{"article":{"annotation":{"article_id":"south-australia-icac-torrens-darlington-project-evaluation-2026","available_at":"2026-11-12T17:29:12.883688Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"ed0e84b483f898eabce4593ae23e72375494f551f273bbdf97a00f2e040aac59","input_sha256":"cf32ea8c46c43fd28a80342b6f9d2c9c9d0c0acac986a716d21b7db68cc12b03","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"AU","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"]}],"geometry":null,"id":"iso3166-1:AU","kind":"country-or-area","labels":{"ar":"أستراليا","en":"Australia","es":"Australia","fr":"Australie"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=fr","category":"infrastructure","content":{"key_points":[],"paragraphs":["La commission indépendante contre la corruption d’Australie-Méridionale a ouvert une évaluation du ministère des Infrastructures et des Transports axée sur les achats et la gestion des contrats du projet River Torrens to Darlington. L’autorité de contrôle a publié le 11 novembre le mandat de l’évaluation et invité les agents publics, les entrepreneurs, les sous-traitants et les membres de la communauté à présenter des observations. Elle a indiqué que l’objectif était d’évaluer comment les politiques et contrôles existants gèrent les risques de corruption et empêchent de faire appel à des parties inappropriées.","L’évaluation examinera la relation entre le ministère et la T2D Alliance, le dispositif de réalisation du projet nommé dans le mandat de la commission. Elle étudiera les rôles et responsabilités attribués à chacun, les critères utilisés pour évaluer l’admissibilité et l’aptitude aux appels d’offres ou à la sélection des contrats, ainsi que la manière dont ces décisions sont examinées. La commission prévoit aussi d’étudier le suivi continu des entrepreneurs et sous-traitants, notamment pour déterminer si les changements de propriété ou de structure de l’entreprise sont suivis pendant la durée d’un contrat.","Cette priorité reflète un défi central des grands programmes d’infrastructure : le contrôle au stade de l’appel d’offres n’est qu’un point de contrôle parmi d’autres. La propriété, la direction ou la situation financière d’un fournisseur peut changer après sa sélection, et un entrepreneur principal peut s’appuyer sur des sous-traitants dont le travail est moins visible pour l’autorité publique. La commission indique qu’elle évaluera la surveillance de la sécurité et de l’intégrité, les mécanismes de signalement, d’escalade et de réponse, ainsi que les recours possibles au titre des contrats. Elle n’a annoncé aucune conclusion selon laquelle ces contrôles auraient échoué.","La commission prévoit d’utiliser les contributions du public, des entretiens et l’examen des politiques, procédures et documents du projet. Elle entend également examiner un échantillon représentatif de contrats, car le projet comporte un grand nombre de dispositifs contractuels. La commission indique que la méthode d’évaluation n’est pas encore arrêtée. Le mandat publié définit donc les questions et les sources de preuves envisagées, tandis que l’échantillon précis, les critères de contrôle et les méthodes d’analyse restent à déterminer.","L’évaluation n’est pas présentée comme une enquête ayant établi l’existence de corruption. Dans son communiqué, la commission a déclaré que son cadre légal ne lui permet pas de recevoir des signalements de corruption, de mauvaise administration ou de faute dans l’administration publique. Ces signalements doivent être adressés à l’Office for Public Integrity. Cette distinction est importante : un examen institutionnel de la gestion des risques peut relever des faiblesses ou recommander des contrôles plus solides sans conclure qu’un entrepreneur, un agent public ou un contrat particulier a impliqué un comportement irrégulier.","La date limite de dépôt des observations est le 15 janvier 2027. La commission a indiqué qu’elle prévoyait de publier un rapport l’année prochaine, mais il s’agit d’un calendrier attendu et non d’un engagement ferme de publication. Le commissaire peut modifier le mandat à la lumière des informations reçues. Les personnes ayant une expérience pertinente sont invitées à contacter le processus d’évaluation, tandis que les allégations concernant des dispositions contractuelles précises doivent être transmises au canal distinct de signalement des atteintes à l’intégrité.","Cette affaire peut intéresser d’autres grands projets, car l’intégrité des fournisseurs et la transparence de leur propriété sont des enjeux récurrents dans les marchés publics. Le mandat de la commission prévoit expressément d’examiner la portée plus large des conclusions éventuelles. Cela ne signifie pas que les dispositifs du projet T2D représentent tous les contrats d’infrastructure ni qu’un problème généralisé dans le secteur est établi. Un rapport solide devrait préciser quels contrôles ont été examinés, ce que l’échantillon permet ou non d’étayer et si les recommandations reposent sur des preuves documentées.","Pour les contribuables et les participants au projet, l’évolution à court terme est un processus de contrôle dont le périmètre est défini, avec une période ouverte de contribution et un rapport attendu en 2027. Les prochaines étapes importantes sont la collecte des preuves, la finalisation de la méthode et la publication des conclusions. D’ici là, la formulation appropriée est que l’autorité de contrôle d’Australie-Méridionale évalue les contrôles des risques liés aux achats et à la gestion des contrats d’un grand projet routier, et non qu’elle a découvert une corruption ou rendu une décision défavorable à une partie."],"sections":[]},"corrections":[],"country":"AU","data":{"blocks":[{"columns":[{"key":"measure","label":{"ar":"المقياس","de":"Kennzahl","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Ölçüt"},"language":"en","type":"text"},{"key":"detail","label":{"ar":"القيمة أو النطاق المعلن","de":"Gemeldeter Wert oder Umfang","en":"Reported value or scope","es":"Valor o alcance comunicado","fr":"Valeur ou périmètre communiqué","pt":"Valor ou âmbito comunicado","tr":"Bildirilen değer veya kapsam"},"language":"en","type":"text"}],"description":{"ar":"الأرقام والنطاق المنقولان من بيان المصدر الأولي.","de":"Zahlen und Umfang aus der Mitteilung der Primärquelle.","en":"Figures and scope reproduced from the primary source release.","es":"Cifras y alcance reproducidos del comunicado de la fuente primaria.","fr":"Chiffres et périmètre repris du communiqué de la source primaire.","pt":"Números e âmbito reproduzidos do comunicado da fonte primária.","tr":"Birincil kaynak açıklamasındaki rakamlar ve kapsam."},"id":"reported-data","methodology":{"ar":"نُقلت القيم من المصدر الأولي المشار إليه. وتظل الفترات والتقديرات والتعريفات والتحفظات مطابقة للمصدر؛ ولا يضيف هذا الجدول توقعاً أو تقديراً خارجياً.","de":"Die Werte wurden aus der zitierten Primärquelle übernommen. Zeiträume, Schätzungen, Definitionen und Vorbehalte entsprechen dieser Quelle; die Tabelle fügt keine Prognose oder externe Schätzung hinzu.","en":"Values are transcribed from the cited primary source. Periods, estimates, definitions and caveats follow that source; this table adds no forecast or external estimate.","es":"Los valores se transcriben de la fuente primaria citada. Los periodos, estimaciones, definiciones y salvedades siguen esa fuente; esta tabla no añade previsiones ni estimaciones externas.","fr":"Les valeurs sont transcrites de la source primaire citée. Les périodes, estimations, définitions et réserves suivent cette source; le tableau n’ajoute aucune prévision ni estimation externe.","pt":"Os valores foram transcritos da fonte primária citada. Os períodos, as estimativas, as definições e as ressalvas seguem essa fonte; esta tabela não acrescenta previsões nem estimativas externas.","tr":"Değerler atıf yapılan birincil kaynaktan aktarılmıştır. Dönemler, tahminler, tanımlar ve çekinceler kaynaktaki biçimiyle korunmuştur; bu tablo yeni bir tahmin veya dışarıdan bir hesap eklemez."},"rowTranslations":[{"detail":{"ar":"ممارسات المشتريات وإدارة العقود في مشروع طريق ريفر تورينز إلى دارلينغتون.","de":"Beschaffungs- und Vertragsmanagementpraktiken für das River-Torrens-to-Darlington-Projekt.","en":"Procurement and contract management practices for the River Torrens to Darlington Project.","es":"Prácticas de contratación y gestión contractual del proyecto River Torrens to Darlington.","fr":"Pratiques d’achat et de gestion des contrats du projet River Torrens to Darlington.","pt":"Práticas de aquisição e gestão de contratos do projeto River Torrens to Darlington.","tr":"River Torrens ile Darlington Projesi için ihale ve sözleşme yönetimi uygulamaları."},"measure":{"ar":"نطاق المراجعة","de":"Prüfungsumfang","en":"Review scope","es":"Alcance de la revisión","fr":"Périmètre de l’examen","pt":"Âmbito da análise","tr":"İncelemenin kapsamı"}},{"detail":{"ar":"فحص المناقصات، والإشراف على المقاولين والمتعاقدين من الباطن، وتغييرات الملكية، والرصد، والتصعيد، وسبل الرجوع التعاقدية.","de":"Ausschreibungsprüfung, Aufsicht über Auftragnehmer und Subunternehmer, Eigentümerwechsel, Überwachung, Eskalation und vertragliche Rechtsmittel.","en":"Tender screening, contractor and subcontractor oversight, ownership changes, monitoring, escalation and contractual recourse.","es":"Selección en licitaciones, supervisión de contratistas y subcontratistas, cambios de propiedad, seguimiento, escalamiento y recursos contractuales.","fr":"Sélection des appels d’offres, supervision des entrepreneurs et sous-traitants, changements de propriété, suivi, escalade et recours contractuels.","pt":"Triagem de concursos, supervisão de empreiteiros e subempreiteiros, alterações de propriedade, monitorização, escalonamento e recursos contratuais.","tr":"İhale ön elemesi, yüklenici ve alt yüklenici gözetimi, mülkiyet değişiklikleri, izleme, üst makamlara taşıma ve sözleşmesel başvuru yolları."},"measure":{"ar":"الضوابط قيد المراجعة","de":"Geprüfte Kontrollen","en":"Controls under review","es":"Controles objeto de revisión","fr":"Contrôles examinés","pt":"Controlos em análise","tr":"İncelenen kontroller"}},{"detail":{"ar":"15 يناير 2027.","de":"15. Januar 2027.","en":"15 January 2027.","es":"15 de enero de 2027.","fr":"15 janvier 2027.","pt":"15 de janeiro de 2027.","tr":"15 Ocak 2027."},"measure":{"ar":"موعد إغلاق الملاحظات","de":"Frist für Eingaben","en":"Submissions close","es":"Cierre del plazo de aportaciones","fr":"Clôture des contributions","pt":"Encerramento das contribuições","tr":"Başvuru son tarihi"}},{"detail":{"ar":"بدأ التقييم وجمع الأدلة؛ ولم يُعلن استنتاج بوقوع فساد.","de":"Bewertung und Beweiserhebung haben begonnen; eine Korruptionsfeststellung wurde nicht bekannt gegeben.","en":"Evaluation and evidence gathering have begun; no finding of corruption was announced.","es":"Han comenzado la evaluación y la recopilación de pruebas; no se anunció ninguna conclusión de corrupción.","fr":"L’évaluation et la collecte de preuves ont commencé; aucune conclusion de corruption n’a été annoncée.","pt":"A avaliação e a recolha de provas começaram; não foi anunciada qualquer conclusão de corrupção.","tr":"Değerlendirme ve kanıt toplama başladı; yolsuzluk tespiti açıklanmadı."},"measure":{"ar":"الحالة","de":"Status","en":"Status","es":"Estado","fr":"Statut","pt":"Estado","tr":"Durum"}}],"rows":[{"detail":"Procurement and contract management practices for the River Torrens to Darlington Project.","measure":"Review scope"},{"detail":"Tender screening, contractor and subcontractor oversight, ownership changes, monitoring, escalation and contractual recourse.","measure":"Controls under review"},{"detail":"15 January 2027.","measure":"Submissions close"},{"detail":"Evaluation and evidence gathering have begun; no finding of corruption was announced.","measure":"Status"}],"sourceUrls":["https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"],"title":{"ar":"نتائج مختارة من المصدر الأولي","de":"Ausgewählte Erkenntnisse aus der Primärquelle","en":"Selected findings from the primary source","es":"Hallazgos seleccionados de la fuente primaria","fr":"Constats sélectionnés de la source primaire","pt":"Constatações selecionadas da fonte primária","tr":"Birincil kaynaktaki seçilmiş bulgular"},"type":"table","updatedAt":"2026-11-12T16:15:00Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026/data/reported-data?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026/data/reported-data?lang=fr&format=json"},"id":"reported-data"}],"data_types":["table"],"editorial_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-efe86125-3d61-5828-9ba8-a558be08ca5a","event_period":"2026-11-11","event_period_basis":"event-or-reference-period","id":"south-australia-icac-torrens-darlington-project-evaluation-2026","image":null,"importance":0.6,"language":"fr","modified_at":"2026-11-12T17:28:41+00:00","publication_basis":"publication-record","published_at":"2026-11-12T17:28:41+00:00","reading_minutes":4,"region":"world","relations":[],"section_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"south-australia-icac-torrens-darlington-project-evaluation-2026","sources":[{"checkedAt":"2026-11-12","name":"Independent Commission Against Corruption South Australia","publishedAt":"2026-11-11","url":"https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"}],"summary":"La commission indépendante contre la corruption d’Australie-Méridionale a lancé une évaluation des achats et de la gestion des contrats du projet River Torrens to Darlington. L’examen portera sur la sélection et le suivi continu des entrepreneurs et sous-traitants, mais l’annonce ne constitue pas une conclusion de corruption ou de faute.","text":"La commission indépendante contre la corruption d’Australie-Méridionale a lancé une évaluation des achats et de la gestion des contrats du projet River Torrens to Darlington. L’examen portera sur la sélection et le suivi continu des entrepreneurs et sous-traitants, mais l’annonce ne constitue pas une conclusion de corruption ou de faute.\n\nLa commission indépendante contre la corruption d’Australie-Méridionale a ouvert une évaluation du ministère des Infrastructures et des Transports axée sur les achats et la gestion des contrats du projet River Torrens to Darlington. L’autorité de contrôle a publié le 11 novembre le mandat de l’évaluation et invité les agents publics, les entrepreneurs, les sous-traitants et les membres de la communauté à présenter des observations. Elle a indiqué que l’objectif était d’évaluer comment les politiques et contrôles existants gèrent les risques de corruption et empêchent de faire appel à des parties inappropriées.\n\nL’évaluation examinera la relation entre le ministère et la T2D Alliance, le dispositif de réalisation du projet nommé dans le mandat de la commission. Elle étudiera les rôles et responsabilités attribués à chacun, les critères utilisés pour évaluer l’admissibilité et l’aptitude aux appels d’offres ou à la sélection des contrats, ainsi que la manière dont ces décisions sont examinées. La commission prévoit aussi d’étudier le suivi continu des entrepreneurs et sous-traitants, notamment pour déterminer si les changements de propriété ou de structure de l’entreprise sont suivis pendant la durée d’un contrat.\n\nCette priorité reflète un défi central des grands programmes d’infrastructure : le contrôle au stade de l’appel d’offres n’est qu’un point de contrôle parmi d’autres. La propriété, la direction ou la situation financière d’un fournisseur peut changer après sa sélection, et un entrepreneur principal peut s’appuyer sur des sous-traitants dont le travail est moins visible pour l’autorité publique. La commission indique qu’elle évaluera la surveillance de la sécurité et de l’intégrité, les mécanismes de signalement, d’escalade et de réponse, ainsi que les recours possibles au titre des contrats. Elle n’a annoncé aucune conclusion selon laquelle ces contrôles auraient échoué.\n\nLa commission prévoit d’utiliser les contributions du public, des entretiens et l’examen des politiques, procédures et documents du projet. Elle entend également examiner un échantillon représentatif de contrats, car le projet comporte un grand nombre de dispositifs contractuels. La commission indique que la méthode d’évaluation n’est pas encore arrêtée. Le mandat publié définit donc les questions et les sources de preuves envisagées, tandis que l’échantillon précis, les critères de contrôle et les méthodes d’analyse restent à déterminer.\n\nL’évaluation n’est pas présentée comme une enquête ayant établi l’existence de corruption. Dans son communiqué, la commission a déclaré que son cadre légal ne lui permet pas de recevoir des signalements de corruption, de mauvaise administration ou de faute dans l’administration publique. Ces signalements doivent être adressés à l’Office for Public Integrity. Cette distinction est importante : un examen institutionnel de la gestion des risques peut relever des faiblesses ou recommander des contrôles plus solides sans conclure qu’un entrepreneur, un agent public ou un contrat particulier a impliqué un comportement irrégulier.\n\nLa date limite de dépôt des observations est le 15 janvier 2027. La commission a indiqué qu’elle prévoyait de publier un rapport l’année prochaine, mais il s’agit d’un calendrier attendu et non d’un engagement ferme de publication. Le commissaire peut modifier le mandat à la lumière des informations reçues. Les personnes ayant une expérience pertinente sont invitées à contacter le processus d’évaluation, tandis que les allégations concernant des dispositions contractuelles précises doivent être transmises au canal distinct de signalement des atteintes à l’intégrité.\n\nCette affaire peut intéresser d’autres grands projets, car l’intégrité des fournisseurs et la transparence de leur propriété sont des enjeux récurrents dans les marchés publics. Le mandat de la commission prévoit expressément d’examiner la portée plus large des conclusions éventuelles. Cela ne signifie pas que les dispositifs du projet T2D représentent tous les contrats d’infrastructure ni qu’un problème généralisé dans le secteur est établi. Un rapport solide devrait préciser quels contrôles ont été examinés, ce que l’échantillon permet ou non d’étayer et si les recommandations reposent sur des preuves documentées.\n\nPour les contribuables et les participants au projet, l’évolution à court terme est un processus de contrôle dont le périmètre est défini, avec une période ouverte de contribution et un rapport attendu en 2027. Les prochaines étapes importantes sont la collecte des preuves, la finalisation de la méthode et la publication des conclusions. D’ici là, la formulation appropriée est que l’autorité de contrôle d’Australie-Méridionale évalue les contrôles des risques liés aux achats et à la gestion des contrats d’un grand projet routier, et non qu’elle a découvert une corruption ou rendu une décision défavorable à une partie.","title":"L’autorité de surveillance d’Australie-Méridionale ouvre un examen des marchés d’un grand projet routier","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/south-australia-icac-torrens-darlington-project-evaluation-2026"}],"url":"https://newsverum.com/fr/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},"version":"1"}
