{"article":{"annotation":{"article_id":"south-australia-icac-torrens-darlington-project-evaluation-2026","available_at":"2026-11-12T17:29:12.883688Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"ed0e84b483f898eabce4593ae23e72375494f551f273bbdf97a00f2e040aac59","input_sha256":"cf32ea8c46c43fd28a80342b6f9d2c9c9d0c0acac986a716d21b7db68cc12b03","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"AU","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"]}],"geometry":null,"id":"iso3166-1:AU","kind":"country-or-area","labels":{"ar":"أستراليا","en":"Australia","es":"Australia","fr":"Australie"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=es","category":"infrastructure","content":{"key_points":[],"paragraphs":["La Comisión Independiente contra la Corrupción de Australia Meridional ha abierto una evaluación del Departamento de Infraestructura y Transporte centrada en las contrataciones y la gestión contractual del proyecto River Torrens to Darlington. El organismo de control publicó el 11 de noviembre los términos de referencia e invitó a presentar aportaciones a empleados públicos, contratistas, subcontratistas y miembros de la comunidad. Indicó que el propósito es evaluar cómo las políticas y controles existentes gestionan los riesgos de corrupción y evitan contratar a partes inadecuadas.","La evaluación examinará la relación entre el departamento y la alianza T2D, el modelo de ejecución del proyecto mencionado en los términos de referencia de la comisión. Analizará las funciones y responsabilidades asignadas a cada parte, los criterios utilizados para evaluar la elegibilidad y la idoneidad en licitaciones o selección de contratos, y cómo se revisan esas decisiones. La comisión también prevé examinar la supervisión continua de contratistas y subcontratistas, incluido si se siguen los cambios de propiedad o de estructura empresarial durante un contrato.","Este enfoque refleja un reto central de los grandes programas de infraestructura: la selección en la fase de licitación es solo un punto de control. La propiedad, el liderazgo o la situación financiera de un proveedor pueden cambiar después de su selección, y un contratista principal puede depender de subcontratistas cuyo trabajo resulta menos visible para la autoridad pública. La comisión afirma que evaluará la supervisión de seguridad e integridad, los mecanismos de notificación, escalamiento y respuesta, así como los posibles recursos conforme a las condiciones contractuales. No ha anunciado que alguno de esos controles haya fallado.","La ICAC espera utilizar aportaciones públicas, entrevistas y revisiones de políticas, procedimientos y documentos del proyecto. También pretende examinar una muestra representativa de contratos, ya que el proyecto cuenta con un gran volumen de acuerdos contractuales. La comisión afirma que la metodología de revisión todavía debe finalizarse. Esa salvedad significa que los términos publicados describen las preguntas y las fuentes de evidencia previstas, mientras que la muestra precisa, los criterios de evaluación y los métodos analíticos siguen pendientes de definición.","La evaluación no se presenta como una investigación que haya demostrado corrupción. En su comunicado, la comisión dijo que, conforme a su marco legal, no puede recibir denuncias de corrupción, mala administración o conducta indebida en la administración pública. Esas denuncias deben dirigirse a la Oficina para la Integridad Pública. La distinción importa: una revisión institucional de la gestión de riesgos puede identificar debilidades o recomendar controles más sólidos sin concluir que un contratista, funcionario o contrato específico haya implicado una conducta impropia.","El plazo para presentar aportaciones termina el 15 de enero de 2027. La ICAC dijo que prevé publicar un informe el próximo año, aunque se trata de un calendario previsto y no de un compromiso fijo de publicación. El comisionado puede modificar los términos de referencia a la luz de la información recibida. Se invita a las personas con experiencia pertinente a contactar con el proceso de evaluación, mientras que las acusaciones sobre acuerdos contractuales específicos deben enviarse al canal separado de denuncias de integridad.","El caso podría ser relevante para otros grandes proyectos porque la integridad de los proveedores y la transparencia de la propiedad son asuntos recurrentes en la contratación pública. Los términos de la comisión contemplan expresamente la posible aplicación más amplia de cualquier hallazgo. Eso no significa que los acuerdos de T2D representen todos los contratos de infraestructura ni que se haya establecido un problema sectorial. Un informe sólido tendría que indicar qué controles se revisaron, qué puede y qué no puede respaldar la muestra, y si las recomendaciones están vinculadas a evidencia documentada.","Para los contribuyentes y los participantes del proyecto, el desarrollo inmediato es un proceso de escrutinio con alcance definido, un periodo abierto para aportaciones y un informe previsto para 2027. Los siguientes hitos relevantes son la recopilación de pruebas, la metodología finalizada y la publicación de los resultados. Hasta que se completen esos pasos, la descripción adecuada es que el organismo de control de Australia Meridional está evaluando los controles de riesgo de contratación y gestión contractual de un gran proyecto vial, no que haya descubierto corrupción o emitido una determinación contra alguna parte."],"sections":[]},"corrections":[],"country":"AU","data":{"blocks":[{"columns":[{"key":"measure","label":{"ar":"المقياس","de":"Kennzahl","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Ölçüt"},"language":"en","type":"text"},{"key":"detail","label":{"ar":"القيمة أو النطاق المعلن","de":"Gemeldeter Wert oder Umfang","en":"Reported value or scope","es":"Valor o alcance comunicado","fr":"Valeur ou périmètre communiqué","pt":"Valor ou âmbito comunicado","tr":"Bildirilen değer veya kapsam"},"language":"en","type":"text"}],"description":{"ar":"الأرقام والنطاق المنقولان من بيان المصدر الأولي.","de":"Zahlen und Umfang aus der Mitteilung der Primärquelle.","en":"Figures and scope reproduced from the primary source release.","es":"Cifras y alcance reproducidos del comunicado de la fuente primaria.","fr":"Chiffres et périmètre repris du communiqué de la source primaire.","pt":"Números e âmbito reproduzidos do comunicado da fonte primária.","tr":"Birincil kaynak açıklamasındaki rakamlar ve kapsam."},"id":"reported-data","methodology":{"ar":"نُقلت القيم من المصدر الأولي المشار إليه. وتظل الفترات والتقديرات والتعريفات والتحفظات مطابقة للمصدر؛ ولا يضيف هذا الجدول توقعاً أو تقديراً خارجياً.","de":"Die Werte wurden aus der zitierten Primärquelle übernommen. Zeiträume, Schätzungen, Definitionen und Vorbehalte entsprechen dieser Quelle; die Tabelle fügt keine Prognose oder externe Schätzung hinzu.","en":"Values are transcribed from the cited primary source. Periods, estimates, definitions and caveats follow that source; this table adds no forecast or external estimate.","es":"Los valores se transcriben de la fuente primaria citada. Los periodos, estimaciones, definiciones y salvedades siguen esa fuente; esta tabla no añade previsiones ni estimaciones externas.","fr":"Les valeurs sont transcrites de la source primaire citée. Les périodes, estimations, définitions et réserves suivent cette source; le tableau n’ajoute aucune prévision ni estimation externe.","pt":"Os valores foram transcritos da fonte primária citada. Os períodos, as estimativas, as definições e as ressalvas seguem essa fonte; esta tabela não acrescenta previsões nem estimativas externas.","tr":"Değerler atıf yapılan birincil kaynaktan aktarılmıştır. Dönemler, tahminler, tanımlar ve çekinceler kaynaktaki biçimiyle korunmuştur; bu tablo yeni bir tahmin veya dışarıdan bir hesap eklemez."},"rowTranslations":[{"detail":{"ar":"ممارسات المشتريات وإدارة العقود في مشروع طريق ريفر تورينز إلى دارلينغتون.","de":"Beschaffungs- und Vertragsmanagementpraktiken für das River-Torrens-to-Darlington-Projekt.","en":"Procurement and contract management practices for the River Torrens to Darlington Project.","es":"Prácticas de contratación y gestión contractual del proyecto River Torrens to Darlington.","fr":"Pratiques d’achat et de gestion des contrats du projet River Torrens to Darlington.","pt":"Práticas de aquisição e gestão de contratos do projeto River Torrens to Darlington.","tr":"River Torrens ile Darlington Projesi için ihale ve sözleşme yönetimi uygulamaları."},"measure":{"ar":"نطاق المراجعة","de":"Prüfungsumfang","en":"Review scope","es":"Alcance de la revisión","fr":"Périmètre de l’examen","pt":"Âmbito da análise","tr":"İncelemenin kapsamı"}},{"detail":{"ar":"فحص المناقصات، والإشراف على المقاولين والمتعاقدين من الباطن، وتغييرات الملكية، والرصد، والتصعيد، وسبل الرجوع التعاقدية.","de":"Ausschreibungsprüfung, Aufsicht über Auftragnehmer und Subunternehmer, Eigentümerwechsel, Überwachung, Eskalation und vertragliche Rechtsmittel.","en":"Tender screening, contractor and subcontractor oversight, ownership changes, monitoring, escalation and contractual recourse.","es":"Selección en licitaciones, supervisión de contratistas y subcontratistas, cambios de propiedad, seguimiento, escalamiento y recursos contractuales.","fr":"Sélection des appels d’offres, supervision des entrepreneurs et sous-traitants, changements de propriété, suivi, escalade et recours contractuels.","pt":"Triagem de concursos, supervisão de empreiteiros e subempreiteiros, alterações de propriedade, monitorização, escalonamento e recursos contratuais.","tr":"İhale ön elemesi, yüklenici ve alt yüklenici gözetimi, mülkiyet değişiklikleri, izleme, üst makamlara taşıma ve sözleşmesel başvuru yolları."},"measure":{"ar":"الضوابط قيد المراجعة","de":"Geprüfte Kontrollen","en":"Controls under review","es":"Controles objeto de revisión","fr":"Contrôles examinés","pt":"Controlos em análise","tr":"İncelenen kontroller"}},{"detail":{"ar":"15 يناير 2027.","de":"15. Januar 2027.","en":"15 January 2027.","es":"15 de enero de 2027.","fr":"15 janvier 2027.","pt":"15 de janeiro de 2027.","tr":"15 Ocak 2027."},"measure":{"ar":"موعد إغلاق الملاحظات","de":"Frist für Eingaben","en":"Submissions close","es":"Cierre del plazo de aportaciones","fr":"Clôture des contributions","pt":"Encerramento das contribuições","tr":"Başvuru son tarihi"}},{"detail":{"ar":"بدأ التقييم وجمع الأدلة؛ ولم يُعلن استنتاج بوقوع فساد.","de":"Bewertung und Beweiserhebung haben begonnen; eine Korruptionsfeststellung wurde nicht bekannt gegeben.","en":"Evaluation and evidence gathering have begun; no finding of corruption was announced.","es":"Han comenzado la evaluación y la recopilación de pruebas; no se anunció ninguna conclusión de corrupción.","fr":"L’évaluation et la collecte de preuves ont commencé; aucune conclusion de corruption n’a été annoncée.","pt":"A avaliação e a recolha de provas começaram; não foi anunciada qualquer conclusão de corrupção.","tr":"Değerlendirme ve kanıt toplama başladı; yolsuzluk tespiti açıklanmadı."},"measure":{"ar":"الحالة","de":"Status","en":"Status","es":"Estado","fr":"Statut","pt":"Estado","tr":"Durum"}}],"rows":[{"detail":"Procurement and contract management practices for the River Torrens to Darlington Project.","measure":"Review scope"},{"detail":"Tender screening, contractor and subcontractor oversight, ownership changes, monitoring, escalation and contractual recourse.","measure":"Controls under review"},{"detail":"15 January 2027.","measure":"Submissions close"},{"detail":"Evaluation and evidence gathering have begun; no finding of corruption was announced.","measure":"Status"}],"sourceUrls":["https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"],"title":{"ar":"نتائج مختارة من المصدر الأولي","de":"Ausgewählte Erkenntnisse aus der Primärquelle","en":"Selected findings from the primary source","es":"Hallazgos seleccionados de la fuente primaria","fr":"Constats sélectionnés de la source primaire","pt":"Constatações selecionadas da fonte primária","tr":"Birincil kaynaktaki seçilmiş bulgular"},"type":"table","updatedAt":"2026-11-12T16:15:00Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026/data/reported-data?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026/data/reported-data?lang=es&format=json"},"id":"reported-data"}],"data_types":["table"],"editorial_illustration":{"alt":"Ilustración conceptual de transporte, puentes y conexiones de infraestructura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-efe86125-3d61-5828-9ba8-a558be08ca5a","event_period":"2026-11-11","event_period_basis":"event-or-reference-period","id":"south-australia-icac-torrens-darlington-project-evaluation-2026","image":null,"importance":0.6,"language":"es","modified_at":"2026-11-12T17:28:41+00:00","publication_basis":"publication-record","published_at":"2026-11-12T17:28:41+00:00","reading_minutes":4,"region":"world","relations":[],"section_illustration":{"alt":"Ilustración conceptual de transporte, puentes y conexiones de infraestructura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"south-australia-icac-torrens-darlington-project-evaluation-2026","sources":[{"checkedAt":"2026-11-12","name":"Independent Commission Against Corruption South Australia","publishedAt":"2026-11-11","url":"https://www.icac.sa.gov.au/indexable-assets/media-and-news/media-releases/media-release-icac-invites-public-submissions-as-it-begins-its-evaluation-of-the-department-for-infrastructure-and-transport"}],"summary":"La Comisión Independiente contra la Corrupción de Australia Meridional ha iniciado una evaluación de las contrataciones y la gestión contractual del proyecto River Torrens to Darlington. La revisión examinará la selección y supervisión continua de contratistas y subcontratistas, pero el anuncio no constituye una conclusión de corrupción o conducta indebida.","text":"La Comisión Independiente contra la Corrupción de Australia Meridional ha iniciado una evaluación de las contrataciones y la gestión contractual del proyecto River Torrens to Darlington. La revisión examinará la selección y supervisión continua de contratistas y subcontratistas, pero el anuncio no constituye una conclusión de corrupción o conducta indebida.\n\nLa Comisión Independiente contra la Corrupción de Australia Meridional ha abierto una evaluación del Departamento de Infraestructura y Transporte centrada en las contrataciones y la gestión contractual del proyecto River Torrens to Darlington. El organismo de control publicó el 11 de noviembre los términos de referencia e invitó a presentar aportaciones a empleados públicos, contratistas, subcontratistas y miembros de la comunidad. Indicó que el propósito es evaluar cómo las políticas y controles existentes gestionan los riesgos de corrupción y evitan contratar a partes inadecuadas.\n\nLa evaluación examinará la relación entre el departamento y la alianza T2D, el modelo de ejecución del proyecto mencionado en los términos de referencia de la comisión. Analizará las funciones y responsabilidades asignadas a cada parte, los criterios utilizados para evaluar la elegibilidad y la idoneidad en licitaciones o selección de contratos, y cómo se revisan esas decisiones. La comisión también prevé examinar la supervisión continua de contratistas y subcontratistas, incluido si se siguen los cambios de propiedad o de estructura empresarial durante un contrato.\n\nEste enfoque refleja un reto central de los grandes programas de infraestructura: la selección en la fase de licitación es solo un punto de control. La propiedad, el liderazgo o la situación financiera de un proveedor pueden cambiar después de su selección, y un contratista principal puede depender de subcontratistas cuyo trabajo resulta menos visible para la autoridad pública. La comisión afirma que evaluará la supervisión de seguridad e integridad, los mecanismos de notificación, escalamiento y respuesta, así como los posibles recursos conforme a las condiciones contractuales. No ha anunciado que alguno de esos controles haya fallado.\n\nLa ICAC espera utilizar aportaciones públicas, entrevistas y revisiones de políticas, procedimientos y documentos del proyecto. También pretende examinar una muestra representativa de contratos, ya que el proyecto cuenta con un gran volumen de acuerdos contractuales. La comisión afirma que la metodología de revisión todavía debe finalizarse. Esa salvedad significa que los términos publicados describen las preguntas y las fuentes de evidencia previstas, mientras que la muestra precisa, los criterios de evaluación y los métodos analíticos siguen pendientes de definición.\n\nLa evaluación no se presenta como una investigación que haya demostrado corrupción. En su comunicado, la comisión dijo que, conforme a su marco legal, no puede recibir denuncias de corrupción, mala administración o conducta indebida en la administración pública. Esas denuncias deben dirigirse a la Oficina para la Integridad Pública. La distinción importa: una revisión institucional de la gestión de riesgos puede identificar debilidades o recomendar controles más sólidos sin concluir que un contratista, funcionario o contrato específico haya implicado una conducta impropia.\n\nEl plazo para presentar aportaciones termina el 15 de enero de 2027. La ICAC dijo que prevé publicar un informe el próximo año, aunque se trata de un calendario previsto y no de un compromiso fijo de publicación. El comisionado puede modificar los términos de referencia a la luz de la información recibida. Se invita a las personas con experiencia pertinente a contactar con el proceso de evaluación, mientras que las acusaciones sobre acuerdos contractuales específicos deben enviarse al canal separado de denuncias de integridad.\n\nEl caso podría ser relevante para otros grandes proyectos porque la integridad de los proveedores y la transparencia de la propiedad son asuntos recurrentes en la contratación pública. Los términos de la comisión contemplan expresamente la posible aplicación más amplia de cualquier hallazgo. Eso no significa que los acuerdos de T2D representen todos los contratos de infraestructura ni que se haya establecido un problema sectorial. Un informe sólido tendría que indicar qué controles se revisaron, qué puede y qué no puede respaldar la muestra, y si las recomendaciones están vinculadas a evidencia documentada.\n\nPara los contribuyentes y los participantes del proyecto, el desarrollo inmediato es un proceso de escrutinio con alcance definido, un periodo abierto para aportaciones y un informe previsto para 2027. Los siguientes hitos relevantes son la recopilación de pruebas, la metodología finalizada y la publicación de los resultados. Hasta que se completen esos pasos, la descripción adecuada es que el organismo de control de Australia Meridional está evaluando los controles de riesgo de contratación y gestión contractual de un gran proyecto vial, no que haya descubierto corrupción o emitido una determinación contra alguna parte.","title":"El organismo de control de Australia Meridional abre una revisión de las contrataciones de un gran proyecto vial","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/south-australia-icac-torrens-darlington-project-evaluation-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/south-australia-icac-torrens-darlington-project-evaluation-2026"}],"url":"https://newsverum.com/es/news/south-australia-icac-torrens-darlington-project-evaluation-2026"},"version":"1"}
