{"article":{"annotation":{"article_id":"san-servan-hybrid-battery-storage-public-review","available_at":"2026-10-20T23:02:31.472110Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"5565e8a78d451f634b94ce9673edc515d1633e563aa15885195ef7ea29fc16f9","input_sha256":"ca5b2ac0acb4ea44c58d38aff2173db2fbfe40d4ab68183b7f3375de3d64798c","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"ES","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34144"]}],"geometry":null,"id":"iso3166-1:ES","kind":"country-or-area","labels":{"ar":"إسبانيا","en":"Spain","es":"España","fr":"Espagne"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001209","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: solar","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34144"]}],"method":"controlled-rules-v1","rule_id":"solar-power","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review?lang=es","category":"energy","content":{"key_points":[],"paragraphs":["La solicitud describe un sistema de 40 MW nominales y 160 MWh de almacenamiento, con un presupuesto de 17.417.050 euros. Se pueden presentar alegaciones durante 15 días hábiles.","Es el trámite público de solicitudes de autorización previa y de construcción; no significa que se hayan concedido los permisos ni que la instalación esté construida."],"sections":[]},"corrections":[],"country":"ES","data":{"blocks":[{"columns":[{"key":"indicator","label":{"ar":"المؤشر","de":"Kennzahl","en":"Indicator","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"أيام","de":"Tage","en":"Days","es":"Días","fr":"Jours","pt":"Dias","tr":"Gün"},"type":"number","unit":"working days"}],"description":{"ar":"بيانات المشروع الواردة في المصدر الرسمي.","de":"Projektangabe aus der amtlichen Quelle.","en":"Project information stated in the official source.","es":"Dato del proyecto indicado en la fuente oficial.","fr":"Donnée du projet indiquée dans la source officielle.","pt":"Dado do projeto indicado na fonte oficial.","tr":"Resmî kaynakta açıklanan proje verisi."},"id":"release-statistic","methodology":{"ar":"تحدد الوثيقة المهلة بـ15 يوم عمل؛ ولم يُحسب تاريخ الإغلاق.","de":"Die Quelle nennt eine Frist von 15 Arbeitstagen; ein Enddatum wurde nicht berechnet.","en":"The source gives a 15-business-day period; no closing date has been calculated.","es":"La fuente fija un plazo de 15 días hábiles; no se calcula una fecha de cierre.","fr":"La source fixe un délai de 15 jours ouvrables; aucune date de clôture n’est calculée.","pt":"A fonte estabelece um prazo de 15 dias úteis; não foi calculada uma data de encerramento.","tr":"Kaynakta süre 15 iş günü olarak verilmiştir; kapanış tarihi ayrıca hesaplanmamıştır."},"rowTranslations":[{"indicator":{"ar":"مدة تقديم الملاحظات: 15 يوم عمل","de":"Frist zur Stellungnahme: 15 Arbeitstage","en":"Application review period: 15 business days","es":"Plazo de información: 15 días hábiles","fr":"Délai de consultation : 15 jours ouvrables","pt":"Prazo de consulta: 15 dias úteis","tr":"Başvuru değerlendirme süresi: 15 iş günü"}}],"rows":[{"indicator":"Application review period: 15 business days","value":15}],"sourceUrls":["https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34144"],"title":{"ar":"المصدر والمقياس","de":"Quelle und Messgröße","en":"Source and measure","es":"Fuente y medida","fr":"Source et mesure","pt":"Fonte e medida","tr":"Veri kaynağı ve ölçüm"},"type":"table","updatedAt":"2026-10-20T22:33:06Z"},{"columns":[{"key":"indicator","label":{"ar":"المقياس","de":"Messgröße","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"أيام","de":"Tage","en":"Days","es":"Días","fr":"Jours","pt":"Dias","tr":"Gün"},"type":"number","unit":"MW"}],"description":{"ar":"بيانات القدرة للمحطة القائمة ووحدة البطاريات المقترحة.","de":"Leistungswerte des bestehenden Kraftwerks und des geplanten Batteriemoduls.","en":"Power figures for the existing plant and proposed battery module.","es":"Potencias de la planta existente y del módulo de baterías propuesto.","fr":"Puissances de la centrale existante et du module de batteries proposé.","pt":"Potências da central existente e do módulo de baterias proposto.","tr":"Mevcut santral ve önerilen batarya modülünün güç değerleri."},"id":"storage-power","methodology":{"ar":"القيم منقولة من الطلب ولا تعني الموافقة أو التشغيل.","de":"Werte aus dem Antrag; sie belegen weder Genehmigung noch Inbetriebnahme.","en":"Figures transcribed from the application; they do not indicate approval or commissioning.","es":"Cifras transcritas de la solicitud; no indican aprobación ni puesta en servicio.","fr":"Valeurs reprises de la demande; elles ne signifient ni approbation ni mise en service.","pt":"Valores transcritos do pedido; não significam aprovação nem entrada em funcionamento.","tr":"Değerler başvuru metninden aktarılmıştır; proje onayı veya işletmeye alınma anlamına gelmez."},"rowTranslations":[{"indicator":{"ar":"قدرة المحطة الشمسية القائمة","de":"Leistung der bestehenden Solaranlage","en":"Existing solar plant power","es":"Potencia de la planta solar existente","fr":"Puissance de la centrale solaire existante","pt":"Potência da central solar existente","tr":"Mevcut güneş santralinin gücü"}},{"indicator":{"ar":"قدرة نظام البطاريات المقترح","de":"Leistung des geplanten Batteriesystems","en":"Proposed battery system power","es":"Potencia del sistema de baterías propuesto","fr":"Puissance du système de batteries proposé","pt":"Potência do sistema de baterias proposto","tr":"Önerilen batarya sisteminin gücü"}}],"rows":[{"indicator":"Existing solar plant power","value":43.2},{"indicator":"Proposed battery system power","value":40}],"sourceUrls":["https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34144"],"title":{"ar":"القدرة المركبة الواردة في الطلب","de":"Im Antrag angegebene installierte Leistung","en":"Installed capacity stated in application","es":"Potencia instalada indicada en la solicitud","fr":"Puissance installée indiquée dans la demande","pt":"Potência instalada indicada no pedido","tr":"Başvuruda belirtilen kurulu güç"},"type":"table","updatedAt":"2026-10-20T22:33:06Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review/data/release-statistic?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review/data/release-statistic?lang=es&format=json"},"id":"release-statistic"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review/data/storage-power?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review/data/storage-power?lang=es&format=json"},"id":"storage-power"}],"data_types":["table"],"editorial_illustration":{"alt":"Ilustración conceptual de generación eléctrica, almacenamiento y datos conectados.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-3058a8c3-0007-54b1-b37e-479787f8e553","event_period":"2026-10-20","event_period_basis":"event-or-reference-period","id":"san-servan-hybrid-battery-storage-public-review","image":null,"importance":0.6,"language":"es","modified_at":"2026-10-20T23:01:23+00:00","publication_basis":"publication-record","published_at":"2026-10-20T23:01:23+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Ilustración conceptual de generación eléctrica, almacenamiento y datos conectados.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"san-servan-hybrid-battery-storage-public-review","sources":[{"checkedAt":"2026-10-21","name":"Boletín Oficial del Estado (BOE)","publishedAt":"2026-10-20","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34144"}],"summary":"La Delegación del Gobierno en Extremadura sometió a información pública la solicitud de un sistema de baterías para hibridar la planta solar existente FV San Serván 2020, de 43,2 MW, en Mérida. El anuncio se publicó en el BOE el 20 de octubre.","text":"La Delegación del Gobierno en Extremadura sometió a información pública la solicitud de un sistema de baterías para hibridar la planta solar existente FV San Serván 2020, de 43,2 MW, en Mérida. El anuncio se publicó en el BOE el 20 de octubre.\n\nLa solicitud describe un sistema de 40 MW nominales y 160 MWh de almacenamiento, con un presupuesto de 17.417.050 euros. Se pueden presentar alegaciones durante 15 días hábiles.\n\nEs el trámite público de solicitudes de autorización previa y de construcción; no significa que se hayan concedido los permisos ni que la instalación esté construida.","title":"La propuesta de baterías de San Serván entra en información pública durante 15 días hábiles","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/san-servan-hybrid-battery-storage-public-review"},{"api_url":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review?lang=en","language":"en","url":"https://newsverum.com/en/news/san-servan-hybrid-battery-storage-public-review"},{"api_url":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/san-servan-hybrid-battery-storage-public-review"},{"api_url":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/san-servan-hybrid-battery-storage-public-review"},{"api_url":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review?lang=es","language":"es","url":"https://newsverum.com/es/news/san-servan-hybrid-battery-storage-public-review"},{"api_url":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review?lang=de","language":"de","url":"https://newsverum.com/de/news/san-servan-hybrid-battery-storage-public-review"},{"api_url":"https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/san-servan-hybrid-battery-storage-public-review"}],"url":"https://newsverum.com/es/news/san-servan-hybrid-battery-storage-public-review"},"version":"1"}
