{"article":{"annotation":{"article_id":"standard-lithium-franklin-texas-pea-filed-october-2026","available_at":"2026-10-21T00:46:55.709513Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"dd8e01f46f21c8fbaee91959ba54f181e2b121812262a069d913e07fe813d5cc","input_sha256":"0931e79ca1849f71630807f800e92479e3fddc941cf662409f44c4ed5ea4902c","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"US","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.standardlithium.com/news/press-releases/standard-lithium-files-positive-preliminary-economic-assessment-for-the-high-grade-70000-tonnes-per-year-franklin-project-in-east-texas"]}],"geometry":null,"id":"iso3166-1:US","kind":"country-or-area","labels":{"ar":"الولايات المتحدة الأمريكية","en":"United States of America","es":"Estados Unidos de América","fr":"États-Unis d’Amérique"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000349","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.standardlithium.com/news/press-releases/standard-lithium-files-positive-preliminary-economic-assessment-for-the-high-grade-70000-tonnes-per-year-franklin-project-in-east-texas"]}],"method":"controlled-rules-v1","rule_id":"business-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026?lang=en","category":"business","content":{"key_points":[],"paragraphs":["The PEA models capacity of up to 70,000 tonnes of battery-quality lithium carbonate per year and total output of 1.29 million tonnes over a 20-year model life. These are preliminary model results, not current production or a final feasibility-backed operating plan.","The report reviews lithium concentrations and project economics and recommends advancing to a pre-feasibility study. Standard Lithium reports a 55% economic interest; the 2027 target concerns completion of that study, not production."],"sections":[]},"corrections":[],"country":"US","data":{"blocks":[{"columns":[{"key":"scenario","label":{"ar":"السيناريو","de":"Szenario","en":"Scenario","es":"Escenario","fr":"Scénario","pt":"Cenário","tr":"Senaryo"},"language":"en","type":"text"},{"key":"value","label":{"ar":"أطنان كربونات الليثيوم","de":"Tonnen Lithiumcarbonat","en":"Tonnes of lithium carbonate","es":"Toneladas de carbonato de litio","fr":"Tonnes de carbonate de lithium","pt":"Toneladas de carbonato de lítio","tr":"Lityum karbonat, ton"},"type":"number","unit":"tonnes"}],"description":{"ar":"قدرة وإنتاج إجماليان نموذجيان لكربونات الليثيوم في التقييم الأولي؛ وليسا إنتاجاً محققاً.","de":"In der vorläufigen Bewertung modellierte Kapazität und Gesamtproduktion; keine tatsächlich erreichte Produktion.","en":"Preliminary modelled lithium carbonate capacity and total production; not achieved output.","es":"Capacidad y producción total modeladas en la evaluación preliminar; no es producción realizada.","fr":"Capacité et production totale modélisées dans l’évaluation préliminaire ; il ne s’agit pas d’une production réalisée.","pt":"Capacidade e produção total modeladas na avaliação preliminar; não são produção realizada.","tr":"Ön değerlendirmede modellenen lityum karbonat kapasitesi ve toplam üretim; gerçekleşmiş üretim değildir."},"id":"franklin-pea-capacity","methodology":{"ar":"الأرقام سيناريوهات التقييم الأولي وفق الشركة وعلى أساس المشروع بنسبة 100%؛ القدرة السنوية منفصلة عن الإجمالي النموذجي لعشرين عاماً.","de":"PEA-Szenarien laut Standard Lithium auf 100-Prozent-Projektbasis; Jahreskapazität und modellierte 20-Jahres-Gesamtmenge sind getrennte Größen.","en":"Figures are PEA scenarios on a 100% project basis as described by Standard Lithium; per-year capacity and 20-year model total are distinct measures.","es":"Cifras de escenarios de la EEP según Standard Lithium, sobre base de proyecto del 100%; la capacidad anual difiere del total modelado a 20 años.","fr":"Chiffres des scénarios de l’EEP communiqués par Standard Lithium, sur une base projet de 100 % ; capacité annuelle et total modélisé sur 20 ans sont distincts.","pt":"Números dos cenários da AEP segundo a Standard Lithium, na base de 100% do projeto; capacidade anual e total modelado de 20 anos são medidas distintas.","tr":"Rakamlar Standard Lithium açıklamasındaki PEA senaryolarıdır ve proje için %100 esasındadır; yıllık kapasite ile 20 yıllık model toplamı farklı ölçülerdir."},"rowTranslations":[{"scenario":{"ar":"قدرة تصل إلى 70 ألف طن سنوياً","de":"Kapazität bis zu 70.000 Tonnen jährlich","en":"Up to 70,000 tonnes per year capacity","es":"Capacidad de hasta 70.000 toneladas anuales","fr":"Capacité jusqu’à 70 000 tonnes par an","pt":"Capacidade de até 70 mil toneladas por ano","tr":"Yılda 70.000 tona kadar kapasite"}},{"scenario":{"ar":"إجمالي 1.29 مليون طن خلال 20 عاماً نموذجياً","de":"1,29 Millionen Tonnen über 20 modellierte Jahre","en":"1.29 million tonnes total over 20 modelled years","es":"1,29 millones de toneladas en 20 años modelados","fr":"1,29 million de tonnes sur 20 ans modélisés","pt":"1,29 milhão de toneladas em 20 anos modelados","tr":"20 yıllık model döneminde toplam 1,29 milyon ton"}}],"rows":[{"scenario":"Up to 70,000 tonnes per year capacity","value":70000},{"scenario":"1.29 million tonnes total over 20 modelled years","value":1290000}],"sourceUrls":["https://www.standardlithium.com/news/press-releases/standard-lithium-files-positive-preliminary-economic-assessment-for-the-high-grade-70000-tonnes-per-year-franklin-project-in-east-texas"],"title":{"ar":"نموذج إنتاج التقييم الأولي","de":"Produktionsmodell der PEA","en":"PEA production model","es":"Modelo de producción de la EEP","fr":"Modèle de production de l’EEP","pt":"Modelo de produção da AEP","tr":"PEA üretim modeli"},"type":"table","updatedAt":"2026-10-20T23:55:56Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026/data/franklin-pea-capacity?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026/data/franklin-pea-capacity?lang=en&format=json"},"id":"franklin-pea-capacity"}],"data_types":["table"],"editorial_illustration":{"alt":"Conceptual illustration of industry, engineering and logistics connections.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"event_id":"event-e70f3838-6dc8-5d5f-9035-8718bc7c6ca8","event_period":"2026-10-20","event_period_basis":"event-or-reference-period","id":"standard-lithium-franklin-texas-pea-filed-october-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-21T00:44:03+00:00","publication_basis":"publication-record","published_at":"2026-10-21T00:44:03+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Conceptual illustration of industry, engineering and logistics connections.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"slug":"standard-lithium-franklin-texas-pea-filed-october-2026","sources":[{"checkedAt":"2026-10-21","name":"Standard Lithium Ltd.","publishedAt":"2026-10-20","url":"https://www.standardlithium.com/news/press-releases/standard-lithium-files-positive-preliminary-economic-assessment-for-the-high-grade-70000-tonnes-per-year-franklin-project-in-east-texas"}],"summary":"Standard Lithium and Equinor said on 20 October that the Preliminary Economic Assessment technical report for their Franklin project in East Texas had been filed on SEDAR+. The study evaluates development and production scenarios for a lithium-brine project in the Smackover Formation.","text":"Standard Lithium and Equinor said on 20 October that the Preliminary Economic Assessment technical report for their Franklin project in East Texas had been filed on SEDAR+. The study evaluates development and production scenarios for a lithium-brine project in the Smackover Formation.\n\nThe PEA models capacity of up to 70,000 tonnes of battery-quality lithium carbonate per year and total output of 1.29 million tonnes over a 20-year model life. These are preliminary model results, not current production or a final feasibility-backed operating plan.\n\nThe report reviews lithium concentrations and project economics and recommends advancing to a pre-feasibility study. Standard Lithium reports a 55% economic interest; the 2027 target concerns completion of that study, not production.","title":"Standard Lithium files preliminary assessment for Texas Franklin project","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/standard-lithium-franklin-texas-pea-filed-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/standard-lithium-franklin-texas-pea-filed-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/standard-lithium-franklin-texas-pea-filed-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/standard-lithium-franklin-texas-pea-filed-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/standard-lithium-franklin-texas-pea-filed-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/standard-lithium-franklin-texas-pea-filed-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/standard-lithium-franklin-texas-pea-filed-october-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/standard-lithium-franklin-texas-pea-filed-october-2026"}],"url":"https://newsverum.com/en/news/standard-lithium-franklin-texas-pea-filed-october-2026"},"version":"1"}
