{"article":{"annotation":{"article_id":"selkirk-minto-north-drill-results-october-2026","available_at":"2026-10-15T16:53:30.955331Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"6b09416e2a483f6ab16203d2e185c9246da1d3e5051e1bc23480a7ce5ba5c825","input_sha256":"c556b3b89df50d479dc307a78c5b0f7e3b23daee420e070efded36aa254cc8e5","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"CA","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.newsfilecorp.com/release/319123"]}],"geometry":null,"id":"iso3166-1:CA","kind":"country-or-area","labels":{"ar":"كندا","en":"Canada","es":"Canadá","fr":"Canada"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000344","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.newsfilecorp.com/release/319123"]}],"method":"controlled-rules-v1","rule_id":"economy-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026?lang=tr","category":"economy","content":{"key_points":[],"paragraphs":["Selkirk Copper, Minto bakır-altın-gümüş projesindeki Faz 2 programının Temmuz 2026’da açılan deliklerine ait yeni sonuçları yayımladı. Şirket, Minto North’taki 26SCM237 deliğinde 44,7 metre boyunca %2,12 bakır, ton başına 1,16 gram altın ve 10,7 gram gümüş bildirdi; aralık kuyu içi uzunluktur.","Duyuru, aynı delikte 11,1 metre ve 9,2 metrelik iç aralıklar ile başka bölgelerdeki sonuçları da listeliyor. Şirket, Faz 2’de 14 Ekim’e kadar 223 delikte 54.711 metre sondaj yapıldığını söyledi. Gerçek genişlikler şirketçe karot uzunluğunun yaklaşık %80–90’ı olarak tahmin edildi; sondaj kesişimleri tek başına kaynak artışı veya ekonomik çıkarılabilirlik kanıtı değildir."],"sections":[]},"corrections":[],"country":"CA","data":{"blocks":[{"description":{"ar":"يلخص هذا السجل الإعلان الأصلي ولا يمثل تحققاً مستقلاً.","de":"Dieser Eintrag fasst die Primärmitteilung zusammen und ist keine unabhängige Prüfung.","en":"This record summarizes the primary announcement; it is not independent verification.","es":"Este registro resume el anuncio primario y no constituye una verificación independiente.","fr":"Cette fiche résume l’annonce primaire et ne constitue pas une vérification indépendante.","pt":"Este registro resume o anúncio primário e não constitui verificação independente.","tr":"Bu kayıt birincil duyurunun beyanını özetler; bağımsız doğrulama değildir."},"id":"reported-announcement","items":[{"date":"2026-10-15","description":{"ar":"أظهر الثقب 26SCM237 من حفر يوليو أيضاً الذهب والفضة؛ والأطوال المعلنة قياسات داخل البئر.","de":"Bohrloch 26SCM237 aus den Juli-Bohrungen wies auch Gold und Silber auf; die Längen sind Bohrlochintervalle.","en":"Hole 26SCM237 from July drilling also returned gold and silver; reported lengths are downhole intervals.","es":"El sondeo 26SCM237 de la campaña de julio también registró oro y plata; las longitudes son intervalos de fondo de pozo.","fr":"Le trou 26SCM237, foré en juillet, a aussi livré de l’or et de l’argent ; les longueurs sont mesurées en fond de trou.","pt":"O furo 26SCM237 da campanha de julho também apresentou ouro e prata; os comprimentos são intervalos de fundo de furo.","tr":"Temmuz sondajından açıklanan delik 26SCM237’de altın ve gümüş de raporlandı; bildirilen uzunluklar kuyu içi ölçümleridir."},"label":{"ar":"26SCM237: فترة داخل البئر بطول 44.7 م بعيار 2.12% نحاس و1.16 غ/طن ذهب و10.7 غ/طن فضة.","de":"26SCM237: 44,7 m Bohrlochintervall mit 2,12 % Cu, 1,16 g/t Au und 10,7 g/t Ag.","en":"26SCM237: 44.7 m downhole interval grading 2.12% Cu, 1.16 g/t Au and 10.7 g/t Ag.","es":"26SCM237: intervalo de fondo de pozo de 44,7 m con 2,12 % Cu, 1,16 g/t Au y 10,7 g/t Ag.","fr":"26SCM237 : interval en fond de trou de 44,7 m à 2,12 % Cu, 1,16 g/t Au et 10,7 g/t Ag.","pt":"26SCM237: intervalo de fundo de furo de 44,7 m com 2,12% Cu, 1,16 g/t Au e 10,7 g/t Ag.","tr":"26SCM237: 44,7 m kuyu içi aralıkta %2,12 Cu, 1,16 g/t Au ve 10,7 g/t Ag."},"status":"occurred"}],"methodology":{"ar":"ملخص للحدث الوارد في الإعلان الأصلي مع الحفاظ على القياسات والقيود المذكورة فيه.","de":"Zusammenfassung der Primärmitteilung; die dort genannten Maße und Einschränkungen bleiben erhalten.","en":"Summary of the event reported in the primary announcement; source-provided measures and qualifications are retained.","es":"Resumen del hecho comunicado en la fuente primaria; se conservan sus medidas y salvedades.","fr":"Résumé de l’événement annoncé dans la source primaire ; les mesures et réserves de la source sont conservées.","pt":"Resumo do fato comunicado na fonte primária; medidas e ressalvas da fonte são mantidas.","tr":"Birincil duyuruda bildirilen olayın özeti; kaynak tarafından verilen ölçü ve nitelemeler korunmuştur."},"sourceUrls":["https://www.newsfilecorp.com/release/319123"],"title":{"ar":"26SCM237: فترة داخل البئر بطول 44.7 م بعيار 2.12% نحاس و1.16 غ/طن ذهب و10.7 غ/طن فضة.","de":"26SCM237: 44,7 m Bohrlochintervall mit 2,12 % Cu, 1,16 g/t Au und 10,7 g/t Ag.","en":"26SCM237: 44.7 m downhole interval grading 2.12% Cu, 1.16 g/t Au and 10.7 g/t Ag.","es":"26SCM237: intervalo de fondo de pozo de 44,7 m con 2,12 % Cu, 1,16 g/t Au y 10,7 g/t Ag.","fr":"26SCM237 : interval en fond de trou de 44,7 m à 2,12 % Cu, 1,16 g/t Au et 10,7 g/t Ag.","pt":"26SCM237: intervalo de fundo de furo de 44,7 m com 2,12% Cu, 1,16 g/t Au e 10,7 g/t Ag.","tr":"26SCM237: 44,7 m kuyu içi aralıkta %2,12 Cu, 1,16 g/t Au ve 10,7 g/t Ag."},"type":"events","updatedAt":"2026-10-15T16:35:12Z"},{"columns":[{"key":"hole","label":{"ar":"ثقب الحفر","de":"Bohrloch","en":"Drill hole","es":"Sondeo","fr":"Trou de forage","pt":"Furo de sondagem","tr":"Sondaj deliği"},"language":"en","type":"text"},{"key":"interval_length","label":{"ar":"الفاصل داخل البئر (م)","de":"Bohrlochintervall (m)","en":"Downhole interval (m)","es":"Intervalo en fondo de pozo (m)","fr":"Intervalle en fond de trou (m)","pt":"Intervalo no fundo do furo (m)","tr":"Kuyu içi aralık (m)"},"type":"number","unit":"metres"},{"key":"copper_grade","label":{"ar":"عيار النحاس (%)","de":"Kupfergehalt (%)","en":"Copper grade (%)","es":"Ley de cobre (%)","fr":"Teneur en cuivre (%)","pt":"Teor de cobre (%)","tr":"Bakır tenörü (%)"},"type":"number","unit":"percent"},{"key":"gold_grade","label":{"ar":"عيار الذهب (غ/طن)","de":"Goldgehalt (g/t)","en":"Gold grade (g/t)","es":"Ley de oro (g/t)","fr":"Teneur en or (g/t)","pt":"Teor de ouro (g/t)","tr":"Altın tenörü (g/t)"},"type":"number","unit":"g/t"},{"key":"silver_grade","label":{"ar":"عيار الفضة (غ/طن)","de":"Silbergehalt (g/t)","en":"Silver grade (g/t)","es":"Ley de plata (g/t)","fr":"Teneur en argent (g/t)","pt":"Teor de prata (g/t)","tr":"Gümüş tenörü (g/t)"},"type":"number","unit":"g/t"}],"description":{"ar":"الفاصل داخل البئر وقيم المعادن التي أعلنتها الشركة لثقب حُفر في يوليو 2026.","de":"Vom Unternehmen gemeldetes Bohrlochintervall und Metallgehalte aus einer Bohrung vom Juli 2026.","en":"Company-reported downhole interval and metal values for a hole drilled in July 2026.","es":"Intervalo de fondo de pozo y valores metálicos comunicados para un sondeo perforado en julio de 2026.","fr":"Intervalle en fond de trou et valeurs métalliques déclarés par la société pour un trou foré en juillet 2026.","pt":"Intervalo no fundo do furo e valores metálicos divulgados pela empresa para furo perfurado em julho de 2026.","tr":"Temmuz 2026’da açılan delik için şirketin açıkladığı kuyu içi aralık ve metal değerleri."},"id":"minto-north-hole-26scm237","methodology":{"ar":"هذه أطوال وعيارات داخل البئر أعلنتها الشركة وليست سماكات حقيقية. وقدرت الشركة السماكة الحقيقية بنحو 80–90% من طول اللباب. لم يُحسب مكافئ معدني هنا.","de":"Dies sind vom Unternehmen gemeldete Bohrlochlänge und Gehalte, keine wahren Mächtigkeiten. Das Unternehmen schätzte die wahre Mächtigkeit auf etwa 80–90 % der Kernlänge. Es wird kein Metalläquivalent berechnet.","en":"These are company-reported downhole length and grades, not true widths. The company estimated true width at approximately 80–90% of core length. No metal equivalent is calculated here.","es":"Son longitud de fondo de pozo y leyes comunicadas por la empresa, no espesores verdaderos. La empresa estimó el espesor verdadero en aproximadamente 80–90 % de la longitud del testigo. No se calcula equivalente metálico.","fr":"Il s’agit de longueur en fond de trou et de teneurs déclarées par la société, pas d’épaisseurs vraies. Celle-ci estime l’épaisseur vraie à environ 80–90 % de la longueur de carotte. Aucun équivalent métallique n’est calculé.","pt":"São comprimento no fundo do furo e teores informados pela empresa, não espessuras verdadeiras. A empresa estimou a espessura verdadeira em cerca de 80–90% do comprimento do testemunho. Nenhum equivalente metálico é calculado.","tr":"Bunlar şirketçe raporlanan kuyu içi uzunluk ve tenörlerdir; gerçek genişlik değildir. Şirket, gerçek genişliği karot uzunluğunun yaklaşık %80–90’ı olarak tahmin etmiştir. Metal eşdeğeri hesaplanmamıştır."},"rowTranslations":[{"hole":{"ar":"26SCM237","de":"26SCM237","en":"26SCM237","es":"26SCM237","fr":"26SCM237","pt":"26SCM237","tr":"26SCM237"}}],"rows":[{"copper_grade":2.12,"gold_grade":1.16,"hole":"26SCM237","interval_length":44.7,"silver_grade":10.7}],"sourceUrls":["https://www.newsfilecorp.com/release/319123"],"title":{"ar":"تقاطع الحفر 26SCM237 في مينتو نورث","de":"Bohrabschnitt 26SCM237 bei Minto North","en":"Minto North hole 26SCM237 intercept","es":"Intersección del sondeo 26SCM237 en Minto North","fr":"Intersection du trou 26SCM237 à Minto North","pt":"Interceptação do furo 26SCM237 em Minto North","tr":"Minto North 26SCM237 sondaj kesişimi"},"type":"table","updatedAt":"2026-10-15T16:44:08Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026/data/reported-announcement?lang=tr&format=csv","json":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026/data/reported-announcement?lang=tr&format=json"},"id":"reported-announcement"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026/data/minto-north-hole-26scm237?lang=tr&format=csv","json":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026/data/minto-north-hole-26scm237?lang=tr&format=json"},"id":"minto-north-hole-26scm237"}],"data_types":["events","table"],"editorial_illustration":{"alt":"Küresel ekonomi ve ticaret bağlantılarının kavramsal illüstrasyonu.","asset_id":"newsverum-v1-economy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"tr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-1536.webp","width":1536}],"width":1536},"event_id":"event-0e0011a0-4a75-5f55-8bef-b4a5be3d61c8","event_period":"2026-10-15","event_period_basis":"event-or-reference-period","id":"selkirk-minto-north-drill-results-october-2026","image":null,"importance":0.6,"language":"tr","modified_at":"2026-10-15T16:53:09+00:00","publication_basis":"publication-record","published_at":"2026-10-15T16:53:09+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Küresel ekonomi ve ticaret bağlantılarının kavramsal illüstrasyonu.","asset_id":"newsverum-v1-economy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"tr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/economy-1536.webp","width":1536}],"width":1536},"slug":"selkirk-minto-north-drill-results-october-2026","sources":[{"checkedAt":"2026-10-15","name":"Selkirk Copper Mines Inc. (company announcement)","publishedAt":"2026-10-15","url":"https://www.newsfilecorp.com/release/319123"}],"summary":"Temmuz sondajından açıklanan delik 26SCM237’de altın ve gümüş de raporlandı; bildirilen uzunluklar kuyu içi ölçümleridir.","text":"Temmuz sondajından açıklanan delik 26SCM237’de altın ve gümüş de raporlandı; bildirilen uzunluklar kuyu içi ölçümleridir.\n\nSelkirk Copper, Minto bakır-altın-gümüş projesindeki Faz 2 programının Temmuz 2026’da açılan deliklerine ait yeni sonuçları yayımladı. Şirket, Minto North’taki 26SCM237 deliğinde 44,7 metre boyunca %2,12 bakır, ton başına 1,16 gram altın ve 10,7 gram gümüş bildirdi; aralık kuyu içi uzunluktur.\n\nDuyuru, aynı delikte 11,1 metre ve 9,2 metrelik iç aralıklar ile başka bölgelerdeki sonuçları da listeliyor. Şirket, Faz 2’de 14 Ekim’e kadar 223 delikte 54.711 metre sondaj yapıldığını söyledi. Gerçek genişlikler şirketçe karot uzunluğunun yaklaşık %80–90’ı olarak tahmin edildi; sondaj kesişimleri tek başına kaynak artışı veya ekonomik çıkarılabilirlik kanıtı değildir.","title":"Selkirk Copper, Minto North’ta 44,7 metrede %2,12 bakır sondaj sonucu bildirdi","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/selkirk-minto-north-drill-results-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/selkirk-minto-north-drill-results-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/selkirk-minto-north-drill-results-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/selkirk-minto-north-drill-results-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/selkirk-minto-north-drill-results-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/selkirk-minto-north-drill-results-october-2026"},{"api_url":"https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/selkirk-minto-north-drill-results-october-2026"}],"url":"https://newsverum.com/tr/news/selkirk-minto-north-drill-results-october-2026"},"version":"1"}
