{"article":{"annotation":{"article_id":"sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks","available_at":"2026-10-07T03:14:18.087175Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"1870089c26ff97a55a3df7e4d4078179c48bdb237286cbf5b564f0926d04febc","input_sha256":"5b12335100dec4691a7ae25e8ad1081cb8377e289a0aee9bda86d7eb28f86ef3","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"LK","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://news.lk/current-affairs/construction-of-jet-a-1-aviation-fuel-pipeline-and-new-oil-tank-complex-at-muthurajawela-begins-under-presidents-patronage"]}],"geometry":null,"id":"iso3166-1:LK","kind":"country-or-area","labels":{"ar":"سري لانكا","en":"Sri Lanka","es":"Sri Lanka","fr":"Sri Lanka"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"d28c9c89703b56bd91fd887965d416d0115c2473d4bfbd3e558bcceafc3941dd","schema_version":1,"subjects":[{"concept_id":"medtop:20001243","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: aviation-fuel","source_urls":["https://news.lk/current-affairs/construction-of-jet-a-1-aviation-fuel-pipeline-and-new-oil-tank-complex-at-muthurajawela-begins-under-presidents-patronage"]}],"method":"controlled-rules-v1","rule_id":"oil-gas","status":"candidate"},{"concept_id":"medtop:20000338","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: Airport","source_urls":["https://news.lk/current-affairs/construction-of-jet-a-1-aviation-fuel-pipeline-and-new-oil-tank-complex-at-muthurajawela-begins-under-presidents-patronage"]}],"method":"controlled-rules-v1","rule_id":"air-transport","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks?lang=pt","category":"energy","content":{"key_points":[],"paragraphs":["Segundo o portal do governo, o projeto principal iniciado em 2 de outubro inclui dois tanques de 30.000 metros cúbicos, dois de 15.000 metros cúbicos e um de 2.000 metros cúbicos, totalizando 92.000 metros cúbicos. O duto subterrâneo de 10 polegadas ligará o terminal de Muthurajawela ao aeroporto de Katunayake por 21 quilômetros, com conclusão prevista em 30 meses.","Separadamente, a CPSTL constrói três tanques adicionais no mesmo terminal: dois de 15.000 metros cúbicos e um de 10.000, que acrescentarão 40.000 metros cúbicos de armazenamento. O prazo do contrato é de 18 meses e a conclusão está prevista para abril de 2028. O comunicado descreve os dois pacotes de obras separadamente, portanto suas capacidades não devem ser confundidas."],"sections":[]},"corrections":[{"at":"2026-10-07T00:53:25+03:00","language":"pt","text":"Este artigo recebeu edições em alemão e português, além das traduções das explicações dos dados e das correções nesses idiomas."},{"at":"2026-10-07T00:57:28+03:00","language":"pt","text":"As edições linguísticas do artigo e as explicações dos dados foram revisadas, e os problemas de tradução e rótulos identificados foram corrigidos. As fontes, os dados numéricos e a data da primeira publicação foram preservados."},{"at":"2026-10-07T05:58:48+03:00","language":"pt","text":"Classificação dos dados corrigida: os identificadores e tipos de medida seguem agora as regras do conjunto de dados. Nenhum número, unidade ou data foi alterado."}],"country":"LK","data":{"blocks":[{"description":{"ar":"أبعاد خط وقود الطيران ومشاريع التخزين المعلنة.","de":"Abmessungen der angekündigten Bauprojekte für Flugkraftstoffpipeline und Lagerung.","en":"Dimensions of the announced aviation-fuel pipeline and storage construction projects.","es":"Dimensiones de los proyectos anunciados de oleoducto y almacenamiento de combustible de aviación.","fr":"Dimensions des projets annoncés de pipeline et de stockage de carburant aéronautique.","pt":"Dimensões dos projetos anunciados de dutos e armazenamento de combustível de aviação.","tr":"Hükümetin açıkladığı havacılık yakıtı boru hattı ve depolama inşaatlarının ölçüleri."},"id":"sri-lanka-jet-a1-pipeline-and-storage-projects","items":[{"basis":"observed","label":{"ar":"طول خط وقود Jet A-1","de":"Länge der Jet-A-1-Leitung","en":"Jet A-1 pipeline length","es":"Longitud del oleoducto Jet A-1","fr":"Longueur du pipeline Jet A-1","pt":"Extensão do duto de Jet A-1","tr":"Jet A-1 boru hattı uzunluğu"},"measure":{"aggregation":"flow","frequency":"irregular","geography":"sri-lanka","id":"sri-lanka-jet-a1-pipeline-length","periodRole":"announcement-date","unitCode":"kilometre"},"period":"2026-10-02","unit":"km","value":21},{"basis":"observed","label":{"ar":"الخزانات الجديدة في مشروع Jet A-1 الرئيسي","de":"Neue Tanks im Hauptprojekt für Jet A-1","en":"New tanks in the main Jet A-1 project","es":"Nuevos tanques del proyecto principal Jet A-1","fr":"Nouveaux réservoirs du projet Jet A-1 principal","pt":"Novos tanques do projeto principal de Jet A-1","tr":"Ana Jet A-1 projesindeki yeni tanklar"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"sri-lanka","id":"sri-lanka-jet-a1-project-new-tanks","periodRole":"announcement-date","unitCode":"count"},"period":"2026-10-02","unit":"count","value":5},{"basis":"observed","label":{"ar":"الخزانات الجديدة في مشروع CPSTL المنفصل","de":"Neue Tanks im getrennten CPSTL-Projekt","en":"New tanks in the separate CPSTL project","es":"Nuevos tanques del proyecto separado de CPSTL","fr":"Nouveaux réservoirs du projet distinct de CPSTL","pt":"Novos tanques do projeto separado da CPSTL","tr":"Ayrı CPSTL projesindeki yeni tanklar"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"sri-lanka","id":"sri-lanka-cpstl-project-new-tanks","periodRole":"announcement-date","unitCode":"count"},"period":"2026-10-02","unit":"count","value":3}],"methodology":{"ar":"السعة بوحدة متر مكعب وطول خط الأنابيب بالكيلومترات. مشروع الخزانات الخمسة بسعة 92 ألف متر مكعب ومشروع CPSTL المنفصل بثلاثة خزانات وسعة 40 ألف متر مكعب مشروعان مختلفان ولم يُجمعا في إجمالي واحد.","de":"Das Lagervolumen wird in m³, die Pipeline-Länge in Kilometern angegeben. Das Paket mit fünf Tanks und 92.000 m³ sowie das separate CPSTL-Paket mit drei Tanks und 40.000 m³ sind unterschiedliche Projekte und werden nicht zu einer Gesamtkapazität zusammengeführt.","en":"Storage volume is reported in m³ and pipeline length in kilometres. The five-tank 92,000 m³ package and the separate CPSTL three-tank/40,000 m³ package are distinct projects and are not merged into one capacity total.","es":"El volumen se expresa en m³ y la longitud del oleoducto en kilómetros. El paquete de cinco tanques de 92.000 m³ y el paquete separado de CPSTL (tres tanques, 40.000 m³) son proyectos distintos y no se suman.","fr":"Le volume est exprimé en m³ et la longueur du pipeline en kilomètres. Le lot de cinq réservoirs de 92 000 m³ et le lot distinct de CPSTL (trois réservoirs, 40 000 m³) sont des projets séparés et ne sont pas additionnés.","pt":"O volume de armazenamento é informado em m³ e a extensão do duto em quilômetros. O pacote de cinco tanques e 92.000 m³ e o projeto separado da CPSTL, com três tanques e 40.000 m³, são projetos distintos e não são somados em uma única capacidade total.","tr":"Hacim birimi m³; boru hattı uzunluğu kilometredir. Beş tanklı 92.000 m³ paketi ile ayrı CPSTL üç tank/40.000 m³ paketi farklı projelerdir; kapasite toplamı olarak birleştirilmemiştir."},"sourceUrls":["https://news.lk/current-affairs/construction-of-jet-a-1-aviation-fuel-pipeline-and-new-oil-tank-complex-at-muthurajawela-begins-under-presidents-patronage"],"title":{"ar":"خط وقود الطيران ومشاريع التخزين المنفصلة","de":"Flugtreibstoffleitung und getrennte Speicherprojekte","en":"Aviation-fuel pipeline and separate storage projects","es":"Oleoducto de combustible de aviación y proyectos de almacenamiento separados","fr":"Pipeline de carburant aéronautique et projets de stockage distincts","pt":"Duto de combustível de aviação e projetos separados de armazenamento","tr":"Havacılık yakıtı boru hattı ve ayrı depolama projeleri"},"type":"metrics","updatedAt":"2026-10-07T00:57:28+03:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks/data/sri-lanka-jet-a1-pipeline-and-storage-projects?lang=pt&format=csv","json":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks/data/sri-lanka-jet-a1-pipeline-and-storage-projects?lang=pt&format=json"},"id":"sri-lanka-jet-a1-pipeline-and-storage-projects"}],"data_types":["metrics"],"editorial_illustration":{"alt":"Ilustração conceitual de geração de eletricidade, armazenamento e dados conectados.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"pt","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-930b2ced-b4f9-503b-97b2-73a2ff225605","event_period":"2026-10-02","event_period_basis":"event-or-reference-period","id":"sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks","image":null,"importance":0.6,"language":"pt","modified_at":"2026-10-07T05:58:48+03:00","publication_basis":"publication-record","published_at":"2026-10-04T14:04:24+00:00","reading_minutes":2,"region":"world","section_illustration":{"alt":"Ilustração conceitual de geração de eletricidade, armazenamento e dados conectados.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"pt","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks","sources":[{"checkedAt":"2026-10-04","name":"The Official Government News Portal of Sri Lanka","publishedAt":"2026-10-03","url":"https://news.lk/current-affairs/construction-of-jet-a-1-aviation-fuel-pipeline-and-new-oil-tank-complex-at-muthurajawela-begins-under-presidents-patronage"}],"summary":"O Sri Lanka iniciou a construção de um duto subterrâneo de Jet A-1 de 21 quilômetros entre Muthurajawela e o Aeroporto Internacional Bandaranaike e de cinco tanques com capacidade combinada de 92.000 metros cúbicos. Um projeto separado da CPSTL acrescentará três tanques e 40.000 metros cúbicos em Muthurajawela.","text":"O Sri Lanka iniciou a construção de um duto subterrâneo de Jet A-1 de 21 quilômetros entre Muthurajawela e o Aeroporto Internacional Bandaranaike e de cinco tanques com capacidade combinada de 92.000 metros cúbicos. Um projeto separado da CPSTL acrescentará três tanques e 40.000 metros cúbicos em Muthurajawela.\n\nSegundo o portal do governo, o projeto principal iniciado em 2 de outubro inclui dois tanques de 30.000 metros cúbicos, dois de 15.000 metros cúbicos e um de 2.000 metros cúbicos, totalizando 92.000 metros cúbicos. O duto subterrâneo de 10 polegadas ligará o terminal de Muthurajawela ao aeroporto de Katunayake por 21 quilômetros, com conclusão prevista em 30 meses.\n\nSeparadamente, a CPSTL constrói três tanques adicionais no mesmo terminal: dois de 15.000 metros cúbicos e um de 10.000, que acrescentarão 40.000 metros cúbicos de armazenamento. O prazo do contrato é de 18 meses e a conclusão está prevista para abril de 2028. O comunicado descreve os dois pacotes de obras separadamente, portanto suas capacidades não devem ser confundidas.\n\nEste artigo recebeu edições em alemão e português, além das traduções das explicações dos dados e das correções nesses idiomas.\n\nAs edições linguísticas do artigo e as explicações dos dados foram revisadas, e os problemas de tradução e rótulos identificados foram corrigidos. As fontes, os dados numéricos e a data da primeira publicação foram preservados.\n\nClassificação dos dados corrigida: os identificadores e tipos de medida seguem agora as regras do conjunto de dados. Nenhum número, unidade ou data foi alterado.","title":"Sri Lanka inicia duto de 21 km para combustível de aviação e novos tanques","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks"},{"api_url":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks?lang=en","language":"en","url":"https://newsverum.com/en/news/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks"},{"api_url":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks"},{"api_url":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks"},{"api_url":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks?lang=es","language":"es","url":"https://newsverum.com/es/news/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks"},{"api_url":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks?lang=de","language":"de","url":"https://newsverum.com/de/news/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks"},{"api_url":"https://newsverum.com/api/v1/articles/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks"}],"url":"https://newsverum.com/pt/news/sri-lanka-starts-jet-a1-pipeline-and-new-storage-tanks"},"version":"1"}
