pt":"Acesso à rede","tr":"Şebeke erişimi"}},{"detail":{"ar":"خريطة وطنية تفاعلية لمراكز البيانات ومسارات الألياف وخطوط الطاقة والبنية التحتية ذات الصلة.","de":"Eine interaktive nationale Karte von Rechenzentren, Glasfaserstrecken, Stromleitungen und zugehöriger Infrastruktur.","en":"An interactive national map of data centres, fibre routes, power lines and related infrastructure.","es":"Un mapa nacional interactivo de centros de datos, rutas de fibra, líneas eléctricas e infraestructura relacionada.","fr":"Une carte nationale interactive des centres de données, des tracés de fibre, des lignes électriques et des infrastructures associées.","pt":"Um mapa nacional interativo de centros de dados, rotas de fibra, linhas elétricas e infraestruturas relacionadas.","tr":"Veri merkezlerini, fiber güzergâhlarını, enerji hatlarını ve ilgili altyapıyı gösteren etkileşimli ulusal harita."},"measure":{"ar":"أداة التخطيط المقترحة","de":"Vorgeschlagenes Planungsinstrument","en":"Suggested planning tool","es":"Herramienta de planificación propuesta","fr":"Outil de planification proposé","pt":"Ferramenta de planeamento sugerida","tr":"Önerilen planlama aracı"}},{"detail":{"ar":"لم توصف المياه بأنها قيد رئيسي للمواقع في المملكة المتحدة، لكن خفض استهلاكها قد يتطلب طاقة أكبر.","de":"Wasser wird nicht als große Standortbeschränkung im Vereinigten Königreich beschrieben, doch ein geringerer Wasserverbrauch kann mehr Strom erfordern.","en":"Water is not described as a major UK siting constraint, but lower water use can require more power.","es":"El agua no se describe como una gran limitación para la ubicación en el Reino Unido, pero reducir su uso puede requerir más electricidad.","fr":"L’eau n’est pas présentée comme une contrainte majeure d’implantation au Royaume-Uni, mais une moindre consommation d’eau peut nécessiter davantage d’électricité.","pt":"A água não é descrita como uma grande restrição de localização no Reino Unido, mas uma utilização menor de água pode exigir mais eletricidade.","tr":"Su, Birleşik Krallık’ta önemli bir yer seçimi kısıtı olarak tanımlanmıyor, ancak daha az su kullanımı daha fazla enerji gerektirebilir."},"measure":{"ar":"المياه والطاقة","de":"Wasser und Strom","en":"Water and power","es":"Agua y energía","fr":"Eau et électricité","pt":"Água e energia","tr":"Su ve enerji"}},{"detail":{"ar":"اعتُبرت شفافية التخطيط والأدلة على المنافع المجتمعية المعلنة أمراً مهماً.","de":"Transparente Planung und Belege für behauptete Vorteile für Gemeinden wurden als wichtig eingestuft.","en":"Planning transparency and evidence for claimed community benefits were identified as important.","es":"Se consideraron importantes la transparencia de la planificación y las pruebas de los beneficios comunitarios alegados.","fr":"La transparence de l’urbanisme et les preuves des avantages annoncés pour les communautés ont été jugées importantes.","pt":"A transparência do planeamento e provas dos benefícios comunitários alegados foram consideradas importantes.","tr":"Planlama şeffaflığı ve topluluk faydası iddialarına ilişkin kanıtlar önemli görüldü."},"measure":{"ar":"الشرعية المحلية","de":"Lokale Legitimität","en":"Local legitimacy","es":"Legitimidad local","fr":"Légitimité locale","pt":"Legitimidade local","tr":"Yerel meşruiyet"}},{"detail":{"ar":"ملاحظات اجتماع 20 فبراير 2026؛ وتنص صراحة على أنها ليست بياناً لسياسة الحكومة.","de":"Sitzungsnotizen vom 20. Februar 2026; ausdrücklich keine Erklärung zur Regierungspolitik.","en":"Meeting notes from 20 February 2026; expressly not a statement of government policy.","es":"Notas de la reunión del 20 de febrero de 2026; expresamente no son una declaración de política gubernamental.","fr":"Notes de réunion du 20 février 2026; elles ne constituent expressément pas une déclaration de politique gouvernementale.","pt":"Notas da reunião de 20 de fevereiro de 2026; afirmam expressamente que não são uma declaração de política governamental.","tr":"20 Şubat 2026 tarihli toplantı notları; açıkça hükümet politikası açıklaması değildir."},"measure":{"ar":"وضع السياسة","de":"Politischer Status","en":"Policy status","es":"Estado de la política","fr":"Statut politique","pt":"Estado da política","tr":"Politika statüsü"}}],"rows":[{"detail":"Participants said there is no obvious framework for estimating future UK onshore data-centre capacity.","measure":"Demand forecasting"},{"detail":"Connection delays were identified as a key factor in siting decisions.","measure":"Grid access"},{"detail":"An interactive national map of data centres, fibre routes, power lines and related infrastructure.","measure":"Suggested planning tool"},{"detail":"Water is not described as a major UK siting constraint, but lower water use can require more power.","measure":"Water and power"},{"detail":"Planning transparency and evidence for claimed community benefits were identified as important.","measure":"Local legitimacy"},{"detail":"Meeting notes from 20 February 2026; expressly not a statement of government policy.","measure":"Policy status"}],"sourceUrls":["https://www.gov.uk/government/publications/data-centre-siting-in-the-uk/data-centre-siting-in-the-uk"],"title":{"ar":"تخطيط مواقع مراكز البيانات في المملكة المتحدة: نتائج اجتماع الخبراء","de":"Standortwahl für Rechenzentren im Vereinigten Königreich: Ergebnisse des Experten-Runden Tisches","en":"UK data-centre siting: expert roundtable findings","es":"Ubicación de centros de datos en el Reino Unido: conclusiones de la mesa redonda de expertos","fr":"Implantation des centres de données au Royaume-Uni: conclusions de la table ronde d’experts","pt":"Localização de centros de dados no Reino Unido: conclusões da mesa-redonda de especialistas","tr":"Birleşik Krallık veri merkezi yer seçimi: uzman yuvarlak masa bulguları"},"type":"table","updatedAt":"2026-11-12T16:38:17Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust/data/reported-data?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust/data/reported-data?lang=en&format=json"},"id":"reported-data"}],"data_types":["table"],"editorial_illustration":{"alt":"Conceptual illustration of technology, processors and connected information.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"event_id":"event-994c27a6-2bb7-55c1-8a18-41fe9614e035","event_period":"2026-11-12","event_period_basis":"event-or-reference-period","id":"uk-data-centre-siting-science-advice-grid-water-local-trust","image":null,"importance":0.6,"language":"en","modified_at":"2026-11-12T17:28:42+00:00","publication_basis":"publication-record","published_at":"2026-11-12T17:28:42+00:00","reading_minutes":4,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of technology, processors and connected information.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"slug":"uk-data-centre-siting-science-advice-grid-water-local-trust","sources":[{"checkedAt":"2026-11-12","name":"UK Government Office for Science, Data centre siting in the UK","publishedAt":"2026-11-12","url":"https://www.gov.uk/government/publications/data-centre-siting-in-the-uk/data-centre-siting-in-the-uk"}],"summary":"Meeting notes published by the Government Office for Science highlight grid access, local trust, water and carbon trade-offs in data-centre planning. The document explicitly says it is not government policy and records views from a February roundtable.","text":"Meeting notes published by the Government Office for Science highlight grid access, local trust, water and carbon trade-offs in data-centre planning. The document explicitly says it is not government policy and records views from a February roundtable.\n\nThe UK Government Office for Science published notes on November 12 from a February roundtable about where future domestic data centres should be located. The discussion, chaired by the government chief scientific adviser, concluded that there is no obvious framework for predicting the amount of onshore capacity the country will need. It recommended assessing which workloads require UK facilities and what public or private functions they serve. The publication expressly says it is not a statement of government policy; it records combined views from participants at the time.\n\nThe notes frame demand as uncertain because it depends on the pace of artificial-intelligence adoption, commercial activity, data-protection choices and the level of sovereignty government wants for sensitive information. Cloud facilities increasingly combine conventional computing with AI workloads, while businesses may not distinguish between the types of service they purchase. The experts therefore suggested planning around tasks, latency, data sensitivity and reliability rather than assuming that every sector needs a separate facility or assigning capacity from a single national forecast.\n\nLocation decisions carry different technical requirements. Smaller edge facilities can place computing closer to devices and users, while large hyperscale sites need land, substantial power and cooling. AI training can often tolerate more latency than inference services that respond to user requests. The report notes that financial trading and some public services may value very fast connections or domestic data handling, while other workloads could be delivered from overseas or centralized sites. These are examples discussed at the meeting, not a complete inventory of confirmed UK demand.\n\nGrid access emerged as a key constraint. The notes say delays in securing connections influence siting and could undermine digital-growth objectives. They also recommend a national interactive map of data centres, fibre routes, power lines and related infrastructure. Such a map could help planners and communities see where capacity is concentrated, but its usefulness would depend on current data, common definitions and the treatment of commercially sensitive information. The roundtable did not provide a quantified estimate of current UK capacity or a forecast for future gigawatts.\n\nWater needs were described as less decisive for UK siting than power availability, partly because facilities can use closed-loop cooling or ventilation in the country's relatively cool climate. That does not make water irrelevant. The report highlights a trade-off: systems that use less water can consume more electricity, and cooling design must account for regional conditions such as flood risk. The notes also discuss climate adaptation, including future temperatures and water availability, so a site that appears suitable under current conditions may face different operating constraints later.\n\nCarbon emissions and local acceptance are additional considerations. The meeting notes say data centres have limited control over the power mix available at a given location and suggest considering incentives to co-locate facilities with low-carbon generation. Participants also argued that communities need transparent planning procedures and credible evidence of local benefits. Claims about jobs or protection from electricity price increases should be testable. That recommendation matters because a national digital infrastructure case does not by itself establish that a specific community will receive lasting employment or lower bills.\n\nWaste heat could be reused for services such as laundries, food preparation or greenhouses, but the notes say UK opportunities are limited without district heating networks and when facilities are built far from suitable users. The point is practical: heat reuse depends on proximity and infrastructure, not only on the temperature of exhaust air. Likewise, the suggestion to map sites and connections is an expert recommendation rather than a funded programme. No deadline, budget or legal change is announced in this publication.\n\nThe document offers a set of planning questions rather than an approved siting policy. It brings together competing needs for digital resilience, power connections, land, emissions, cooling, security and community trust, while acknowledging that future demand is difficult to calculate. Its immediate news value is that the government science office has made these trade-offs public. The next steps depend on policymakers and local authorities deciding whether to turn the advice into formal guidance, data systems or planning rules. Those decisions are not made by the meeting notes themselves.","title":"UK science advisers say data-centre demand is hard to forecast and siting needs scrutiny","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/uk-data-centre-siting-science-advice-grid-water-local-trust"},{"api_url":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust?lang=en","language":"en","url":"https://newsverum.com/en/news/uk-data-centre-siting-science-advice-grid-water-local-trust"},{"api_url":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/uk-data-centre-siting-science-advice-grid-water-local-trust"},{"api_url":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/uk-data-centre-siting-science-advice-grid-water-local-trust"},{"api_url":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust?lang=es","language":"es","url":"https://newsverum.com/es/news/uk-data-centre-siting-science-advice-grid-water-local-trust"},{"api_url":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust?lang=de","language":"de","url":"https://newsverum.com/de/news/uk-data-centre-siting-science-advice-grid-water-local-trust"},{"api_url":"https://newsverum.com/api/v1/articles/uk-data-centre-siting-science-advice-grid-water-local-trust?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/uk-data-centre-siting-science-advice-grid-water-local-trust"}],"url":"https://newsverum.com/en/news/uk-data-centre-siting-science-advice-grid-water-local-trust"},"version":"1"}
