{"article":{"annotation":{"article_id":"south-australia-icac-torrens-darlington-project-evaluation-2026","available_at":"2026-11-12T17:29:12.883688Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"ed0e84b483f898eabce4593ae23e72375494f551f273bbdf97a00f2e040aac59","input_sha256":"cf32ea8c46c43fd28a80342b6f9d2c9c9d0c0acac986a716d21b7db68cc12b03","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"AU","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"]}],"geometry":null,"id":"iso3166-1:AU","kind":"country-or-area","labels":{"ar":"أستراليا","en":"Australia","es":"Australia","fr":"Australie"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=pt","category":"infrastructure","content":{"key_points":[],"paragraphs":["A Comissão Independente contra a Corrupção da Austrália Meridional abriu uma avaliação do Departamento de Infraestruturas e Transportes, centrada nas aquisições e na gestão contratual do projeto River Torrens to Darlington. O órgão de fiscalização publicou os termos de referência em 11 de novembro e convidou funcionários públicos, empreiteiros, subempreiteiros e membros da comunidade a apresentar contributos. Indicou que o objetivo é avaliar como as políticas e os controlos existentes gerem os riscos de corrupção e impedem a contratação de partes inadequadas.","A avaliação examinará a relação entre o departamento e a aliança T2D, o modelo de execução do projeto identificado nos termos de referência da comissão. Analisará as funções e responsabilidades atribuídas a cada parte, os critérios utilizados para avaliar a elegibilidade e a adequação em concursos ou na seleção de contratos e a forma como essas decisões são revistas. A comissão também pretende analisar a supervisão contínua de empreiteiros e subempreiteiros, incluindo se as alterações na propriedade ou na estrutura empresarial são acompanhadas durante a vigência de um contrato.","Este foco reflete um desafio central dos grandes programas de infraestruturas: a seleção na fase do concurso é apenas um ponto de controlo. A propriedade, a liderança ou a situação financeira de um fornecedor podem mudar depois da seleção, e um empreiteiro principal pode depender de subempreiteiros cujo trabalho é menos visível para a autoridade pública. A comissão afirma que avaliará a monitorização da segurança e da integridade, os mecanismos de comunicação, escalonamento e resposta, bem como os recursos possíveis ao abrigo das condições contratuais. Não anunciou qualquer conclusão de que esses controlos tenham falhado.","A ICAC espera recorrer a contributos públicos, entrevistas e análises de políticas, procedimentos e documentos do projeto. Também pretende examinar uma amostra representativa de contratos, uma vez que o projeto inclui um grande volume de acordos contratuais. A comissão afirma que a metodologia da análise ainda será finalizada. Essa ressalva significa que os termos publicados descrevem as questões e as fontes de prova previstas, enquanto a amostra exata, os critérios de teste e os métodos analíticos continuam por definir.","A avaliação não é apresentada como uma investigação que tenha comprovado corrupção. No comunicado, a comissão afirmou que, ao abrigo do seu enquadramento legal, não pode receber denúncias de corrupção, má administração ou má conduta na administração pública. Essas denúncias devem ser apresentadas ao Office for Public Integrity. A distinção é importante: uma análise institucional da gestão de riscos pode identificar fragilidades ou recomendar controlos mais fortes sem concluir que um empreiteiro, funcionário público ou contrato específico envolveu conduta imprópria.","O prazo para apresentação de contributos termina em 15 de janeiro de 2027. A ICAC afirmou que prevê publicar um relatório no próximo ano, embora esse seja um calendário esperado e não um compromisso fixo de publicação. O comissário pode alterar os termos de referência à luz das informações recebidas. As pessoas com experiência relevante são convidadas a contactar o processo de avaliação, enquanto alegações sobre acordos contratuais específicos devem ser encaminhadas para o canal separado de comunicação de questões de integridade.","O caso pode ser relevante para outros grandes projetos porque a integridade dos fornecedores e a transparência da propriedade são questões recorrentes nas aquisições públicas. Os termos da comissão preveem especificamente considerar a aplicabilidade mais ampla de eventuais conclusões. Isso não significa que os acordos T2D representem todos os contratos de infraestruturas nem que esteja demonstrado um problema em todo o setor. Um relatório sólido teria de indicar quais controlos foram analisados, o que a amostra pode ou não sustentar e se as recomendações estão ligadas a provas documentadas.","Para os contribuintes e participantes do projeto, o desenvolvimento próximo é um processo de escrutínio com âmbito definido, um período aberto para contributos e um relatório previsto para 2027. Os próximos marcos relevantes são a recolha de provas, a finalização da metodologia e a publicação das conclusões. Até essas etapas estarem concluídas, a descrição adequada é que o órgão de fiscalização da Austrália Meridional está a avaliar os controlos de risco de aquisição e gestão contratual num grande projeto rodoviário, e não que descobriu corrupção ou tomou uma decisão contra qualquer parte."],"sections":[]},"corrections":[],"country":"AU","data":{"blocks":[{"columns":[{"key":"measure","label":{"ar":"المقياس","de":"Kennzahl","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Ölçüt"},"language":"en","type":"text"},{"key":"detail","label":{"ar":"القيمة أو النطاق المعلن","de":"Gemeldeter Wert oder Umfang","en":"Reported value or scope","es":"Valor o alcance comunicado","fr":"Valeur ou périmètre communiqué","pt":"Valor ou âmbito comunicado","tr":"Bildirilen değer veya kapsam"},"language":"en","type":"text"}],"description":{"ar":"الأرقام والنطاق المنقولان من بيان المصدر الأولي.","de":"Zahlen und Umfang aus der Mitteilung der Primärquelle.","en":"Figures and scope reproduced from the primary source release.","es":"Cifras y alcance reproducidos del comunicado de la fuente primaria.","fr":"Chiffres et périmètre repris du communiqué de la source primaire.","pt":"Números e âmbito reproduzidos do comunicado da fonte primária.","tr":"Birincil kaynak açıklamasındaki rakamlar ve kapsam."},"id":"reported-data","methodology":{"ar":"نُقلت القيم من المصدر الأولي المشار إليه. وتظل الفترات والتقديرات والتعريفات والتحفظات مطابقة للمصدر؛ ولا يضيف هذا الجدول توقعاً أو تقديراً خارجياً.","de":"Die Werte wurden aus der zitierten Primärquelle übernommen. Zeiträume, Schätzungen, Definitionen und Vorbehalte entsprechen dieser Quelle; die Tabelle fügt keine Prognose oder externe Schätzung hinzu.","en":"Values are transcribed from the cited primary source. Periods, estimates, definitions and caveats follow that source; this table adds no forecast or external estimate.","es":"Los valores se transcriben de la fuente primaria citada. Los periodos, estimaciones, definiciones y salvedades siguen esa fuente; esta tabla no añade previsiones ni estimaciones externas.","fr":"Les valeurs sont transcrites de la source primaire citée. Les périodes, estimations, définitions et réserves suivent cette source; le tableau n’ajoute aucune prévision ni estimation externe.","pt":"Os valores foram transcritos da fonte primária citada. Os períodos, as estimativas, as definições e as ressalvas seguem essa fonte; esta tabela não acrescenta previsões nem estimativas externas.","tr":"Değerler atıf yapılan birincil kaynaktan aktarılmıştır. Dönemler, tahminler, tanımlar ve çekinceler kaynaktaki biçimiyle korunmuştur; bu tablo yeni bir tahmin veya dışarıdan bir hesap eklemez."},"rowTranslations":[{"detail":{"ar":"ممارسات المشتريات وإدارة العقود في مشروع طريق ريفر تورينز إلى دارلينغتون.","de":"Beschaffungs- und Vertragsmanagementpraktiken für das River-Torrens-to-Darlington-Projekt.","en":"Procurement and contract management practices for the River Torrens to Darlington Project.","es":"Prácticas de contratación y gestión contractual del proyecto River Torrens to Darlington.","fr":"Pratiques d’achat et de gestion des contrats du projet River Torrens to Darlington.","pt":"Práticas de aquisição e gestão de contratos do projeto River Torrens to Darlington.","tr":"River Torrens ile Darlington Projesi için ihale ve sözleşme yönetimi uygulamaları."},"measure":{"ar":"نطاق المراجعة","de":"Prüfungsumfang","en":"Review scope","es":"Alcance de la revisión","fr":"Périmètre de l’examen","pt":"Âmbito da análise","tr":"İncelemenin kapsamı"}},{"detail":{"ar":"فحص المناقصات، والإشراف على المقاولين والمتعاقدين من الباطن، وتغييرات الملكية، والرصد، والتصعيد، وسبل الرجوع التعاقدية.","de":"Ausschreibungsprüfung, Aufsicht über Auftragnehmer und Subunternehmer, Eigentümerwechsel, Überwachung, Eskalation und vertragliche Rechtsmittel.","en":"Tender screening, contractor and subcontractor oversight, ownership changes, monitoring, escalation and contractual recourse.","es":"Selección en licitaciones, supervisión de contratistas y subcontratistas, cambios de propiedad, seguimiento, escalamiento y recursos contractuales.","fr":"Sélection des appels d’offres, supervision des entrepreneurs et sous-traitants, changements de propriété, suivi, escalade et recours contractuels.","pt":"Triagem de concursos, supervisão de empreiteiros e subempreiteiros, alterações de propriedade, monitorização, escalonamento e recursos contratuais.","tr":"İhale ön elemesi, yüklenici ve alt yüklenici gözetimi, mülkiyet değişiklikleri, izleme, üst makamlara taşıma ve sözleşmesel başvuru yolları."},"measure":{"ar":"الضوابط قيد المراجعة","de":"Geprüfte Kontrollen","en":"Controls under review","es":"Controles objeto de revisión","fr":"Contrôles examinés","pt":"Controlos em análise","tr":"İncelenen kontroller"}},{"detail":{"ar":"15 يناير 2027.","de":"15. Januar 2027.","en":"15 January 2027.","es":"15 de enero de 2027.","fr":"15 janvier 2027.","pt":"15 de janeiro de 2027.","tr":"15 Ocak 2027."},"measure":{"ar":"موعد إغلاق الملاحظات","de":"Frist für Eingaben","en":"Submissions close","es":"Cierre del plazo de aportaciones","fr":"Clôture des contributions","pt":"Encerramento das contribuições","tr":"Başvuru son tarihi"}},{"detail":{"ar":"بدأ التقييم وجمع الأدلة؛ ولم يُعلن استنتاج بوقوع فساد.","de":"Bewertung und Beweiserhebung haben begonnen; eine Korruptionsfeststellung wurde nicht bekannt gegeben.","en":"Evaluation and evidence gathering have begun; no finding of corruption was announced.","es":"Han comenzado la evaluación y la recopilación de pruebas; no se anunció ninguna conclusión de corrupción.","fr":"L’évaluation et la collecte de preuves ont commencé; aucune conclusion de corruption n’a été annoncée.","pt":"A avaliação e a recolha de provas começaram; não foi anunciada qualquer conclusão de corrupção.","tr":"Değerlendirme ve kanıt toplama başladı; yolsuzluk tespiti açıklanmadı."},"measure":{"ar":"الحالة","de":"Status","en":"Status","es":"Estado","fr":"Statut","pt":"Estado","tr":"Durum"}}],"rows":[{"detail":"Procurement and contract management practices for the River Torrens to Darlington Project.","measure":"Review scope"},{"detail":"Tender screening, contractor and subcontractor oversight, ownership changes, monitoring, escalation and contractual recourse.","measure":"Controls under review"},{"detail":"15 January 2027.","measure":"Submissions close"},{"detail":"Evaluation and evidence gathering have begun; no finding of corruption was announced.","measure":"Status"}],"sourceUrls":["https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"],"title":{"ar":"نتائج مختارة من المصدر الأولي","de":"Ausgewählte Erkenntnisse aus der Primärquelle","en":"Selected findings from the primary source","es":"Hallazgos seleccionados de la fuente primaria","fr":"Constats sélectionnés de la source primaire","pt":"Constatações selecionadas da fonte primária","tr":"Birincil kaynaktaki seçilmiş bulgular"},"type":"table","updatedAt":"2026-11-12T16:15:00Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026/data/reported-data?lang=pt&format=csv","json":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026/data/reported-data?lang=pt&format=json"},"id":"reported-data"}],"data_types":["table"],"editorial_illustration":{"alt":"Ilustração conceitual de transportes, pontes e conexões de infraestrutura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"pt","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-efe86125-3d61-5828-9ba8-a558be08ca5a","event_period":"2026-11-11","event_period_basis":"event-or-reference-period","id":"south-australia-icac-torrens-darlington-project-evaluation-2026","image":null,"importance":0.6,"language":"pt","modified_at":"2026-11-12T17:28:41+00:00","publication_basis":"publication-record","published_at":"2026-11-12T17:28:41+00:00","reading_minutes":4,"region":"world","relations":[],"section_illustration":{"alt":"Ilustração conceitual de transportes, pontes e conexões de infraestrutura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"pt","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"south-australia-icac-torrens-darlington-project-evaluation-2026","sources":[{"checkedAt":"2026-11-12","name":"Independent Commission Against Corruption South Australia","publishedAt":"2026-11-11","url":"https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"}],"summary":"A Comissão Independente contra a Corrupção da Austrália Meridional iniciou uma avaliação das aquisições e da gestão contratual do projeto River Torrens to Darlington. A análise examinará a seleção e a supervisão contínua de empreiteiros e subempreiteiros, mas o anúncio não constitui uma conclusão de corrupção ou má conduta.","text":"A Comissão Independente contra a Corrupção da Austrália Meridional iniciou uma avaliação das aquisições e da gestão contratual do projeto River Torrens to Darlington. A análise examinará a seleção e a supervisão contínua de empreiteiros e subempreiteiros, mas o anúncio não constitui uma conclusão de corrupção ou má conduta.\n\nA Comissão Independente contra a Corrupção da Austrália Meridional abriu uma avaliação do Departamento de Infraestruturas e Transportes, centrada nas aquisições e na gestão contratual do projeto River Torrens to Darlington. O órgão de fiscalização publicou os termos de referência em 11 de novembro e convidou funcionários públicos, empreiteiros, subempreiteiros e membros da comunidade a apresentar contributos. Indicou que o objetivo é avaliar como as políticas e os controlos existentes gerem os riscos de corrupção e impedem a contratação de partes inadequadas.\n\nA avaliação examinará a relação entre o departamento e a aliança T2D, o modelo de execução do projeto identificado nos termos de referência da comissão. Analisará as funções e responsabilidades atribuídas a cada parte, os critérios utilizados para avaliar a elegibilidade e a adequação em concursos ou na seleção de contratos e a forma como essas decisões são revistas. A comissão também pretende analisar a supervisão contínua de empreiteiros e subempreiteiros, incluindo se as alterações na propriedade ou na estrutura empresarial são acompanhadas durante a vigência de um contrato.\n\nEste foco reflete um desafio central dos grandes programas de infraestruturas: a seleção na fase do concurso é apenas um ponto de controlo. A propriedade, a liderança ou a situação financeira de um fornecedor podem mudar depois da seleção, e um empreiteiro principal pode depender de subempreiteiros cujo trabalho é menos visível para a autoridade pública. A comissão afirma que avaliará a monitorização da segurança e da integridade, os mecanismos de comunicação, escalonamento e resposta, bem como os recursos possíveis ao abrigo das condições contratuais. Não anunciou qualquer conclusão de que esses controlos tenham falhado.\n\nA ICAC espera recorrer a contributos públicos, entrevistas e análises de políticas, procedimentos e documentos do projeto. Também pretende examinar uma amostra representativa de contratos, uma vez que o projeto inclui um grande volume de acordos contratuais. A comissão afirma que a metodologia da análise ainda será finalizada. Essa ressalva significa que os termos publicados descrevem as questões e as fontes de prova previstas, enquanto a amostra exata, os critérios de teste e os métodos analíticos continuam por definir.\n\nA avaliação não é apresentada como uma investigação que tenha comprovado corrupção. No comunicado, a comissão afirmou que, ao abrigo do seu enquadramento legal, não pode receber denúncias de corrupção, má administração ou má conduta na administração pública. Essas denúncias devem ser apresentadas ao Office for Public Integrity. A distinção é importante: uma análise institucional da gestão de riscos pode identificar fragilidades ou recomendar controlos mais fortes sem concluir que um empreiteiro, funcionário público ou contrato específico envolveu conduta imprópria.\n\nO prazo para apresentação de contributos termina em 15 de janeiro de 2027. A ICAC afirmou que prevê publicar um relatório no próximo ano, embora esse seja um calendário esperado e não um compromisso fixo de publicação. O comissário pode alterar os termos de referência à luz das informações recebidas. As pessoas com experiência relevante são convidadas a contactar o processo de avaliação, enquanto alegações sobre acordos contratuais específicos devem ser encaminhadas para o canal separado de comunicação de questões de integridade.\n\nO caso pode ser relevante para outros grandes projetos porque a integridade dos fornecedores e a transparência da propriedade são questões recorrentes nas aquisições públicas. Os termos da comissão preveem especificamente considerar a aplicabilidade mais ampla de eventuais conclusões. Isso não significa que os acordos T2D representem todos os contratos de infraestruturas nem que esteja demonstrado um problema em todo o setor. Um relatório sólido teria de indicar quais controlos foram analisados, o que a amostra pode ou não sustentar e se as recomendações estão ligadas a provas documentadas.\n\nPara os contribuintes e participantes do projeto, o desenvolvimento próximo é um processo de escrutínio com âmbito definido, um período aberto para contributos e um relatório previsto para 2027. Os próximos marcos relevantes são a recolha de provas, a finalização da metodologia e a publicação das conclusões. Até essas etapas estarem concluídas, a descrição adequada é que o órgão de fiscalização da Austrália Meridional está a avaliar os controlos de risco de aquisição e gestão contratual num grande projeto rodoviário, e não que descobriu corrupção ou tomou uma decisão contra qualquer parte.","title":"Órgão de fiscalização da Austrália Meridional abre análise de contratação de grande projeto rodoviário","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/south-australia-icac-torrens-darlington-project-evaluation-2026"}],"url":"https://newsverum.com/pt/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},"version":"1"}
