{"article":{"annotation":{"article_id":"tecnicas-aecon-greenlight-meta-elektrik-santrali-2026","available_at":"2026-10-11T21:37:13.941702Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"dda2068231784dacd172e8489f5b07bb286de0874ebe9938f9f55cd1e3320f5b","input_sha256":"57c92efb586063b87642a8863f40362a17c1653e1586118e4d17bc50adb9b6f1","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000256","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.tecnicasreunidas.es/tecnicas-reunidas-awarded-a-combined-cycle-power-plant-in-canada-to-power-meta/"]}],"method":"controlled-rules-v1","rule_id":"energy-broad","status":"candidate"},{"concept_id":"medtop:20000260","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: combined-cycle","source_urls":["https://www.tecnicasreunidas.es/tecnicas-reunidas-awarded-a-combined-cycle-power-plant-in-canada-to-power-meta/"]}],"method":"controlled-rules-v1","rule_id":"electricity","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["Técnicas Reunidas’ July 10 release reports Greenlight’s July 2 Alberta award. Aecon handles construction, while TR Power delivers its scope including engineering and procurement.","The 932 MW figure is planned capacity. Technical assessment should clarify partner interfaces, electrical connections and performance acceptance. Data-centre demand requires continuity and maintenance-window planning alongside selection of power-plant equipment."],"sections":[]},"corrections":[{"at":"2026-10-06T21:56:40+03:00","language":"en","text":"The missing language translations for this article have been added."},{"at":"2026-10-07T00:54:47+03:00","language":"en","text":"German and Portuguese editions and translations of the data and correction explanations have been added to this article."}],"country":null,"data":null,"data_downloads":[],"data_types":[],"editorial_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-9d043c9d-f62a-5751-be43-bbae3bf72d96","event_period":"2026-07-02","event_period_basis":"event-or-reference-period","id":"tecnicas-aecon-greenlight-meta-elektrik-santrali-2026","image":null,"importance":0.4,"language":"en","modified_at":"2026-10-07T00:54:47+03:00","publication_basis":"publication-record","published_at":"2026-10-02T21:09:51+03:00","reading_minutes":1,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta","sources":[{"checkedAt":"2026-10-02","name":"Técnicas Reunidas","publishedAt":"2026-07-10","url":"https://www.tecnicasreunidas.es/tecnicas-reunidas-awarded-a-combined-cycle-power-plant-in-canada-to-power-meta/"}],"summary":"The Greenlight project plans 932 MW of combined-cycle capacity.","text":"The Greenlight project plans 932 MW of combined-cycle capacity.\n\nTécnicas Reunidas’ July 10 release reports Greenlight’s July 2 Alberta award. Aecon handles construction, while TR Power delivers its scope including engineering and procurement.\n\nThe 932 MW figure is planned capacity. Technical assessment should clarify partner interfaces, electrical connections and performance acceptance. Data-centre demand requires continuity and maintenance-window planning alongside selection of power-plant equipment.\n\nThe missing language translations for this article have been added.\n\nGerman and Portuguese editions and translations of the data and correction explanations have been added to this article.","title":"Técnicas Reunidas and Aecon win Alberta plant work for META","topics":["epc-contractors"],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta"},{"api_url":"https://newsverum.com/api/v1/articles/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta?lang=en","language":"en","url":"https://newsverum.com/en/news/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta"},{"api_url":"https://newsverum.com/api/v1/articles/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta"},{"api_url":"https://newsverum.com/api/v1/articles/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta"},{"api_url":"https://newsverum.com/api/v1/articles/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta?lang=es","language":"es","url":"https://newsverum.com/es/news/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta"},{"api_url":"https://newsverum.com/api/v1/articles/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta?lang=de","language":"de","url":"https://newsverum.com/de/news/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta"},{"api_url":"https://newsverum.com/api/v1/articles/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta"}],"url":"https://newsverum.com/en/news/tecnicas-reunidas-and-aecon-win-alberta-plant-work-for-meta"},"version":"1"}
