{"article":{"annotation":{"article_id":"taiwan-laonong-river-subsurface-water-project-completed-2026","available_at":"2026-10-18T21:48:21.584360Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"c7baca3ff7ac924cd764c31b0a8b1e56e52a7bba637baac0e754c1f18d8873da","input_sha256":"11011677ea4df7ec89c21c94ff75bff88e39968a97f90fa4d76f4f37e96956ad","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"TW","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"]}],"geometry":null,"id":"iso3166-1:TW","kind":"country-or-area","labels":{"en":"TW"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000270","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: water project","source_urls":["https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"]}],"method":"controlled-rules-v1","rule_id":"water-supply","status":"candidate"},{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=en","category":"infrastructure","content":{"key_points":[],"paragraphs":["Taiwan’s Water Resources Agency said the Laonong River (Liling) subsurface-flow project held its completion ceremony on October 17. The project cost NT$2.354 billion and includes intake facilities designed for 100,000 tonnes a day, as well as a water-pipe bridge about 945 metres long.","The agency said the new source will contribute to stable supplies in southern Taiwan. It reported that the Gaoping River system’s subsurface-water capacity is projected to reach 900,000 tonnes a day in 2026, 550,000 tonnes above the 2017 level; these are system-wide figures, not the output of this project alone."],"sections":[]},"corrections":[],"country":"TW","data":{"blocks":[{"columns":[{"key":"value1","label":{"ar":"تكلفة المشروع","de":"Projektkosten","en":"Project cost","es":"Costo del proyecto","fr":"Coût du projet","pt":"Custo do projeto","tr":"Proje maliyeti"},"type":"number","unit":"billion TWD"},{"key":"value2","label":{"ar":"قدرة السحب المصممة","de":"Geplante Entnahmekapazität","en":"Designed intake capacity","es":"Capacidad de captación diseñada","fr":"Capacité de captage prévue","pt":"Capacidade de captação projetada","tr":"Tasarım su alma kapasitesi"},"type":"number","unit":"metric tons per day"},{"key":"value3","label":{"ar":"طول جسر أنابيب المياه","de":"Länge der Rohrbrücke","en":"Water-pipe bridge length","es":"Longitud del puente de tuberías","fr":"Longueur du pont de conduites","pt":"Comprimento da ponte de tubulações","tr":"Boru köprüsü uzunluğu"},"type":"number","unit":"metres"}],"description":{"ar":"بيانات المشروع التي أعلنتها وكالة الموارد المائية التايوانية عند اكتماله.","de":"Offizielle Projektangaben der Wasserbehörde zum Abschluss.","en":"Official project figures reported by Taiwan’s Water Resources Agency on completion.","es":"Datos publicados por la agencia taiwanesa al finalizar la obra.","fr":"Données publiées par l’agence taïwanaise à l’achèvement.","pt":"Dados oficiais divulgados pela agência na conclusão.","tr":"Tayvan Su Kaynakları Ajansının proje tamamlandığında açıkladığı resmî veriler."},"id":"taiwan-laonong-river-subsurface-water-project-completed","methodology":{"ar":"نُقلت القيم من البيان؛ السعة هي قدرة السحب المصممة، أما توقعات إمدادات النظام النهري المذكورة في الخبر فمستبعدة من جدول المشروع.","de":"Werte aus der Mitteilung; die Kapazität bezeichnet die geplante Entnahme. Flusssystem-Prognosen sind nicht Teil der Projekttabelle.","en":"Values are transcribed from the release; capacity is designed intake, while river-system supply projections described in the article are excluded from these project data.","es":"Cifras transcritas del comunicado; la capacidad es la de captación diseñada. Las proyecciones del sistema fluvial se excluyen de la tabla del proyecto.","fr":"Valeurs reprises du communiqué ; la capacité est celle prévue pour le captage. Les projections du système fluvial sont exclues du tableau du projet.","pt":"Valores transcritos do comunicado; capacidade refere-se à captação projetada. Projeções do sistema fluvial ficam fora da tabela do projeto.","tr":"Değerler resmî açıklamadan aktarılır. Kapasite tasarım su alma kapasitesidir; nehir sisteminin haberde belirtilen gelecek arz tahminleri bu proje verilerine dahil edilmez."},"rows":[{"value1":2.354,"value2":100000,"value3":945}],"sourceUrls":["https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"],"title":{"ar":"مشروع مياه نهر لاونونغ","de":"Wasserprojekt am Laonong-Fluss","en":"Laonong River water project","es":"Proyecto hídrico del río Laonong","fr":"Projet d’eau de la rivière Laonong","pt":"Projeto hídrico do rio Laonong","tr":"Laonong Nehri su projesi"},"type":"table","updatedAt":"2026-10-18T21:33:54+00:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026/data/taiwan-laonong-river-subsurface-water-project-completed?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026/data/taiwan-laonong-river-subsurface-water-project-completed?lang=en&format=json"},"id":"taiwan-laonong-river-subsurface-water-project-completed"}],"data_types":["table"],"editorial_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-a6e25ed4-0857-5260-b988-dea5d4d35a28","event_period":"2026-10-17","event_period_basis":"event-or-reference-period","id":"taiwan-laonong-river-subsurface-water-project-completed-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-18T21:48:10+00:00","publication_basis":"publication-record","published_at":"2026-10-18T21:48:10+00:00","reading_minutes":1,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"taiwan-laonong-river-subsurface-water-project-completed-2026","sources":[{"checkedAt":"2026-10-19","name":"Taiwan Ministry of Economic Affairs, Water Resources Agency","publishedAt":"2026-10-17","url":"https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"}],"summary":"The Ministry of Economic Affairs says the completed subsurface-flow scheme adds a designed 100,000 tonnes a day of water extraction and strengthens supply flexibility in the south.","text":"The Ministry of Economic Affairs says the completed subsurface-flow scheme adds a designed 100,000 tonnes a day of water extraction and strengthens supply flexibility in the south.\n\nTaiwan’s Water Resources Agency said the Laonong River (Liling) subsurface-flow project held its completion ceremony on October 17. The project cost NT$2.354 billion and includes intake facilities designed for 100,000 tonnes a day, as well as a water-pipe bridge about 945 metres long.\n\nThe agency said the new source will contribute to stable supplies in southern Taiwan. It reported that the Gaoping River system’s subsurface-water capacity is projected to reach 900,000 tonnes a day in 2026, 550,000 tonnes above the 2017 level; these are system-wide figures, not the output of this project alone.","title":"Taiwan completes NT$2.354bn Laonong River water project","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/taiwan-laonong-river-subsurface-water-project-completed-2026"}],"url":"https://newsverum.com/en/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},"version":"1"}
