{"article":{"annotation":{"article_id":"taiwan-laonong-river-subsurface-water-project-completed-2026","available_at":"2026-10-18T21:48:21.584360Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"c7baca3ff7ac924cd764c31b0a8b1e56e52a7bba637baac0e754c1f18d8873da","input_sha256":"11011677ea4df7ec89c21c94ff75bff88e39968a97f90fa4d76f4f37e96956ad","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"TW","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"]}],"geometry":null,"id":"iso3166-1:TW","kind":"country-or-area","labels":{"en":"TW"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000270","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: water project","source_urls":["https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"]}],"method":"controlled-rules-v1","rule_id":"water-supply","status":"candidate"},{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=de","category":"infrastructure","content":{"key_points":[],"paragraphs":["Die taiwanische Wasserbehörde teilte mit, dass die Abschlusszeremonie für das Grundwasserprojekt am Laonong-Fluss (Liling) am 17. Oktober stattfand. Das Projekt kostete 2,354 Milliarden NT$ und umfasst Entnahmeanlagen für 100.000 Tonnen täglich sowie eine etwa 945 Meter lange Rohrbrücke.","Die Behörde zufolge soll die neue Quelle die Versorgung im Süden Taiwans stabilisieren. Die Grundwasserkapazität des Gaoping-Flusssystems soll 2026 voraussichtlich 900.000 Tonnen pro Tag erreichen, 550.000 Tonnen mehr als 2017; das sind systemweite Werte und nicht allein die Leistung dieses Projekts."],"sections":[]},"corrections":[],"country":"TW","data":{"blocks":[{"columns":[{"key":"value1","label":{"ar":"تكلفة المشروع","de":"Projektkosten","en":"Project cost","es":"Costo del proyecto","fr":"Coût du projet","pt":"Custo do projeto","tr":"Proje maliyeti"},"type":"number","unit":"billion TWD"},{"key":"value2","label":{"ar":"قدرة السحب المصممة","de":"Geplante Entnahmekapazität","en":"Designed intake capacity","es":"Capacidad de captación diseñada","fr":"Capacité de captage prévue","pt":"Capacidade de captação projetada","tr":"Tasarım su alma kapasitesi"},"type":"number","unit":"metric tons per day"},{"key":"value3","label":{"ar":"طول جسر أنابيب المياه","de":"Länge der Rohrbrücke","en":"Water-pipe bridge length","es":"Longitud del puente de tuberías","fr":"Longueur du pont de conduites","pt":"Comprimento da ponte de tubulações","tr":"Boru köprüsü uzunluğu"},"type":"number","unit":"metres"}],"description":{"ar":"بيانات المشروع التي أعلنتها وكالة الموارد المائية التايوانية عند اكتماله.","de":"Offizielle Projektangaben der Wasserbehörde zum Abschluss.","en":"Official project figures reported by Taiwan’s Water Resources Agency on completion.","es":"Datos publicados por la agencia taiwanesa al finalizar la obra.","fr":"Données publiées par l’agence taïwanaise à l’achèvement.","pt":"Dados oficiais divulgados pela agência na conclusão.","tr":"Tayvan Su Kaynakları Ajansının proje tamamlandığında açıkladığı resmî veriler."},"id":"taiwan-laonong-river-subsurface-water-project-completed","methodology":{"ar":"نُقلت القيم من البيان؛ السعة هي قدرة السحب المصممة، أما توقعات إمدادات النظام النهري المذكورة في الخبر فمستبعدة من جدول المشروع.","de":"Werte aus der Mitteilung; die Kapazität bezeichnet die geplante Entnahme. Flusssystem-Prognosen sind nicht Teil der Projekttabelle.","en":"Values are transcribed from the release; capacity is designed intake, while river-system supply projections described in the article are excluded from these project data.","es":"Cifras transcritas del comunicado; la capacidad es la de captación diseñada. Las proyecciones del sistema fluvial se excluyen de la tabla del proyecto.","fr":"Valeurs reprises du communiqué ; la capacité est celle prévue pour le captage. Les projections du système fluvial sont exclues du tableau du projet.","pt":"Valores transcritos do comunicado; capacidade refere-se à captação projetada. Projeções do sistema fluvial ficam fora da tabela do projeto.","tr":"Değerler resmî açıklamadan aktarılır. Kapasite tasarım su alma kapasitesidir; nehir sisteminin haberde belirtilen gelecek arz tahminleri bu proje verilerine dahil edilmez."},"rows":[{"value1":2.354,"value2":100000,"value3":945}],"sourceUrls":["https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"],"title":{"ar":"مشروع مياه نهر لاونونغ","de":"Wasserprojekt am Laonong-Fluss","en":"Laonong River water project","es":"Proyecto hídrico del río Laonong","fr":"Projet d’eau de la rivière Laonong","pt":"Projeto hídrico do rio Laonong","tr":"Laonong Nehri su projesi"},"type":"table","updatedAt":"2026-10-18T21:33:54+00:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026/data/taiwan-laonong-river-subsurface-water-project-completed?lang=de&format=csv","json":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026/data/taiwan-laonong-river-subsurface-water-project-completed?lang=de&format=json"},"id":"taiwan-laonong-river-subsurface-water-project-completed"}],"data_types":["table"],"editorial_illustration":{"alt":"Konzeptionelle Darstellung von Transport-, Brücken- und Infrastrukturverbindungen.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"de","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-a6e25ed4-0857-5260-b988-dea5d4d35a28","event_period":"2026-10-17","event_period_basis":"event-or-reference-period","id":"taiwan-laonong-river-subsurface-water-project-completed-2026","image":null,"importance":0.6,"language":"de","modified_at":"2026-10-18T21:48:10+00:00","publication_basis":"publication-record","published_at":"2026-10-18T21:48:10+00:00","reading_minutes":1,"region":"world","relations":[],"section_illustration":{"alt":"Konzeptionelle Darstellung von Transport-, Brücken- und Infrastrukturverbindungen.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"de","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"taiwan-laonong-river-subsurface-water-project-completed-2026","sources":[{"checkedAt":"2026-10-19","name":"Taiwan Ministry of Economic Affairs, Water Resources Agency","publishedAt":"2026-10-17","url":"https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285"}],"summary":"Das Wirtschaftsministerium erklärt, die fertiggestellte Grundwasseranlage sei auf 100.000 Tonnen Entnahme pro Tag ausgelegt und erhöhe die Flexibilität der Versorgung im Süden.","text":"Das Wirtschaftsministerium erklärt, die fertiggestellte Grundwasseranlage sei auf 100.000 Tonnen Entnahme pro Tag ausgelegt und erhöhe die Flexibilität der Versorgung im Süden.\n\nDie taiwanische Wasserbehörde teilte mit, dass die Abschlusszeremonie für das Grundwasserprojekt am Laonong-Fluss (Liling) am 17. Oktober stattfand. Das Projekt kostete 2,354 Milliarden NT$ und umfasst Entnahmeanlagen für 100.000 Tonnen täglich sowie eine etwa 945 Meter lange Rohrbrücke.\n\nDie Behörde zufolge soll die neue Quelle die Versorgung im Süden Taiwans stabilisieren. Die Grundwasserkapazität des Gaoping-Flusssystems soll 2026 voraussichtlich 900.000 Tonnen pro Tag erreichen, 550.000 Tonnen mehr als 2017; das sind systemweite Werte und nicht allein die Leistung dieses Projekts.","title":"Taiwan schließt Wasserprojekt am Laonong-Fluss für 2,354 Milliarden NT$ ab","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},{"api_url":"https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/taiwan-laonong-river-subsurface-water-project-completed-2026"}],"url":"https://newsverum.com/de/news/taiwan-laonong-river-subsurface-water-project-completed-2026"},"version":"1"}
