{"article":{"annotation":{"article_id":"worley-ontario-pompaj-depolama-feed-2026","available_at":"2026-10-11T21:35:40.377496Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"2c31c421abea7b1ed8a99d8759837954195379707d8c65a79e5331392a4e3ad1","input_sha256":"1e0df46b6ae839afc407c51af15e14cbed7425276672ce2e7e8a18006403031c","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000256","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.worley.com/en/insights/our-news/low-carbon-energy/2026/worley-selected-for-ontario-pumped-storage-project"]}],"method":"controlled-rules-v1","rule_id":"energy-broad","status":"candidate"},{"concept_id":"medtop:20000260","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: pumped storage","source_urls":["https://www.worley.com/en/insights/our-news/low-carbon-energy/2026/worley-selected-for-ontario-pumped-storage-project"]}],"method":"controlled-rules-v1","rule_id":"electricity","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["TC Energy selected Worley for the Ontario Pumped Storage Project’s next development phase. A Worley-led team including EllisDon and AECOM will advance front-end engineering design, cost estimates, execution planning and project readiness.","The project remains in planning and development. The companies intend to prioritize local workers and suppliers where possible. The announcement concerns an engineering preparation role rather than commissioning of the storage facility or a final construction decision."],"sections":[]},"corrections":[{"at":"2026-10-06T21:55:41+03:00","language":"en","text":"The missing language translations for this article have been added."},{"at":"2026-10-07T00:51:08+03:00","language":"en","text":"German and Portuguese editions and translations of the data and correction explanations have been added to this article."}],"country":null,"data":null,"data_downloads":[],"data_types":[],"editorial_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-93ace569-a75a-57b5-b5fc-ecd2e55151d9","event_period":"2026-08-20","event_period_basis":"event-or-reference-period","id":"worley-ontario-pompaj-depolama-feed-2026","image":null,"importance":0.4,"language":"en","modified_at":"2026-10-07T00:51:08+03:00","publication_basis":"source-date","published_at":"2026-08-20","reading_minutes":1,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development","sources":[{"checkedAt":"2026-10-02","name":"Worley","publishedAt":"2026-08-20","url":"https://www.worley.com/en/insights/our-news/low-carbon-energy/2026/worley-selected-for-ontario-pumped-storage-project"}],"summary":"The team with EllisDon and AECOM will advance FEED and execution readiness.","text":"The team with EllisDon and AECOM will advance FEED and execution readiness.\n\nTC Energy selected Worley for the Ontario Pumped Storage Project’s next development phase. A Worley-led team including EllisDon and AECOM will advance front-end engineering design, cost estimates, execution planning and project readiness.\n\nThe project remains in planning and development. The companies intend to prioritize local workers and suppliers where possible. The announcement concerns an engineering preparation role rather than commissioning of the storage facility or a final construction decision.\n\nThe missing language translations for this article have been added.\n\nGerman and Portuguese editions and translations of the data and correction explanations have been added to this article.","title":"TC Energy selects Worley-led team for Ontario pumped storage development","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development"},{"api_url":"https://newsverum.com/api/v1/articles/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development?lang=en","language":"en","url":"https://newsverum.com/en/news/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development"},{"api_url":"https://newsverum.com/api/v1/articles/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development"},{"api_url":"https://newsverum.com/api/v1/articles/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development"},{"api_url":"https://newsverum.com/api/v1/articles/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development?lang=es","language":"es","url":"https://newsverum.com/es/news/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development"},{"api_url":"https://newsverum.com/api/v1/articles/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development?lang=de","language":"de","url":"https://newsverum.com/de/news/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development"},{"api_url":"https://newsverum.com/api/v1/articles/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development"}],"url":"https://newsverum.com/en/news/tc-energy-selects-worley-led-team-for-ontario-pumped-storage-development"},"version":"1"}
