{"article":{"annotation":{"article_id":"saudi-road-bridge-expansion-joint-maintenance-progress-2026","available_at":"2026-10-20T14:21:30.413051Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"7c92d9b9856fe9533600858ae696760fe768f7060a9153a434d5750a22f53c89","input_sha256":"c89efa62de63e2a0d5138ddae9eab3090e729288dd5a9ba34c0eb08a0c916919","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"SA","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.spa.gov.sa/en/N2705391"]}],"geometry":null,"id":"iso3166-1:SA","kind":"country-or-area","labels":{"ar":"المملكة العربية السعودية","en":"Saudi Arabia","es":"Arabia Saudita","fr":"Arabie saoudite"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.spa.gov.sa/en/N2705391"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=es","category":"infrastructure","content":{"key_points":[],"paragraphs":["La Autoridad General de Carreteras de Arabia Saudí (RGA) informó que las obras de juntas de dilatación de su programa de mantenimiento vial de 2026 habían alcanzado el 86,2% de ejecución en 22 proyectos de varias regiones. Se habían realizado más de 6.500 metros lineales de trabajos en juntas de puentes.","La RGA indicó que las juntas de asfalto estaban completadas al 99,5% y las juntas mecánicas con movimiento de 100 a 200 mm, al 100%. Las de 50 a 100 mm alcanzaban el 87,2%; las inferiores a 50 mm superaban el 20%, con 938 metros aún en obras. La autoridad prevé completar los trabajos previstos antes de fin de año."],"sections":[]},"corrections":[],"country":"SA","data":{"blocks":[{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"metres"},{"key":"unit","label":{"ar":"الوحدة","de":"Einheit","en":"Unit","es":"Unidad","fr":"Unité","pt":"Unidade","tr":"Birim"},"language":"en","type":"text"}],"description":{"ar":"نسب الإنجاز وحجم الأعمال المعلنة في 22 مشروعاً لصيانة فواصل الجسور في مناطق عدة بالمملكة.","de":"Gemeldete Fertigstellungsstände und Arbeitsmengen in 22 Brückenfugenprojekten in mehreren saudischen Regionen.","en":"Reported completion rates and work volume in 22 bridge-joint maintenance projects across several Saudi regions.","es":"Porcentajes de avance y volumen de obras comunicados en 22 proyectos de juntas de puentes en varias regiones saudíes.","fr":"Taux d’achèvement et volume de travaux publiés pour 22 projets de joints de ponts dans plusieurs régions saoudiennes.","pt":"Taxas de conclusão e volume de trabalho informados em 22 projetos de juntas de pontes em várias regiões sauditas.","tr":"Suudi Arabistan’ın birkaç bölgesindeki 22 köprü derz bakım projesi için bildirilen ilerleme oranları ve iş miktarları."},"id":"rga-road-joint-maintenance-progress-2026-1","methodology":{"ar":"يقتصر الجدول على برنامج الهيئة لعام 2026 المعلن في مناطق عدة، ولا يمثل إجمالي شبكة الطرق الوطنية. نُقلت النسب والأمتار المتبقية عن الإعلان.","de":"Die Tabelle bezieht sich auf das von der RGA gemeldete Programm 2026 in mehreren Regionen, nicht auf das gesamte nationale Straßennetz. Prozentwerte und verbleibende Meter stammen aus der Mitteilung.","en":"The table covers the RGA’s reported 2026 programme across several regions, not the entire national road network. Percentages and remaining metres are transcribed from the release.","es":"La tabla se limita al programa 2026 comunicado por la RGA en varias regiones y no representa toda la red vial nacional. Los porcentajes y metros pendientes se transcriben del comunicado.","fr":"Le tableau porte sur le programme 2026 annoncé par la RGA dans plusieurs régions, et non sur l’ensemble du réseau routier national. Pourcentages et mètres restants sont repris du communiqué.","pt":"A tabela abrange o programa de 2026 informado pela RGA em várias regiões, não toda a rede rodoviária nacional. Percentuais e metros restantes foram transcritos do comunicado.","tr":"Tablo, RGA’nın birkaç bölgede yürüttüğünü bildirdiği 2026 programını kapsar; ulusal karayolu ağının tamamını temsil etmez. Yüzdeler ve kalan metre değerleri duyurudan aktarılmıştır."},"rowTranslations":[{"measure":{"ar":"أعمال الفواصل المنجزة (حد أدنى)","de":"Fertiggestellte Fugenarbeiten (Mindestwert)","en":"Joint work completed (lower bound)","es":"Trabajos de juntas ejecutados (mínimo)","fr":"Travaux de joints achevés (minimum)","pt":"Trabalhos de juntas concluídos (limite inferior)","tr":"Tamamlanan derz işi (alt sınır)"},"unit":{"ar":"متر طولي","de":"laufende Meter","en":"linear metres","es":"metros lineales","fr":"mètres linéaires","pt":"metros lineares","tr":"metre"}},{"measure":{"ar":"الفواصل الأقل من 50 ملم قيد الإنشاء","de":"Fugen unter 50 mm noch im Bau","en":"Under-50 mm joints still under construction","es":"Juntas inferiores a 50 mm aún en obras","fr":"Joints de moins de 50 mm encore en chantier","pt":"Juntas com menos de 50 mm ainda em obras","tr":"50 mm’den kısa derzlerde yapımı süren uzunluk"},"unit":{"ar":"متر","de":"Meter","en":"metres","es":"metros","fr":"mètres","pt":"metros","tr":"metre"}}],"rows":[{"measure":"Joint work completed (lower bound)","unit":"linear metres","value":6500.0},{"measure":"Under-50 mm joints still under construction","unit":"metres","value":938.0}],"sourceUrls":["https://www.spa.gov.sa/en/N2705391"],"title":{"ar":"الطول (م)","de":"Länge (m)","en":"Length (m)","es":"Longitud (m)","fr":"Longueur (m)","pt":"Comprimento (m)","tr":"Uzunluk (m)"},"type":"table","updatedAt":"2026-10-20T14:09:55Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"percent"},{"key":"unit","label":{"ar":"الوحدة","de":"Einheit","en":"Unit","es":"Unidad","fr":"Unité","pt":"Unidade","tr":"Birim"},"language":"en","type":"text"}],"description":{"ar":"نسب الإنجاز وحجم الأعمال المعلنة في 22 مشروعاً لصيانة فواصل الجسور في مناطق عدة بالمملكة.","de":"Gemeldete Fertigstellungsstände und Arbeitsmengen in 22 Brückenfugenprojekten in mehreren saudischen Regionen.","en":"Reported completion rates and work volume in 22 bridge-joint maintenance projects across several Saudi regions.","es":"Porcentajes de avance y volumen de obras comunicados en 22 proyectos de juntas de puentes en varias regiones saudíes.","fr":"Taux d’achèvement et volume de travaux publiés pour 22 projets de joints de ponts dans plusieurs régions saoudiennes.","pt":"Taxas de conclusão e volume de trabalho informados em 22 projetos de juntas de pontes em várias regiões sauditas.","tr":"Suudi Arabistan’ın birkaç bölgesindeki 22 köprü derz bakım projesi için bildirilen ilerleme oranları ve iş miktarları."},"id":"rga-road-joint-maintenance-progress-2026-2","methodology":{"ar":"يقتصر الجدول على برنامج الهيئة لعام 2026 المعلن في مناطق عدة، ولا يمثل إجمالي شبكة الطرق الوطنية. نُقلت النسب والأمتار المتبقية عن الإعلان.","de":"Die Tabelle bezieht sich auf das von der RGA gemeldete Programm 2026 in mehreren Regionen, nicht auf das gesamte nationale Straßennetz. Prozentwerte und verbleibende Meter stammen aus der Mitteilung.","en":"The table covers the RGA’s reported 2026 programme across several regions, not the entire national road network. Percentages and remaining metres are transcribed from the release.","es":"La tabla se limita al programa 2026 comunicado por la RGA en varias regiones y no representa toda la red vial nacional. Los porcentajes y metros pendientes se transcriben del comunicado.","fr":"Le tableau porte sur le programme 2026 annoncé par la RGA dans plusieurs régions, et non sur l’ensemble du réseau routier national. Pourcentages et mètres restants sont repris du communiqué.","pt":"A tabela abrange o programa de 2026 informado pela RGA em várias regiões, não toda a rede rodoviária nacional. Percentuais e metros restantes foram transcritos do comunicado.","tr":"Tablo, RGA’nın birkaç bölgede yürüttüğünü bildirdiği 2026 programını kapsar; ulusal karayolu ağının tamamını temsil etmez. Yüzdeler ve kalan metre değerleri duyurudan aktarılmıştır."},"rowTranslations":[{"measure":{"ar":"نسبة الإنجاز الإجمالية","de":"Gesamtfortschritt","en":"Overall completion rate","es":"Avance general","fr":"Taux global d’achèvement","pt":"Conclusão geral","tr":"Genel tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل الإسفلتية","de":"Fertigstellung der Asphaltfugen","en":"Asphalt joint completion","es":"Ejecución de juntas de asfalto","fr":"Achèvement des joints d’asphalte","pt":"Conclusão das juntas asfálticas","tr":"Asfalt derz tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل ذات الحركة 100–200 ملم","de":"Fugen mit 100–200 mm Bewegungsbereich fertig","en":"100–200 mm movement joints completed","es":"Juntas de 100–200 mm completadas","fr":"Joints de 100–200 mm achevés","pt":"Juntas com movimento de 100–200 mm concluídas","tr":"100–200 mm hareket aralıklı derzlerin tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل ذات الحركة 50–100 ملم","de":"Fugen mit 50–100 mm Bewegungsbereich fertig","en":"50–100 mm movement joints completed","es":"Juntas de 50–100 mm completadas","fr":"Joints de 50–100 mm achevés","pt":"Juntas com movimento de 50–100 mm concluídas","tr":"50–100 mm hareket aralıklı derzlerin tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل الأقل من 50 ملم (حد أدنى)","de":"Fugen unter 50 mm fertig (Mindestwert)","en":"Under-50 mm movement joints completed (lower bound)","es":"Juntas inferiores a 50 mm completadas (mínimo)","fr":"Joints de moins de 50 mm achevés (minimum)","pt":"Juntas com menos de 50 mm concluídas (limite inferior)","tr":"50 mm’den kısa derzlerin tamamlanma oranı (alt sınır)"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}}],"rows":[{"measure":"Overall completion rate","unit":"percent","value":86.2},{"measure":"Asphalt joint completion","unit":"percent","value":99.5},{"measure":"100–200 mm movement joints completed","unit":"percent","value":100.0},{"measure":"50–100 mm movement joints completed","unit":"percent","value":87.2},{"measure":"Under-50 mm movement joints completed (lower bound)","unit":"percent","value":20.0}],"sourceUrls":["https://www.spa.gov.sa/en/N2705391"],"title":{"ar":"نسب الإنجاز (%)","de":"Fertigstellungsraten (%)","en":"Completion rates (%)","es":"Porcentajes de ejecución (%)","fr":"Taux d’achèvement (%)","pt":"Taxas de conclusão (%)","tr":"Tamamlanma oranları (%)"},"type":"table","updatedAt":"2026-10-20T14:09:55Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"projects"},{"key":"unit","label":{"ar":"الوحدة","de":"Einheit","en":"Unit","es":"Unidad","fr":"Unité","pt":"Unidade","tr":"Birim"},"language":"en","type":"text"}],"description":{"ar":"نسب الإنجاز وحجم الأعمال المعلنة في 22 مشروعاً لصيانة فواصل الجسور في مناطق عدة بالمملكة.","de":"Gemeldete Fertigstellungsstände und Arbeitsmengen in 22 Brückenfugenprojekten in mehreren saudischen Regionen.","en":"Reported completion rates and work volume in 22 bridge-joint maintenance projects across several Saudi regions.","es":"Porcentajes de avance y volumen de obras comunicados en 22 proyectos de juntas de puentes en varias regiones saudíes.","fr":"Taux d’achèvement et volume de travaux publiés pour 22 projets de joints de ponts dans plusieurs régions saoudiennes.","pt":"Taxas de conclusão e volume de trabalho informados em 22 projetos de juntas de pontes em várias regiões sauditas.","tr":"Suudi Arabistan’ın birkaç bölgesindeki 22 köprü derz bakım projesi için bildirilen ilerleme oranları ve iş miktarları."},"id":"rga-road-joint-maintenance-progress-2026-3","methodology":{"ar":"يقتصر الجدول على برنامج الهيئة لعام 2026 المعلن في مناطق عدة، ولا يمثل إجمالي شبكة الطرق الوطنية. نُقلت النسب والأمتار المتبقية عن الإعلان.","de":"Die Tabelle bezieht sich auf das von der RGA gemeldete Programm 2026 in mehreren Regionen, nicht auf das gesamte nationale Straßennetz. Prozentwerte und verbleibende Meter stammen aus der Mitteilung.","en":"The table covers the RGA’s reported 2026 programme across several regions, not the entire national road network. Percentages and remaining metres are transcribed from the release.","es":"La tabla se limita al programa 2026 comunicado por la RGA en varias regiones y no representa toda la red vial nacional. Los porcentajes y metros pendientes se transcriben del comunicado.","fr":"Le tableau porte sur le programme 2026 annoncé par la RGA dans plusieurs régions, et non sur l’ensemble du réseau routier national. Pourcentages et mètres restants sont repris du communiqué.","pt":"A tabela abrange o programa de 2026 informado pela RGA em várias regiões, não toda a rede rodoviária nacional. Percentuais e metros restantes foram transcritos do comunicado.","tr":"Tablo, RGA’nın birkaç bölgede yürüttüğünü bildirdiği 2026 programını kapsar; ulusal karayolu ağının tamamını temsil etmez. Yüzdeler ve kalan metre değerleri duyurudan aktarılmıştır."},"rowTranslations":[{"measure":{"ar":"عدد المشاريع المشمولة","de":"Erfasste Projekte","en":"Projects covered","es":"Proyectos incluidos","fr":"Projets concernés","pt":"Projetos abrangidos","tr":"Kapsamdaki proje sayısı"},"unit":{"ar":"مشروعاً","de":"Projekte","en":"projects","es":"proyectos","fr":"projets","pt":"projetos","tr":"proje"}}],"rows":[{"measure":"Projects covered","unit":"projects","value":22.0}],"sourceUrls":["https://www.spa.gov.sa/en/N2705391"],"title":{"ar":"عدد المشاريع","de":"Projektzahl","en":"Number of projects","es":"Número de proyectos","fr":"Nombre de projets","pt":"Número de projetos","tr":"Proje sayısı"},"type":"table","updatedAt":"2026-10-20T14:09:55Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-1?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-1?lang=es&format=json"},"id":"rga-road-joint-maintenance-progress-2026-1"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-2?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-2?lang=es&format=json"},"id":"rga-road-joint-maintenance-progress-2026-2"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-3?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-3?lang=es&format=json"},"id":"rga-road-joint-maintenance-progress-2026-3"}],"data_types":["table"],"editorial_illustration":{"alt":"Ilustración conceptual de transporte, puentes y conexiones de infraestructura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-23b45cc9-cff2-506a-b5a7-2f48cfc253e7","event_period":"2026-10-19","event_period_basis":"event-or-reference-period","id":"saudi-road-bridge-expansion-joint-maintenance-progress-2026","image":null,"importance":0.6,"language":"es","modified_at":"2026-10-20T14:20:11+00:00","publication_basis":"publication-record","published_at":"2026-10-20T14:20:11+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Ilustración conceptual de transporte, puentes y conexiones de infraestructura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"saudi-road-bridge-expansion-joint-maintenance-progress-2026","sources":[{"checkedAt":"2026-10-20","name":"Saudi Press Agency","publishedAt":"2026-10-19","url":"https://www.spa.gov.sa/en/N2705391"}],"summary":"La autoridad de carreteras informó de más de 6.500 metros lineales de trabajos.","text":"La autoridad de carreteras informó de más de 6.500 metros lineales de trabajos.\n\nLa Autoridad General de Carreteras de Arabia Saudí (RGA) informó que las obras de juntas de dilatación de su programa de mantenimiento vial de 2026 habían alcanzado el 86,2% de ejecución en 22 proyectos de varias regiones. Se habían realizado más de 6.500 metros lineales de trabajos en juntas de puentes.\n\nLa RGA indicó que las juntas de asfalto estaban completadas al 99,5% y las juntas mecánicas con movimiento de 100 a 200 mm, al 100%. Las de 50 a 100 mm alcanzaban el 87,2%; las inferiores a 50 mm superaban el 20%, con 938 metros aún en obras. La autoridad prevé completar los trabajos previstos antes de fin de año.","title":"Las obras de juntas de puentes alcanzan el 86,2% en 22 proyectos viales saudíes","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"}],"url":"https://newsverum.com/es/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},"version":"1"}
