{"article":{"annotation":{"article_id":"sivrihisar-kinik-ges-depolama-planlari-ekim-2026","available_at":"2026-10-06T23:11:16.648199Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"b15cb52268d863c0ff3a15b27f1e66bbe7b917e74257a0721befa9d84508e28c","input_sha256":"71ff6166a325318718a01a40736c5b77993c0bd3fd1c3ef5d82e98846b331dd6","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"TR","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.enerji.gov.tr/duyuru-detay?id=30641"]}],"geometry":null,"id":"iso3166-1:TR","kind":"country-or-area","labels":{"ar":"تركيا","en":"Türkiye","es":"Türkiye","fr":"Türkiye"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"d28c9c89703b56bd91fd887965d416d0115c2473d4bfbd3e558bcceafc3941dd","schema_version":1,"subjects":[{"concept_id":"medtop:20001209","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: solar","source_urls":["https://www.enerji.gov.tr/duyuru-detay?id=30641"]}],"method":"controlled-rules-v1","rule_id":"solar-power","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection?lang=pt","category":"energy","content":{"key_points":[],"paragraphs":["Documentos de planejamento do empreendimento proposto no lote 1116, em Kınık, Sivrihisar, Eskişehir, ficaram disponíveis para consulta pública por 15 dias a partir de 1º de outubro de 2026, segundo o Ministério da Energia. O plano diretor na escala 1:5.000 e o plano de implementação na escala 1:1.000 foram aprovados em 28 de setembro.","Os identificadores dos planos são NİP-261149857 / UİP-261149860. Os documentos podem ser consultados no site do ministério, no quadro de avisos de seu prédio principal e no sistema e-plan. Trata-se de um anúncio de planejamento; não foi anunciado o início da geração de eletricidade."],"sections":[]},"corrections":[{"at":"2026-10-06T21:57:28+03:00","language":"pt","text":"As traduções que faltavam neste artigo foram acrescentadas."},{"at":"2026-10-07T00:49:05+03:00","language":"pt","text":"Este artigo recebeu edições em alemão e português, além das traduções das explicações dos dados e das correções nesses idiomas."}],"country":"TR","data":null,"data_downloads":[],"data_types":[],"editorial_illustration":{"alt":"Ilustração conceitual de geração de eletricidade, armazenamento e dados conectados.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"pt","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-2ec82587-8fd9-5072-8579-ad659e7e4b54","event_period":"2026-10-01","event_period_basis":"event-or-reference-period","id":"sivrihisar-kinik-ges-depolama-planlari-ekim-2026","image":null,"importance":0.4,"language":"pt","modified_at":"2026-10-07T00:49:05+03:00","publication_basis":"publication-record","published_at":"2026-10-02T15:13:35+03:00","reading_minutes":1,"region":"turkiye","section_illustration":{"alt":"Ilustração conceitual de geração de eletricidade, armazenamento e dados conectados.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"pt","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"sivrihisar-kinik-solar-and-storage-plans-open-for-inspection","sources":[{"checkedAt":"2026-10-02","name":"Enerji ve Tabii Kaynaklar Bakanlığı","url":"https://www.enerji.gov.tr/duyuru-detay?id=30641"}],"summary":"Planos que abrangem o lote 1116 em Kınık foram abertos para consulta em 1º de outubro.","text":"Planos que abrangem o lote 1116 em Kınık foram abertos para consulta em 1º de outubro.\n\nDocumentos de planejamento do empreendimento proposto no lote 1116, em Kınık, Sivrihisar, Eskişehir, ficaram disponíveis para consulta pública por 15 dias a partir de 1º de outubro de 2026, segundo o Ministério da Energia. O plano diretor na escala 1:5.000 e o plano de implementação na escala 1:1.000 foram aprovados em 28 de setembro.\n\nOs identificadores dos planos são NİP-261149857 / UİP-261149860. Os documentos podem ser consultados no site do ministério, no quadro de avisos de seu prédio principal e no sistema e-plan. Trata-se de um anúncio de planejamento; não foi anunciado o início da geração de eletricidade.\n\nAs traduções que faltavam neste artigo foram acrescentadas.\n\nEste artigo recebeu edições em alemão e português, além das traduções das explicações dos dados e das correções nesses idiomas.","title":"Planos de energia solar e armazenamento de Sivrihisar-Kınık ficam disponíveis para consulta","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection?lang=en","language":"en","url":"https://newsverum.com/en/news/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection?lang=es","language":"es","url":"https://newsverum.com/es/news/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection?lang=de","language":"de","url":"https://newsverum.com/de/news/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection"}],"url":"https://newsverum.com/pt/news/sivrihisar-kinik-solar-and-storage-plans-open-for-inspection"},"version":"1"}
