{"article_url":"https://newsverum.com/pt/news/saudi-road-bridge-expansion-joint-maintenance-progress-2026","block":{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"percent"},{"key":"unit","label":{"ar":"الوحدة","de":"Einheit","en":"Unit","es":"Unidad","fr":"Unité","pt":"Unidade","tr":"Birim"},"language":"en","type":"text"}],"description":{"ar":"نسب الإنجاز وحجم الأعمال المعلنة في 22 مشروعاً لصيانة فواصل الجسور في مناطق عدة بالمملكة.","de":"Gemeldete Fertigstellungsstände und Arbeitsmengen in 22 Brückenfugenprojekten in mehreren saudischen Regionen.","en":"Reported completion rates and work volume in 22 bridge-joint maintenance projects across several Saudi regions.","es":"Porcentajes de avance y volumen de obras comunicados en 22 proyectos de juntas de puentes en varias regiones saudíes.","fr":"Taux d’achèvement et volume de travaux publiés pour 22 projets de joints de ponts dans plusieurs régions saoudiennes.","pt":"Taxas de conclusão e volume de trabalho informados em 22 projetos de juntas de pontes em várias regiões sauditas.","tr":"Suudi Arabistan’ın birkaç bölgesindeki 22 köprü derz bakım projesi için bildirilen ilerleme oranları ve iş miktarları."},"id":"rga-road-joint-maintenance-progress-2026-2","methodology":{"ar":"يقتصر الجدول على برنامج الهيئة لعام 2026 المعلن في مناطق عدة، ولا يمثل إجمالي شبكة الطرق الوطنية. نُقلت النسب والأمتار المتبقية عن الإعلان.","de":"Die Tabelle bezieht sich auf das von der RGA gemeldete Programm 2026 in mehreren Regionen, nicht auf das gesamte nationale Straßennetz. Prozentwerte und verbleibende Meter stammen aus der Mitteilung.","en":"The table covers the RGA’s reported 2026 programme across several regions, not the entire national road network. Percentages and remaining metres are transcribed from the release.","es":"La tabla se limita al programa 2026 comunicado por la RGA en varias regiones y no representa toda la red vial nacional. Los porcentajes y metros pendientes se transcriben del comunicado.","fr":"Le tableau porte sur le programme 2026 annoncé par la RGA dans plusieurs régions, et non sur l’ensemble du réseau routier national. Pourcentages et mètres restants sont repris du communiqué.","pt":"A tabela abrange o programa de 2026 informado pela RGA em várias regiões, não toda a rede rodoviária nacional. Percentuais e metros restantes foram transcritos do comunicado.","tr":"Tablo, RGA’nın birkaç bölgede yürüttüğünü bildirdiği 2026 programını kapsar; ulusal karayolu ağının tamamını temsil etmez. Yüzdeler ve kalan metre değerleri duyurudan aktarılmıştır."},"rowTranslations":[{"measure":{"ar":"نسبة الإنجاز الإجمالية","de":"Gesamtfortschritt","en":"Overall completion rate","es":"Avance general","fr":"Taux global d’achèvement","pt":"Conclusão geral","tr":"Genel tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل الإسفلتية","de":"Fertigstellung der Asphaltfugen","en":"Asphalt joint completion","es":"Ejecución de juntas de asfalto","fr":"Achèvement des joints d’asphalte","pt":"Conclusão das juntas asfálticas","tr":"Asfalt derz tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل ذات الحركة 100–200 ملم","de":"Fugen mit 100–200 mm Bewegungsbereich fertig","en":"100–200 mm movement joints completed","es":"Juntas de 100–200 mm completadas","fr":"Joints de 100–200 mm achevés","pt":"Juntas com movimento de 100–200 mm concluídas","tr":"100–200 mm hareket aralıklı derzlerin tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل ذات الحركة 50–100 ملم","de":"Fugen mit 50–100 mm Bewegungsbereich fertig","en":"50–100 mm movement joints completed","es":"Juntas de 50–100 mm completadas","fr":"Joints de 50–100 mm achevés","pt":"Juntas com movimento de 50–100 mm concluídas","tr":"50–100 mm hareket aralıklı derzlerin tamamlanma oranı"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}},{"measure":{"ar":"إنجاز الفواصل الأقل من 50 ملم (حد أدنى)","de":"Fugen unter 50 mm fertig (Mindestwert)","en":"Under-50 mm movement joints completed (lower bound)","es":"Juntas inferiores a 50 mm completadas (mínimo)","fr":"Joints de moins de 50 mm achevés (minimum)","pt":"Juntas com menos de 50 mm concluídas (limite inferior)","tr":"50 mm’den kısa derzlerin tamamlanma oranı (alt sınır)"},"unit":{"ar":"%","de":"%","en":"percent","es":"%","fr":"%","pt":"%","tr":"yüzde"}}],"rows":[{"measure":"Overall completion rate","unit":"percent","value":86.2},{"measure":"Asphalt joint completion","unit":"percent","value":99.5},{"measure":"100–200 mm movement joints completed","unit":"percent","value":100.0},{"measure":"50–100 mm movement joints completed","unit":"percent","value":87.2},{"measure":"Under-50 mm movement joints completed (lower bound)","unit":"percent","value":20.0}],"sourceUrls":["https://www.spa.gov.sa/en/N2705391"],"title":{"ar":"نسب الإنجاز (%)","de":"Fertigstellungsraten (%)","en":"Completion rates (%)","es":"Porcentajes de ejecución (%)","fr":"Taux d’achèvement (%)","pt":"Taxas de conclusão (%)","tr":"Tamamlanma oranları (%)"},"type":"table","updatedAt":"2026-10-20T14:09:55Z"},"version":1}
