{"article":{"annotation":{"article_id":"socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026","available_at":"2026-10-12T09:40:38.030860Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"45b518f61a995a2bcad048a447420b1cd5bbbb19b9d4d1b3c20f3db3de796b5b","input_sha256":"55791233c8e9a9c1cefa3940e56a1f265d3696a0d5165baf01148b8529030756","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"AZ","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.socar.az/en/post/shareholders-agreement-signed-for-the-construction-of-a-combined-cycle-gas-fired-power-plant-in-nis"]}],"geometry":null,"id":"iso3166-1:AZ","kind":"country-or-area","labels":{"ar":"أذربيجان","en":"Azerbaijan","es":"Azerbaiyán","fr":"Azerbaïdjan"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000263","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: gas plant","source_urls":["https://www.socar.az/en/post/shareholders-agreement-signed-for-the-construction-of-a-combined-cycle-gas-fired-power-plant-in-nis"]}],"method":"controlled-rules-v1","rule_id":"natural-gas","status":"candidate"},{"concept_id":"medtop:20000260","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: combined-cycle","source_urls":["https://www.socar.az/en/post/shareholders-agreement-signed-for-the-construction-of-a-combined-cycle-gas-fired-power-plant-in-nis"]}],"method":"controlled-rules-v1","rule_id":"electricity","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["Under the agreement, the Azerbaijani side would hold 50% of the venture and the Serbian companies collectively the other 50%. SOCAR said the signing took place in Belgrade but did not give a specific signing date.","The document sets out financing terms for project activities and requires unanimous approval of key decisions during preparation. The 500 MW is planned capacity; the announcement does not say construction has begun or that the plant is generating electricity."],"sections":[]},"corrections":[{"at":"2026-10-12T06:43:41+03:00","language":"en","text":"Full translations of the table text cells were added in all seven languages. Original source values and numerical observations were preserved."},{"at":"2026-10-12T06:43:42+03:00","language":"en","text":"Wording in this article's language editions was corrected to retain the article's full information and scope."}],"country":"AZ","data":{"blocks":[{"columns":[{"key":"scope","label":{"ar":"النطاق","de":"Umfang","en":"Scope","es":"Ámbito","fr":"Portée","pt":"Âmbito","tr":"Kapsam"},"language":"en","type":"text"},{"key":"planned_capacity","label":{"ar":"القدرة الكهربائية المخططة","de":"Geplante elektrische Leistung","en":"Planned electrical capacity","es":"Capacidad eléctrica prevista","fr":"Capacité électrique prévue","pt":"Capacidade elétrica prevista","tr":"Planlanan elektrik kapasitesi"},"type":"number","unit":"MW"},{"key":"share","label":{"ar":"حصة المشروع المشترك","de":"Anteil am Gemeinschaftsunternehmen","en":"Joint-venture share","es":"Participación en la empresa conjunta","fr":"Part de la coentreprise","pt":"Participação na empresa conjunta","tr":"Ortak girişim payı"},"type":"number","unit":"%"}],"description":{"ar":"القدرة الكهربائية المخططة وحصص المشروع المشترك وفق بيان سوكار في 1 أكتوبر. ومن المخطط إقامة المحطة في نيش بصربيا.","de":"Geplante Stromkapazität und Anteile am Gemeinschaftsunternehmen laut SOCAR-Mitteilung vom 1. Oktober. Das Kraftwerk ist in Niš, Serbien, geplant.","en":"Planned power capacity and joint-venture shares stated in SOCAR’s 1 October announcement. The plant is planned for Niš, Serbia.","es":"Capacidad eléctrica prevista y participaciones de la empresa conjunta según el comunicado de SOCAR del 1 de octubre. La central está prevista en Niš, Serbia.","fr":"Capacité électrique prévue et parts de la coentreprise selon le communiqué de SOCAR du 1er octobre. La centrale est prévue à Niš, en Serbie.","pt":"Capacidade elétrica prevista e participações na empresa conjunta segundo o comunicado da SOCAR de 1 de outubro. A central está prevista para Niš, Sérvia.","tr":"SOCAR’ın 1 Ekim açıklamasında belirtilen planlanan elektrik kapasitesi ve ortak girişim payları. Santral Sırbistan’ın Niš kentinde planlanıyor."},"id":"planned-nis-gas-power-plant-and-jv-ownership","methodology":{"ar":"نُقلت الأرقام عن بيان سوكار. وتمثل 500 ميغاواط قدرة المحطة المخططة، وليست إنتاجاً قائماً أو قدرة تشغيلية. ويخصص البيان 50% من المشروع المشترك للجانب الأذربيجاني و50% إجمالاً للشركات الصربية. وهذا اتفاق مساهمين، وليس عقد إنشاء محطة أو إعلاناً عن بدء البناء.","de":"Die Angaben stammen aus der SOCAR-Mitteilung. Die 500 MW sind die geplante Kraftwerkskapazität, keine bestehende Erzeugung oder in Betrieb befindliche Leistung. Laut Mitteilung hält die aserbaidschanische Seite 50 % am Gemeinschaftsunternehmen, die serbischen Unternehmen zusammen die übrigen 50 %. Es handelt sich um eine Aktionärsvereinbarung, nicht um einen Bauvertrag oder eine Meldung über den Baubeginn.","en":"Figures are transcribed from SOCAR’s announcement. The 500 MW is planned plant capacity, not existing generation or operating capacity. The release assigns 50% of the joint venture to the Azerbaijani side and 50% collectively to the Serbian companies. This is a shareholders’ agreement, not a plant construction contract or notice that construction has started.","es":"Las cifras se transcriben del comunicado de SOCAR. Los 500 MW son la capacidad prevista de la central, no generación existente ni capacidad operativa. El comunicado asigna el 50% de la empresa conjunta a la parte azerbaiyana y el otro 50% en conjunto a las empresas serbias. Se trata de un acuerdo de accionistas, no de un contrato de construcción ni de un anuncio del inicio de las obras.","fr":"Les chiffres sont repris du communiqué de SOCAR. Les 500 MW correspondent à la capacité prévue de la centrale, et non à une production existante ou à une capacité en service. Le communiqué attribue 50 % de la coentreprise à la partie azerbaïdjanaise et 50 % au total aux entreprises serbes. Il s’agit d’un accord d’actionnaires, pas d’un contrat de construction ni d’une annonce de début des travaux.","pt":"Os valores foram transcritos do comunicado da SOCAR. Os 500 MW são a capacidade prevista da central, não geração existente nem capacidade em operação. O comunicado atribui 50% da empresa conjunta à parte azeri e os outros 50%, em conjunto, às empresas sérvias. Trata-se de um acordo de acionistas, não de um contrato de construção nem de um anúncio de início das obras.","tr":"Veriler SOCAR açıklamasından aktarıldı. 500 MW planlanan santral kapasitesidir; mevcut üretim veya işletmedeki güç değildir. Açıklama ortak girişimde Azerbaycan tarafına %50, Sırp şirketlere toplam %50 pay öngörür. Bu bir hissedarlar anlaşmasıdır; santral inşaat sözleşmesi veya inşaatın başladığı bildirimi değildir."},"rowTranslations":[{"scope":{"ar":"محطة كهرباء تعمل بالغاز بنظام الدورة المركبة مخطط لها في نيش، صربيا","de":"Geplantes Gas-und-Dampf-Kraftwerk in Niš, Serbien","en":"Planned combined-cycle gas-fired plant in Niš, Serbia","es":"Central de ciclo combinado a gas prevista en Niš, Serbia","fr":"Centrale au gaz à cycle combiné prévue à Niš, en Serbie","pt":"Usina a gás de ciclo combinado planejada em Niš, Sérvia","tr":"Sırbistan'ın Niş kentinde planlanan kombine çevrim gaz santrali"}},{"scope":{"ar":"الجانب الأذربيجاني في المشروع المشترك","de":"Aserbaidschanische Seite im Gemeinschaftsunternehmen","en":"Azerbaijani side in joint venture","es":"Parte azerbaiyana en la empresa conjunta","fr":"Partie azerbaïdjanaise dans la coentreprise","pt":"Parte azeri na empresa conjunta","tr":"Ortak girişimde Azerbaycan tarafı"}},{"scope":{"ar":"الشركات الصربية في المشروع المشترك (مجتمعة)","de":"Serbische Unternehmen im Gemeinschaftsunternehmen (zusammen)","en":"Serbian companies (collectively) in joint venture","es":"Empresas serbias en la empresa conjunta (en conjunto)","fr":"Entreprises serbes dans la coentreprise (ensemble)","pt":"Empresas sérvias na joint venture (em conjunto)","tr":"Ortak girişimdeki Sırp şirketler (toplam)"}}],"rows":[{"planned_capacity":500,"scope":"Planned combined-cycle gas-fired plant in Niš, Serbia","share":null},{"planned_capacity":null,"scope":"Azerbaijani side in joint venture","share":50},{"planned_capacity":null,"scope":"Serbian companies (collectively) in joint venture","share":50}],"sourceUrls":["https://www.socar.az/en/post/shareholders-agreement-signed-for-the-construction-of-a-combined-cycle-gas-fired-power-plant-in-nis"],"title":{"ar":"المحطة المخططة في نيش وحصص المشروع المشترك","de":"Geplantes Kraftwerk in Niš und Anteile am Gemeinschaftsunternehmen","en":"Planned Niš plant and joint-venture shares","es":"Central prevista en Niš y participaciones de la empresa conjunta","fr":"Centrale prévue à Niš et parts de la coentreprise","pt":"Central prevista em Niš e participações na empresa conjunta","tr":"Niš’te planlanan santral ve ortaklık payları"},"type":"table","updatedAt":"2026-10-12T06:43:41+03:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026/data/planned-nis-gas-power-plant-and-jv-ownership?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026/data/planned-nis-gas-power-plant-and-jv-ownership?lang=en&format=json"},"id":"planned-nis-gas-power-plant-and-jv-ownership"}],"data_types":["table"],"editorial_illustration":{"alt":"Conceptual illustration of oil and gas infrastructure and information flows.","asset_id":"newsverum-v1-oil-gas","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-1536.webp","width":1536}],"width":1536},"event_id":"event-bc911772-a82d-546c-8a84-c7966627bb2a","event_period":"2026-10-01","event_period_basis":"source-review","id":"socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-12T06:43:42+03:00","publication_basis":"publication-record","published_at":"2026-10-10T14:10:20+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026","sources":[{"checkedAt":"2026-10-10","name":"SOCAR","publishedAt":"2026-10-01","url":"https://www.socar.az/en/post/shareholders-agreement-signed-for-the-construction-of-a-combined-cycle-gas-fired-power-plant-in-nis"}],"summary":"SOCAR said it signed a joint-venture agreement with Serbian energy companies EPS and Srbijagas for a planned 500 MW combined-cycle gas-fired plant in Niš.","text":"SOCAR said it signed a joint-venture agreement with Serbian energy companies EPS and Srbijagas for a planned 500 MW combined-cycle gas-fired plant in Niš.\n\nUnder the agreement, the Azerbaijani side would hold 50% of the venture and the Serbian companies collectively the other 50%. SOCAR said the signing took place in Belgrade but did not give a specific signing date.\n\nThe document sets out financing terms for project activities and requires unanimous approval of key decisions during preparation. The 500 MW is planned capacity; the announcement does not say construction has begun or that the plant is generating electricity.\n\nFull translations of the table text cells were added in all seven languages. Original source values and numerical observations were preserved.\n\nWording in this article's language editions was corrected to retain the article's full information and scope.","title":"SOCAR signs agreement for planned 500 MW gas plant in Serbia","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026"},{"api_url":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026"},{"api_url":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026"},{"api_url":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026"},{"api_url":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026"},{"api_url":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026"},{"api_url":"https://newsverum.com/api/v1/articles/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026"}],"url":"https://newsverum.com/en/news/socar-serbia-nis-500mw-gas-power-plant-shareholders-agreement-2026"},"version":"1"}
