{"article":{"annotation":{"article_id":"saudi-road-bridge-expansion-joint-maintenance-progress-2026","available_at":"2026-10-20T14:21:30.413051Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"7c92d9b9856fe9533600858ae696760fe768f7060a9153a434d5750a22f53c89","input_sha256":"c89efa62de63e2a0d5138ddae9eab3090e729288dd5a9ba34c0eb08a0c916919","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"SA","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.spa.gov.sa/en/N2705391"]}],"geometry":null,"id":"iso3166-1:SA","kind":"country-or-area","labels":{"ar":"المملكة العربية السعودية","en":"Saudi Arabia","es":"Arabia Saudita","fr":"Arabie saoudite"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.spa.gov.sa/en/N2705391"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=en","category":"infrastructure","content":{"key_points":[],"paragraphs":["Saudi Arabia’s Roads General Authority (RGA) reported that expansion-joint work under its 2026 road-maintenance programme had reached 86.2% completion across 22 projects in several regions. More than 6,500 linear metres of bridge-joint work had been completed.","The RGA said asphalt-joint works were 99.5% complete and mechanical joints with 100–200 mm movement ranges were complete. Mechanical joints with 50–100 mm ranges had reached 87.2%; those below 50 mm were more than 20% complete, with 938 metres still under construction. The authority said the targeted works were expected to finish by year-end."],"sections":[]},"corrections":[],"country":"SA","data":{"blocks":[{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"metres"},{"key":"unit","label":{"ar":"الوحدة","de":"Einheit","en":"Unit","es":"Unidad","fr":"Unité","pt":"Unidade","tr":"Birim"},"language":"en","type":"text"}],"description":{"ar":"نسب الإنجاز وحجم الأعمال المعلنة في 22 مشروعاً لصيانة فواصل الجسور في مناطق عدة بالمملكة.","de":"Gemeldete Fertigstellungsstände und Arbeitsmengen in 22 Brückenfugenprojekten in mehreren saudischen Regionen.","en":"Reported completion rates and work volume in 22 bridge-joint maintenance projects across several Saudi regions.","es":"Porcentajes de avance y volumen de obras comunicados en 22 proyectos de juntas de puentes en varias regiones saudíes.","fr":"Taux d’achèvement et volume de travaux publiés pour 22 projets de joints de ponts dans plusieurs régions saoudiennes.","pt":"Taxas de conclusão e volume de trabalho informados em 22 projetos de juntas de pontes em várias regiões sauditas.","tr":"Suudi Arabistan’ın birkaç bölgesindeki 22 köprü derz bakım projesi için bildirilen ilerleme oranları ve iş miktarları."},"id":"rga-road-joint-maintenance-progress-2026-1","methodology":{"ar":"يقتصر الجدول على برنامج الهيئة لعام 2026 المعلن في مناطق عدة، ولا يمثل إجمالي شبكة الطرق الوطنية. نُقلت النسب والأمتار المتبقية عن الإعلان.","de":"Die Tabelle bezieht sich auf das von der RGA gemeldete Programm 2026 in mehreren Regionen, nicht auf das gesamte nationale Straßennetz. Prozentwerte und verbleibende Meter stammen aus der Mitteilung.","en":"The table covers the RGA’s reported 2026 programme across several regions, not the entire national road network. Percentages and remaining metres are transcribed from the release.","es":"La tabla se limita al programa 2026 comunicado por la RGA en varias regiones y no representa toda la red vial nacional. Los porcentajes y metros pendientes se transcriben del comunicado.","fr":"Le tableau porte sur le programme 2026 annoncé par la RGA dans plusieurs régions, et non sur l’ensemble du réseau routier national. Pourcentages et mètres restants sont repris du communiqué.","pt":"A tabela abrange o programa de 2026 informado pela RGA em várias regiões, não toda a rede rodoviária nacional. Percentuais e metros restantes foram transcritos do comunicado.","tr":"Tablo, RGA’nın birkaç bölgede yürüttüğünü bildirdiği 2026 programını kapsar; ulusal karayolu ağının tamamını temsil etmez. Yüzdeler ve kalan metre değerleri duyurudan aktarılmıştır."},"rowTranslations":[{"measure":{"ar":"أعمال الفواصل المنجزة (حد أدنى)","de":"Fertiggestellte Fugenarbeiten (Mindestwert)","en":"Joint work completed (lower bound)","es":"Trabajos de juntas ejecutados (mínimo)","fr":"Travaux de joints achevés (minimum)","pt":"Trabalhos de juntas concluídos (limite inferior)","tr":"Tamamlanan derz işi (alt sınır)"},"unit":{"ar":"متر طولي","de":"laufende Meter","en":"linear metres","es":"metros lineales","fr":"mètres linéaires","pt":"metros lineares","tr":"metre"}},{"measure":{"ar":"الفواصل الأقل من 50 ملم قيد الإنشاء","de":"Fugen unter 50 mm noch im Bau","en":"Under-50 mm joints still under construction","es":"Juntas inferiores a 50 mm aún en obras","fr":"Joints de moins de 50 mm encore en chantier","pt":"Juntas com menos de 50 mm ainda em obras","tr":"50 mm’den kısa derzlerde yapımı süren uzunluk"},"unit":{"ar":"متر","de":"Meter","en":"metres","es":"metros","fr":"mètres","pt":"metros","tr":"metre"}}],"rows":[{"measure":"Joint work completed (lower bound)","unit":"linear metres","value":6500.0},{"measure":"Under-50 mm joints still under construction","unit":"metres","value":938.0}],"sourceUrls":["https://www.spa.gov.sa/en/N2705391"],"title":{"ar":"الطول (م)","de":"Länge (m)","en":"Length (m)","es":"Longitud (m)","fr":"Longueur (m)","pt":"Comprimento (m)","tr":"Uzunluk (m)"},"type":"table","updatedAt":"2026-10-20T14:09:55Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"percent"},{"key":"unit","label":{"ar":"الوحدة","de":"Einheit","en":"Unit","es":"Unidad","fr":"Unité","pt":"Unidade","tr":"Birim"},"language":"en","type":"text"}],"description":{"ar":"نسب الإنجاز وحجم الأعمال المعلنة في 22 مشروعاً لصيانة فواصل الجسور في مناطق عدة بالمملكة.","de":"Gemeldete Fertigstellungsstände und Arbeitsmengen in 22 Brückenfugenprojekten in mehreren saudischen Regionen.","en":"Reported completion rates and work volume in 22 bridge-joint maintenance projects across several Saudi regions.","es":"Porcentajes de avance y volumen de obras comunicados en 22 proyectos de juntas de puentes en varias regiones saudíes.","fr":"Taux d’achèvement et volume de travaux publiés pour 22 projets de joints de ponts dans plusieurs régions saoudiennes.","pt":"Taxas de conclusão e volume de trabalho informados em 22 projetos de juntas de pontes em várias regiões sauditas.","tr":"Suudi Arabistan’ın birkaç bölgesindeki 22 köprü derz bakım projesi için bildirilen ilerleme oranları ve iş miktarları."},"id":"rga-road-joint-maintenance-progress-2026-2","methodology":{"ar":"يقتصر الجدول على برنامج الهيئة لعام 2026 المعلن في مناطق عدة، ولا يمثل إجمالي شبكة الطرق الوطنية. نُقلت النسب والأمتار المتبقية عن الإعلان.","de":"Die Tabelle bezieht sich auf das von der RGA gemeldete Programm 2026 in mehreren Regionen, nicht auf das gesamte nationale Straßennetz. Prozentwerte und verbleibende Meter stammen aus der Mitteilung.","en":"The table covers the RGA’s reported 2026 programme across several regions, not the entire national road network. Percentages and remaining metres are transcribed from the release.","es":"La tabla se limita al programa 2026 comunicado por la RGA en varias regiones y no representa toda la red vial nacional. Los porcentajes y metros pendientes se transcriben del comunicado.","fr":"Le tableau porte sur le programme 2026 annoncé par la RGA dans plusieurs régions, et non sur l’ensemble du réseau routier national. Pourcentages et mètres restants sont repris du communiqué.","pt":"A tabela abrange o programa de 2026 informado pela RGA em várias regiões, não toda a rede rodoviária nacional. Percentuais e metros restantes foram transcritos do comunicado.","tr":"Tablo, RGA’nın birkaç bölgede yürüttüğünü bildirdiği 2026 programını kapsar; ulusal karayolu ağının tamamını temsil etmez. Yüzdeler ve kalan metre değerleri duyurudan aktarılmıştır."},"rowTranslations":[{"measure":{"ar":"نسبة الإنجاز الإجمالية","de":"Gesamtfortschritt","en":"Overall completion rate","es":"Avance general","fr":"Taux global d’achèvement","pt":"Conclusão geral","tr":"Genel tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل الإسفلتية","de":"Fertigstellung der Asphaltfugen","en":"Asphalt joint completion","es":"Ejecución de juntas de asfalto","fr":"Achèvement des joints d’asphalte","pt":"Conclusão das juntas asfálticas","tr":"Asfalt derz tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل ذات الحركة 100–200 ملم","de":"Fugen mit 100–200 mm Bewegungsbereich fertig","en":"100–200 mm movement joints completed","es":"Juntas de 100–200 mm completadas","fr":"Joints de 100–200 mm achevés","pt":"Juntas com movimento de 100–200 mm concluídas","tr":"100–200 mm hareket aralıklı derzlerin tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل ذات الحركة 50–100 ملم","de":"Fugen mit 50–100 mm Bewegungsbereich fertig","en":"50–100 mm movement joints completed","es":"Juntas de 50–100 mm completadas","fr":"Joints de 50–100 mm achevés","pt":"Juntas com movimento de 50–100 mm concluídas","tr":"50–100 mm hareket aralıklı derzlerin tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل الأقل من 50 ملم (حد أدنى)","de":"Fugen unter 50 mm fertig (Mindestwert)","en":"Under-50 mm movement joints completed (lower bound)","es":"Juntas inferiores a 50 mm completadas (mínimo)","fr":"Joints de moins de 50 mm achevés (minimum)","pt":"Juntas com menos de 50 mm concluídas (limite inferior)","tr":"50 mm’den kısa derzlerin tamamlanma oranı (alt sınır)"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}}],"rows":[{"measure":"Overall completion rate","unit":"percent","value":86.2},{"measure":"Asphalt joint completion","unit":"percent","value":99.5},{"measure":"100–200 mm movement joints completed","unit":"percent","value":100.0},{"measure":"50–100 mm movement joints completed","unit":"percent","value":87.2},{"measure":"Under-50 mm movement joints completed (lower bound)","unit":"percent","value":20.0}],"sourceUrls":["https://www.spa.gov.sa/en/N2705391"],"title":{"ar":"نسب الإنجاز (%)","de":"Fertigstellungsraten (%)","en":"Completion rates (%)","es":"Porcentajes de ejecución (%)","fr":"Taux d’achèvement (%)","pt":"Taxas de conclusão (%)","tr":"Tamamlanma oranları (%)"},"type":"table","updatedAt":"2026-10-20T14:09:55Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"projects"},{"key":"unit","label":{"ar":"الوحدة","de":"Einheit","en":"Unit","es":"Unidad","fr":"Unité","pt":"Unidade","tr":"Birim"},"language":"en","type":"text"}],"description":{"ar":"نسب الإنجاز وحجم الأعمال المعلنة في 22 مشروعاً لصيانة فواصل الجسور في مناطق عدة بالمملكة.","de":"Gemeldete Fertigstellungsstände und Arbeitsmengen in 22 Brückenfugenprojekten in mehreren saudischen Regionen.","en":"Reported completion rates and work volume in 22 bridge-joint maintenance projects across several Saudi regions.","es":"Porcentajes de avance y volumen de obras comunicados en 22 proyectos de juntas de puentes en varias regiones saudíes.","fr":"Taux d’achèvement et volume de travaux publiés pour 22 projets de joints de ponts dans plusieurs régions saoudiennes.","pt":"Taxas de conclusão e volume de trabalho informados em 22 projetos de juntas de pontes em várias regiões sauditas.","tr":"Suudi Arabistan’ın birkaç bölgesindeki 22 köprü derz bakım projesi için bildirilen ilerleme oranları ve iş miktarları."},"id":"rga-road-joint-maintenance-progress-2026-3","methodology":{"ar":"يقتصر الجدول على برنامج الهيئة لعام 2026 المعلن في مناطق عدة، ولا يمثل إجمالي شبكة الطرق الوطنية. نُقلت النسب والأمتار المتبقية عن الإعلان.","de":"Die Tabelle bezieht sich auf das von der RGA gemeldete Programm 2026 in mehreren Regionen, nicht auf das gesamte nationale Straßennetz. Prozentwerte und verbleibende Meter stammen aus der Mitteilung.","en":"The table covers the RGA’s reported 2026 programme across several regions, not the entire national road network. Percentages and remaining metres are transcribed from the release.","es":"La tabla se limita al programa 2026 comunicado por la RGA en varias regiones y no representa toda la red vial nacional. Los porcentajes y metros pendientes se transcriben del comunicado.","fr":"Le tableau porte sur le programme 2026 annoncé par la RGA dans plusieurs régions, et non sur l’ensemble du réseau routier national. Pourcentages et mètres restants sont repris du communiqué.","pt":"A tabela abrange o programa de 2026 informado pela RGA em várias regiões, não toda a rede rodoviária nacional. Percentuais e metros restantes foram transcritos do comunicado.","tr":"Tablo, RGA’nın birkaç bölgede yürüttüğünü bildirdiği 2026 programını kapsar; ulusal karayolu ağının tamamını temsil etmez. Yüzdeler ve kalan metre değerleri duyurudan aktarılmıştır."},"rowTranslations":[{"measure":{"ar":"عدد المشاريع المشمولة","de":"Erfasste Projekte","en":"Projects covered","es":"Proyectos incluidos","fr":"Projets concernés","pt":"Projetos abrangidos","tr":"Kapsamdaki proje sayısı"},"unit":{"ar":"مشروعاً","de":"Projekte","en":"projects","es":"proyectos","fr":"projets","pt":"projetos","tr":"proje"}}],"rows":[{"measure":"Projects covered","unit":"projects","value":22.0}],"sourceUrls":["https://www.spa.gov.sa/en/N2705391"],"title":{"ar":"عدد المشاريع","de":"Projektzahl","en":"Number of projects","es":"Número de proyectos","fr":"Nombre de projets","pt":"Número de projetos","tr":"Proje sayısı"},"type":"table","updatedAt":"2026-10-20T14:09:55Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-1?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-1?lang=en&format=json"},"id":"rga-road-joint-maintenance-progress-2026-1"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-2?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-2?lang=en&format=json"},"id":"rga-road-joint-maintenance-progress-2026-2"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-3?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026/data/rga-road-joint-maintenance-progress-2026-3?lang=en&format=json"},"id":"rga-road-joint-maintenance-progress-2026-3"}],"data_types":["table"],"editorial_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-23b45cc9-cff2-506a-b5a7-2f48cfc253e7","event_period":"2026-10-19","event_period_basis":"event-or-reference-period","id":"saudi-road-bridge-expansion-joint-maintenance-progress-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-20T14:20:11+00:00","publication_basis":"publication-record","published_at":"2026-10-20T14:20:11+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"saudi-road-bridge-expansion-joint-maintenance-progress-2026","sources":[{"checkedAt":"2026-10-20","name":"Saudi Press Agency","publishedAt":"2026-10-19","url":"https://www.spa.gov.sa/en/N2705391"}],"summary":"The Roads General Authority said more than 6,500 metres of work had been carried out across 22 projects.","text":"The Roads General Authority said more than 6,500 metres of work had been carried out across 22 projects.\n\nSaudi Arabia’s Roads General Authority (RGA) reported that expansion-joint work under its 2026 road-maintenance programme had reached 86.2% completion across 22 projects in several regions. More than 6,500 linear metres of bridge-joint work had been completed.\n\nThe RGA said asphalt-joint works were 99.5% complete and mechanical joints with 100–200 mm movement ranges were complete. Mechanical joints with 50–100 mm ranges had reached 87.2%; those below 50 mm were more than 20% complete, with 938 metres still under construction. The authority said the targeted works were expected to finish by year-end.","title":"Saudi road programme reports 86.2% completion of bridge-joint works","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},{"api_url":"https://newsverum.com/api/v1/articles/saudi-road-bridge-expansion-joint-maintenance-progress-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"}],"url":"https://newsverum.com/en/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026"},"version":"1"}
