{"article":{"annotation":{"article_id":"t1-energy-q3-loss-module-offtake-and-financing-2026","available_at":"2026-11-12T19:02:12.286855Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"8433f862f49a3aaaa23f8a63c07f7c6d997190cae14d893e066fc9d4b664c8da","input_sha256":"fa94815d740775a092a1ffc7b18ffd56d9e26070dd77e723aaf7903ea74fb3f7","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"US","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://ir.t1energy.com/news-releases/news-release-details/t1-energy-reports-third-quarter-2026-results"]}],"geometry":null,"id":"iso3166-1:US","kind":"country-or-area","labels":{"ar":"الولايات المتحدة الأمريكية","en":"United States of America","es":"Estados Unidos de América","fr":"États-Unis d’Amérique"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000178","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: reports Q3 loss","source_urls":["https://ir.t1energy.com/news-releases/news-release-details/t1-energy-reports-third-quarter-2026-results"]}],"method":"controlled-rules-v1","rule_id":"corporate-results","status":"candidate"},{"concept_id":"medtop:20001209","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: solar","source_urls":["https://ir.t1energy.com/news-releases/news-release-details/t1-energy-reports-third-quarter-2026-results"]}],"method":"controlled-rules-v1","rule_id":"solar-power","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026?lang=fr","category":"energy","content":{"key_points":[],"paragraphs":["T1 Energy a déclaré une perte nette de 34,7 millions de dollars américains provenant des activités poursuivies au troisième trimestre 2026, tout en augmentant la production de son usine de modules solaires G1 Dallas. L’entreprise indique avoir produit 1 056 mégawatts de modules, son deuxième rythme trimestriel le plus élevé, et constitué 326 mégawatts de stocks pour soutenir les livraisons prévues au titre d’accords d’achat récemment signés avec des clients. Les résultats ont été publiés le 12 novembre et couvrent les trois mois clos en septembre.","L’entreprise a déclaré une marge brute de 8,5 % et un EBITDA ajusté négatif de 16,4 millions de dollars pour le trimestre. Elle a indiqué que ces chiffres reflétaient des coûts plus élevés liés à l’augmentation de la production destinée à constituer des stocks ainsi que des frais commerciaux, généraux et administratifs plus élevés. T1 a déclaré une perte nette attribuable aux actionnaires ordinaires de 41,6 millions de dollars, y compris les activités abandonnées, contre une perte de 140,8 millions au troisième trimestre 2025. Ces mesures comptables ont des périmètres différents et ne doivent pas être confondues.","T1 a déclaré avoir signé près de 1,6 gigawatt de nouveaux contrats d’achat de modules solaires après une proclamation commerciale américaine concernant le polysilicium produit dans le pays. Les contrats comprennent des accords de fourniture avec le producteur indépendant d’électricité Avantus et devraient couvrir les livraisons de 2027 et 2028. L’entreprise indique que plus de 3,5 gigawatts de sa capacité de fabrication prévue pour 2027 sont sous contrat. La capacité contractualisée est un indicateur commercial important, mais les communiqués ne divulguent ni toutes les contreparties, ni les prix, ni les droits d’annulation, ni le calendrier de chaque livraison.","Sur la base de la demande contractualisée, des discussions avec les clients et de marques d’intérêt indicatives, T1 estime qu’elle pourrait vendre toute la capacité de 5 gigawatts de G1 Dallas pour 2027. L’entreprise a publié une première prévision de production de 5,3 gigawatts pour 2027 et prévoit une production de 4,0 à 4,2 gigawatts en 2026. Il s’agit de plans et de projections de la direction. La perspective de 5,3 gigawatts dépend de la poursuite de la demande, de l’exécution des contrats d’achat, des capacités de l’usine et de la disponibilité des cellules.","Une incertitude centrale concerne l’usine de cellules solaires G2 Austin en construction à Rockdale, au Texas. T1 indique négocier une solution complète de financement par emprunt avec des investisseurs institutionnels sous exclusivité, sous réserve de documents définitifs et de plusieurs conditions. Le financement pourrait également inclure des titres de participation ou des titres liés aux capitaux propres. L’entreprise précise qu’elle ne peut garantir la conclusion d’un accord à des conditions acceptables ni dans les délais prévus. T1 a donc relié le rythme des dépenses d’investissement au calendrier attendu d’une solution de financement.","L’entreprise indique que les travaux de structure principale en acier sont terminés et que les équipements restants de la ligne de production sont arrivés dans des ports américains au cours du trimestre. L’installation mécanique, électrique et de plomberie a commencé en septembre, et la préparation de la salle blanche doit suivre les travaux des corps de métier. Ces informations témoignent d’avancées de construction, mais la société n’a donné ni date de mise en service ni garantie quant au début de la production commerciale de cellules. Elle avait généré 155,3 millions de dollars de crédits d’impôt à la production au troisième trimestre et étudiait des moyens de les monétiser; le communiqué ne précise pas que ces crédits avaient déjà été convertis en trésorerie.","T1 a également révélé une lettre d’intention non contraignante visant à étudier une opération portant sur son actif Nordic Giga Arctic, qu’elle pourrait reconvertir en centre de données. L’entreprise affirme que Statnett a attribué 50 mégawatts de capacité au réseau électrique et que les autorités locales ont rezonné une partie du campus. Selon la proposition non contraignante, T1 apporterait les actifs et la capacité électrique, tandis qu’un partenaire potentiel financerait les dépenses d’investissement et rechercherait un locataire. La société a précisé qu’aucun accord définitif ni aucune transaction n’étaient assurés. Ce projet exploratoire est distinct des activités de fabrication solaire de l’entreprise au Texas.","Le tableau confirmé combine une hausse de la production de modules et une demande contractualisée, la constitution de stocks, une perte opérationnelle trimestrielle et un financement non résolu pour la prochaine étape de fabrication. Les perspectives de revenus dépendent de la conversion des contrats en livraisons, tandis que G2 Austin nécessite encore un financement et des travaux de construction. Le suivi devra porter sur les soldes de trésorerie, les documents de financement, la mise en service de l’usine, les volumes réellement expédiés et toute révision des prévisions préliminaires de production 2027. La capacité sous contrat n’équivaut ni à la production achevée ni aux revenus encaissés."],"sections":[]},"corrections":[],"country":"US","data":{"blocks":[{"description":{"ar":"أرقام مختارة منقولة من المصدر الأولي المشار إليه.","de":"Ausgewählte Zahlen aus der zitierten Primärquelle.","en":"Selected figures transcribed from the cited primary source.","es":"Cifras seleccionadas transcritas de la fuente primaria citada.","fr":"Chiffres sélectionnés transcrits de la source primaire citée.","pt":"Valores selecionados transcritos da fonte primária citada.","tr":"Atıf yapılan birincil kaynaktan aktarılan seçilmiş rakamlar."},"id":"reported-figures","items":[{"basis":"observed","label":{"ar":"صافي الخسارة من العمليات المستمرة","de":"Nettoverlust aus fortgeführten Geschäftsbereichen","en":"Net loss from continuing operations","es":"Pérdida neta de operaciones continuadas","fr":"Perte nette provenant des activités poursuivies","pt":"Prejuízo líquido das operações continuadas","tr":"Devam eden faaliyetlerden net zarar"},"measure":{"aggregation":"flow","frequency":"irregular","geography":"united-states","id":"part54-t1-energy-q3-loss-module-offtake-and-financing-2026-1","periodRole":"reference-period","unitCode":"million-usd"},"period":"2026-09-30","unit":"million USD","value":-34.7},{"basis":"observed","label":{"ar":"إنتاج وحدات الطاقة الشمسية في الربع الثالث","de":"Im dritten Quartal produzierte Solarmodule","en":"Third-quarter solar modules produced","es":"Módulos solares producidos en el tercer trimestre","fr":"Production de modules solaires au troisième trimestre","pt":"Módulos solares produzidos no terceiro trimestre","tr":"Üçüncü çeyrekte üretilen güneş modülleri"},"measure":{"aggregation":"flow","frequency":"quarterly","geography":"united-states","id":"part54-t1-energy-q3-loss-module-offtake-and-financing-2026-2","periodRole":"reference-period","unitCode":"mw"},"period":"2026-09","unit":"MW","value":1056},{"basis":"observed","label":{"ar":"المخزون المبني لتلبية التسليمات المتعاقد عليها مستقبلاً","de":"Lagerbestand für künftige vertragliche Lieferungen","en":"Inventory built for future contracted deliveries","es":"Inventario acumulado para futuras entregas contratadas","fr":"Stocks constitués pour les futures livraisons contractualisées","pt":"Inventário acumulado para futuras entregas contratadas","tr":"Sözleşmeli gelecek teslimatları için oluşturulan stok"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"united-states","id":"part54-t1-energy-q3-loss-module-offtake-and-financing-2026-3","periodRole":"reference-period","unitCode":"mw"},"period":"2026-09-30","unit":"MW","value":326},{"basis":"observed","label":{"ar":"القدرة التصنيعية لعام 2027 المتعاقد عليها","de":"Für 2027 vertraglich gebundene Produktionskapazität","en":"2027 manufacturing capacity under contract","es":"Capacidad de fabricación de 2027 bajo contrato","fr":"Capacité de fabrication 2027 sous contrat","pt":"Capacidade de fabrico de 2027 sob contrato","tr":"2027 üretim kapasitesinin sözleşmeli kısmı"},"measure":{"aggregation":"stock","frequency":"annual","geography":"united-states","id":"part54-t1-energy-q3-loss-module-offtake-and-financing-2026-4","periodRole":"reference-period","unitCode":"gw"},"period":"2027","unit":"GW","value":3.5,"valueQualifier":"lower-bound"}],"methodology":{"ar":"تحتفظ الأرقام بالفترة والسكان والنطاق والتعريفات التي يحددها المصدر. وتُصنف الأهداف المعلنة والتقديرات والتوقعات والحدود العليا بحسب أساسها. ولا تُستنتج أي قيمة مفقودة.","de":"Die Zahlen behalten den in der Quelle angegebenen Zeitraum, die Bezugsgröße, den Umfang und die Definitionen bei. Angekündigte Ziele, Schätzungen, Prognosen und Obergrenzen sind nach ihrer Grundlage gekennzeichnet. Fehlende Werte werden nicht abgeleitet.","en":"Figures retain the source's stated period, population, scope and definitions. Announced targets, estimates, forecasts and upper bounds are labeled by basis. No missing value is inferred.","es":"Las cifras conservan el periodo, la población, el alcance y las definiciones indicados por la fuente. Los objetivos anunciados, estimaciones, previsiones y límites máximos se identifican según su base. No se infiere ningún valor ausente.","fr":"Les chiffres conservent la période, la population, le périmètre et les définitions indiqués par la source. Les objectifs annoncés, estimations, prévisions et plafonds sont qualifiés selon leur base. Aucune valeur manquante n’est déduite.","pt":"Os valores mantêm o período, a população, o âmbito e as definições indicados pela fonte. Metas anunciadas, estimativas, previsões e limites superiores são identificados segundo a respetiva base. Nenhum valor em falta é inferido.","tr":"Rakamlar kaynağın belirttiği dönem, nüfus, kapsam ve tanımları korur. Açıklanan hedefler, tahminler, öngörüler ve üst sınırlar dayanaklarına göre etiketlenir. Eksik değerler çıkarımla tamamlanmaz."},"sourceUrls":["https://ir.t1energy.com/news-releases/news-release-details/t1-energy-reports-third-quarter-2026-results"],"title":{"ar":"الأرقام الرئيسية المعلنة","de":"Wichtige gemeldete Kennzahlen","en":"Key reported figures","es":"Cifras clave comunicadas","fr":"Principaux chiffres déclarés","pt":"Principais valores reportados","tr":"Bildirilen temel rakamlar"},"type":"metrics","updatedAt":"2026-11-12T18:51:25Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026/data/reported-figures?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026/data/reported-figures?lang=fr&format=json"},"id":"reported-figures"}],"data_types":["metrics"],"editorial_illustration":{"alt":"Illustration conceptuelle de la production d’électricité, du stockage et des données connectées.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-8f1499f8-ac8a-5fe3-ae52-3499065e135e","event_period":"2026-09-30","event_period_basis":"event-or-reference-period","id":"t1-energy-q3-loss-module-offtake-and-financing-2026","image":null,"importance":0.6,"language":"fr","modified_at":"2026-11-12T19:01:55+00:00","publication_basis":"publication-record","published_at":"2026-11-12T19:01:55+00:00","reading_minutes":5,"region":"world","relations":[],"section_illustration":{"alt":"Illustration conceptuelle de la production d’électricité, du stockage et des données connectées.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"t1-energy-q3-loss-module-offtake-and-financing-2026","sources":[{"checkedAt":"2026-11-12","name":"T1 Energy, third-quarter 2026 results","publishedAt":"2026-11-12","url":"https://ir.t1energy.com/news-releases/news-release-details/t1-energy-reports-third-quarter-2026-results"}],"summary":"T1 Energy a déclaré une perte de 34,7 millions de dollars provenant des activités poursuivies au troisième trimestre et produit 1,056 gigawatt de modules solaires tout en constituant des stocks. L’entreprise affirme que plus de 3,5 gigawatts de capacité pour 2027 sont sous contrat, mais le financement de sa nouvelle usine de cellules au Texas reste en négociation.","text":"T1 Energy a déclaré une perte de 34,7 millions de dollars provenant des activités poursuivies au troisième trimestre et produit 1,056 gigawatt de modules solaires tout en constituant des stocks. L’entreprise affirme que plus de 3,5 gigawatts de capacité pour 2027 sont sous contrat, mais le financement de sa nouvelle usine de cellules au Texas reste en négociation.\n\nT1 Energy a déclaré une perte nette de 34,7 millions de dollars américains provenant des activités poursuivies au troisième trimestre 2026, tout en augmentant la production de son usine de modules solaires G1 Dallas. L’entreprise indique avoir produit 1 056 mégawatts de modules, son deuxième rythme trimestriel le plus élevé, et constitué 326 mégawatts de stocks pour soutenir les livraisons prévues au titre d’accords d’achat récemment signés avec des clients. Les résultats ont été publiés le 12 novembre et couvrent les trois mois clos en septembre.\n\nL’entreprise a déclaré une marge brute de 8,5 % et un EBITDA ajusté négatif de 16,4 millions de dollars pour le trimestre. Elle a indiqué que ces chiffres reflétaient des coûts plus élevés liés à l’augmentation de la production destinée à constituer des stocks ainsi que des frais commerciaux, généraux et administratifs plus élevés. T1 a déclaré une perte nette attribuable aux actionnaires ordinaires de 41,6 millions de dollars, y compris les activités abandonnées, contre une perte de 140,8 millions au troisième trimestre 2025. Ces mesures comptables ont des périmètres différents et ne doivent pas être confondues.\n\nT1 a déclaré avoir signé près de 1,6 gigawatt de nouveaux contrats d’achat de modules solaires après une proclamation commerciale américaine concernant le polysilicium produit dans le pays. Les contrats comprennent des accords de fourniture avec le producteur indépendant d’électricité Avantus et devraient couvrir les livraisons de 2027 et 2028. L’entreprise indique que plus de 3,5 gigawatts de sa capacité de fabrication prévue pour 2027 sont sous contrat. La capacité contractualisée est un indicateur commercial important, mais les communiqués ne divulguent ni toutes les contreparties, ni les prix, ni les droits d’annulation, ni le calendrier de chaque livraison.\n\nSur la base de la demande contractualisée, des discussions avec les clients et de marques d’intérêt indicatives, T1 estime qu’elle pourrait vendre toute la capacité de 5 gigawatts de G1 Dallas pour 2027. L’entreprise a publié une première prévision de production de 5,3 gigawatts pour 2027 et prévoit une production de 4,0 à 4,2 gigawatts en 2026. Il s’agit de plans et de projections de la direction. La perspective de 5,3 gigawatts dépend de la poursuite de la demande, de l’exécution des contrats d’achat, des capacités de l’usine et de la disponibilité des cellules.\n\nUne incertitude centrale concerne l’usine de cellules solaires G2 Austin en construction à Rockdale, au Texas. T1 indique négocier une solution complète de financement par emprunt avec des investisseurs institutionnels sous exclusivité, sous réserve de documents définitifs et de plusieurs conditions. Le financement pourrait également inclure des titres de participation ou des titres liés aux capitaux propres. L’entreprise précise qu’elle ne peut garantir la conclusion d’un accord à des conditions acceptables ni dans les délais prévus. T1 a donc relié le rythme des dépenses d’investissement au calendrier attendu d’une solution de financement.\n\nL’entreprise indique que les travaux de structure principale en acier sont terminés et que les équipements restants de la ligne de production sont arrivés dans des ports américains au cours du trimestre. L’installation mécanique, électrique et de plomberie a commencé en septembre, et la préparation de la salle blanche doit suivre les travaux des corps de métier. Ces informations témoignent d’avancées de construction, mais la société n’a donné ni date de mise en service ni garantie quant au début de la production commerciale de cellules. Elle avait généré 155,3 millions de dollars de crédits d’impôt à la production au troisième trimestre et étudiait des moyens de les monétiser; le communiqué ne précise pas que ces crédits avaient déjà été convertis en trésorerie.\n\nT1 a également révélé une lettre d’intention non contraignante visant à étudier une opération portant sur son actif Nordic Giga Arctic, qu’elle pourrait reconvertir en centre de données. L’entreprise affirme que Statnett a attribué 50 mégawatts de capacité au réseau électrique et que les autorités locales ont rezonné une partie du campus. Selon la proposition non contraignante, T1 apporterait les actifs et la capacité électrique, tandis qu’un partenaire potentiel financerait les dépenses d’investissement et rechercherait un locataire. La société a précisé qu’aucun accord définitif ni aucune transaction n’étaient assurés. Ce projet exploratoire est distinct des activités de fabrication solaire de l’entreprise au Texas.\n\nLe tableau confirmé combine une hausse de la production de modules et une demande contractualisée, la constitution de stocks, une perte opérationnelle trimestrielle et un financement non résolu pour la prochaine étape de fabrication. Les perspectives de revenus dépendent de la conversion des contrats en livraisons, tandis que G2 Austin nécessite encore un financement et des travaux de construction. Le suivi devra porter sur les soldes de trésorerie, les documents de financement, la mise en service de l’usine, les volumes réellement expédiés et toute révision des prévisions préliminaires de production 2027. La capacité sous contrat n’équivaut ni à la production achevée ni aux revenus encaissés.","title":"T1 Energy annonce une perte au troisième trimestre tout en constituant des stocks de modules pour les livraisons de 2027","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/t1-energy-q3-loss-module-offtake-and-financing-2026"},{"api_url":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/t1-energy-q3-loss-module-offtake-and-financing-2026"},{"api_url":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/t1-energy-q3-loss-module-offtake-and-financing-2026"},{"api_url":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/t1-energy-q3-loss-module-offtake-and-financing-2026"},{"api_url":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/t1-energy-q3-loss-module-offtake-and-financing-2026"},{"api_url":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/t1-energy-q3-loss-module-offtake-and-financing-2026"},{"api_url":"https://newsverum.com/api/v1/articles/t1-energy-q3-loss-module-offtake-and-financing-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/t1-energy-q3-loss-module-offtake-and-financing-2026"}],"url":"https://newsverum.com/fr/news/t1-energy-q3-loss-module-offtake-and-financing-2026"},"version":"1"}
