{"article":{"annotation":{"article_id":"rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11","available_at":"2026-11-11T22:06:17.556393Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"6689c36610aa05a841e6c932ed36e38520c3f1b9eb80ae4c0c5fc944a471de2e","input_sha256":"99acde6c9ca55174a787323b44bc900971f63275c27a4de40d825b05d460381e","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001211","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: wind projects, offshore wind","source_urls":["https://www.rwe.com/en/press/rwe-ag/2026-11-11-rwe-and-kkr-join-forces-to-deliver-2-8-gw-of-new-offshore-wind-capacity-in-the-uk/","https://uk.rwe.com/press-and-news/2024-09-26-rwe-signs-contract-with-lamprell-to-supply-transition-pieces/","https://www.lamprell.com/lamprelltimes-q2-2026/lt2026q2-message-from-the-ceo/"]}],"method":"controlled-rules-v1","rule_id":"wind-power","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["RWE and investment firm KKR have reached financial close for the Vanguard West and Vanguard East offshore wind projects in the British North Sea, bringing a planned 2.8 gigawatts of generating capacity into a 50:50 partnership. The announcement on 11 November 2026 marks the completion of the financing and equity transactions, not the completion of either wind farm. RWE expects both projects to be fully commissioned in 2030.","The German energy group put the combined investment at around £12 billion, including the wind farms and associated transmission infrastructure. That is the company's estimate of project investment. It should not be added to the headline financing facilities as if they were an unrelated second construction budget: the financing and shareholders' equity are how the partners plan to support the same projects.","RWE said the non-recourse project financing consists of £11.1 billion in cash facilities and £1.7 billion in ancillary facilities from a consortium of 35 international banks. A facility is a financing commitment, not proof that the entire amount has already been drawn or spent. Ancillary facilities serve financing needs alongside cash lending and should not be treated automatically as the cash cost of building turbines. The company described the package as the largest such project financing in UK offshore wind, a characterization that has not been independently ranked here.","The package includes a £1 billion commitment from the UK's National Wealth Fund. RWE also identified credit cover from Germany's Euler Hermes and Denmark's EIFO. The fund's commitment is included within the financing described by the company, rather than an extra £1 billion to add on top. RWE said the arrangements were combined with equity commitments from the two owners, without specifying their individual cash contributions in the announcement.","KKR acquired a 50% equity stake in each project, completing a transaction announced in January. RWE retains the other half and will lead delivery for the joint venture. The distinction matters because financial close and ownership do not constitute an award of every construction package, nor do they demonstrate that the farms are generating electricity. Financing can enable a project to proceed while delivery remains subject to construction and operational risks.","Each wind farm has a planned capacity of 1.4 GW and would stand between 50 and 80 kilometres off the Norfolk coast. RWE said onshore cable work and substation construction were already well advanced. Offshore construction is expected to begin in early 2027, with the first foundation for Vanguard West planned in the first half of that year, followed by Vanguard East. Dates are schedules announced by the developer and can change.","Both projects received 20 year, inflation indexed Contracts for Difference in the UK's seventh allocation round in January 2026. The stated strike price was £91.20 per megawatt hour in 2024 prices. That reference is not a present household retail tariff: a Contract for Difference is a support mechanism linked to a reference electricity price, while household bills contain other costs. The announced strike price is indexed and cannot be compared directly with a later nominal price without adjustment.","RWE estimates that once operating, the two farms could produce electricity equivalent to the consumption of around three million UK homes. This is an illustrative generation comparison, not a count of homes already supplied or an assurance that every household receives power from these sites at all times. Actual output will depend on wind conditions, availability and other operating factors.","The new agreement also sits alongside earlier supply contracts. In September 2024 RWE said it had awarded Lamprell contracts to manufacture and transport 92 transition pieces for each project. Lamprell reported in its July 2026 company publication that fabrication for Vanguard West was progressing while preparations for Vanguard East continued. Those updates concern particular components, not the November financial close or a new overall EPC award.","The next observable milestones are the start of offshore work, foundation installation and eventual commissioning. Until then, capacity, household equivalents and completion dates remain plans or estimates, while the reported equity transaction and financing close are the decisions announced on 11 November."],"sections":[]},"corrections":[],"country":null,"data":{"blocks":[{"description":{"ar":"أعلنت آر دبليو إي الإغلاق المالي واكتمال شراكتها المتساوية مع كيه كيه آر في المشروعين.","de":"RWE meldete den Finanzierungsabschluss und den Vollzug der gleichberechtigten Partnerschaft mit KKR für beide Projekte.","en":"RWE announced financial close and completion of its equal partnership with KKR in both projects.","es":"RWE anunció el cierre financiero y la finalización de su asociación a partes iguales con KKR en ambos proyectos.","fr":"RWE a annoncé la clôture financière et la finalisation du partenariat à parts égales avec KKR pour les deux projets.","pt":"A RWE anunciou o fechamento financeiro e a conclusão da parceria igualitária com a KKR nos dois projetos.","tr":"RWE, iki projede finansal kapanışa ve KKR ile eşit ortaklığın tamamlanmasına ulaşıldığını duyurdu."},"id":"financial-close","items":[{"date":"2026-11-11","description":{"ar":"أعلنت آر دبليو إي الإغلاق المالي واكتمال شراكتها المتساوية مع كيه كيه آر في المشروعين.","de":"RWE meldete den Finanzierungsabschluss und den Vollzug der gleichberechtigten Partnerschaft mit KKR für beide Projekte.","en":"RWE announced financial close and completion of its equal partnership with KKR in both projects.","es":"RWE anunció el cierre financiero y la finalización de su asociación a partes iguales con KKR en ambos proyectos.","fr":"RWE a annoncé la clôture financière et la finalisation du partenariat à parts égales avec KKR pour les deux projets.","pt":"A RWE anunciou o fechamento financeiro e a conclusão da parceria igualitária com a KKR nos dois projetos.","tr":"RWE, iki projede finansal kapanışa ve KKR ile eşit ortaklığın tamamlanmasına ulaşıldığını duyurdu."},"label":{"ar":"الإغلاق المالي لمشروعي فانغارد","de":"Finanzierungsabschluss der Vanguard Projekte","en":"Vanguard projects reach financial close","es":"Cierre financiero de los proyectos Vanguard","fr":"Clôture financière des projets Vanguard","pt":"Fechamento financeiro dos projetos Vanguard","tr":"Vanguard projelerinde finansal kapanış"},"status":"occurred"}],"methodology":{"ar":"التاريخ وحالة الصفقة من إعلان آر دبليو إي، ولم يكتمل البناء أو التشغيل بعد.","de":"Datum und Transaktionsstand stammen aus der RWE Mitteilung. Bau und Inbetriebnahme sind noch nicht abgeschlossen.","en":"The date and transaction status are from the RWE announcement. Construction and commissioning are not yet complete.","es":"La fecha y el estado de la operación proceden del anuncio de RWE. La construcción y la puesta en servicio no han terminado.","fr":"La date et l'état de la transaction proviennent du communiqué de RWE. La construction et la mise en service ne sont pas achevées.","pt":"A data e o estado da transação vêm do anúncio da RWE. A construção e o comissionamento ainda não terminaram.","tr":"Tarih ve işlem durumu RWE duyurusundan alındı. İnşaat ve devreye alma henüz tamamlanmadı."},"sourceUrls":["https://www.rwe.com/en/press/rwe-ag/2026-11-11-rwe-and-kkr-join-forces-to-deliver-2-8-gw-of-new-offshore-wind-capacity-in-the-uk/"],"title":{"ar":"الإغلاق المالي لمشروعي فانغارد","de":"Finanzierungsabschluss der Vanguard Projekte","en":"Vanguard projects reach financial close","es":"Cierre financiero de los proyectos Vanguard","fr":"Clôture financière des projets Vanguard","pt":"Fechamento financeiro dos projetos Vanguard","tr":"Vanguard projelerinde finansal kapanış"},"type":"events","updatedAt":"2026-11-11T22:03:26+00:00"},{"description":{"ar":"تقدير المشروع والتزامات التمويل والقدرة المخططة مفاهيم مختلفة، ولا ينبغي جمع الأرقام.","de":"Projektschätzung, Finanzierungszusagen und geplante Leistung sind unterschiedliche Größen und dürfen nicht addiert werden.","en":"The project estimate, financing commitments and planned capacity are different concepts; the figures should not be summed.","es":"La estimación del proyecto, los compromisos financieros y la capacidad prevista son conceptos distintos; no deben sumarse las cifras.","fr":"L'estimation du projet, les engagements financiers et la puissance prévue sont des notions différentes ; ne pas additionner ces chiffres.","pt":"Estimativa do projeto, compromissos financeiros e capacidade planejada são conceitos distintos; os números não devem ser somados.","tr":"Duyurudaki proje tahmini, finansman taahhütleri ve planlanan güç farklı kavramlardır; rakamlar toplanmamalı."},"id":"financing-and-capacity","items":[{"basis":"forecast","label":{"ar":"القدرة الإجمالية المخططة للمشروعين","de":"Geplante Gesamtleistung beider Projekte","en":"Planned combined capacity of both projects","es":"Capacidad conjunta prevista de ambos proyectos","fr":"Puissance totale prévue des deux projets","pt":"Capacidade conjunta planejada dos dois projetos","tr":"İki projenin planlanan toplam gücü"},"measure":{"aggregation":"unspecified","frequency":"daily","geography":"united-kingdom","id":"vanguard-planned-combined-capacity","periodRole":"announcement-date","unitCode":"gw"},"period":"2026-11-11","unit":"GW","value":2.8,"valueQualifier":"approximate"},{"basis":"estimate","label":{"ar":"إجمالي الاستثمار المقدر للمشروعين","de":"Geschätzte Gesamtinvestition der Projekte","en":"Estimated total project investment","es":"Inversión total estimada de los proyectos","fr":"Investissement total estimé des projets","pt":"Investimento total estimado dos projetos","tr":"Tahmini toplam proje yatırımı"},"measure":{"aggregation":"unspecified","frequency":"daily","geography":"united-kingdom","id":"vanguard-estimated-project-investment","periodRole":"announcement-date","unitCode":"billion-gbp"},"period":"2026-11-11","unit":"billion GBP","value":12,"valueQualifier":"approximate"},{"basis":"observed","label":{"ar":"تسهيلات التمويل النقدي","de":"Barkreditfazilitäten","en":"Cash financing facilities","es":"Facilidades financieras de efectivo","fr":"Facilités de financement en trésorerie","pt":"Linhas financeiras de caixa","tr":"Nakit finansman olanakları"},"measure":{"aggregation":"unspecified","frequency":"daily","geography":"united-kingdom","id":"vanguard-cash-financing-facilities","periodRole":"announcement-date","unitCode":"billion-gbp"},"period":"2026-11-11","unit":"billion GBP","value":11.1,"valueQualifier":"exact"},{"basis":"observed","label":{"ar":"تسهيلات التمويل المساندة","de":"Ergänzende Finanzierungsfazilitäten","en":"Ancillary financing facilities","es":"Facilidades financieras auxiliares","fr":"Facilités financières accessoires","pt":"Linhas financeiras auxiliares","tr":"Yardımcı finansman olanakları"},"measure":{"aggregation":"unspecified","frequency":"daily","geography":"united-kingdom","id":"vanguard-ancillary-financing-facilities","periodRole":"announcement-date","unitCode":"billion-gbp"},"period":"2026-11-11","unit":"billion GBP","value":1.7,"valueQualifier":"exact"},{"basis":"observed","label":{"ar":"التزام صندوق الثروة الوطني ضمن التمويل","de":"In der Finanzierung enthaltene Zusage des National Wealth Fund","en":"National Wealth Fund commitment included in financing","es":"Compromiso del National Wealth Fund incluido en la financiación","fr":"Engagement du National Wealth Fund inclus dans le financement","pt":"Compromisso do National Wealth Fund incluído no financiamento","tr":"Finansmana dahil Ulusal Varlık Fonu taahhüdü"},"measure":{"aggregation":"unspecified","frequency":"daily","geography":"united-kingdom","id":"vanguard-national-wealth-fund-commitment","periodRole":"announcement-date","unitCode":"billion-gbp"},"period":"2026-11-11","unit":"billion GBP","value":1,"valueQualifier":"exact"}],"methodology":{"ar":"قيم إعلان آر دبليو إي منسوبة لتاريخ الإعلان. التزام الصندوق ضمن التمويل، والتسهيلات ليست إنفاقا والقدرة مخططة.","de":"Werte der RWE Mitteilung, dem Bekanntgabedatum zugeordnet. Die Fondszusage ist in der Finanzierung enthalten. Fazilitäten sind keine Ausgaben; die Leistung ist geplant.","en":"Values from the RWE announcement are attributed to the announcement date. The fund commitment is included in financing. Facilities are not expenditure; capacity is planned.","es":"Valores del anuncio de RWE atribuidos a su fecha. El compromiso del fondo está incluido en la financiación. Las facilidades no son gasto y la capacidad es prevista.","fr":"Valeurs du communiqué de RWE attribuées à sa date. L'engagement du fonds est inclus dans le financement. Les facilités ne sont pas des dépenses et la puissance est prévue.","pt":"Valores do anúncio da RWE atribuídos à data de divulgação. O compromisso do fundo está incluído no financiamento. Linhas não são gastos e a capacidade é planejada.","tr":"RWE duyurusundaki değerler duyuru tarihine bağlandı. Fon taahhüdü finansmanın içindedir. Olanaklar harcama değildir, güç planlanandır."},"sourceUrls":["https://www.rwe.com/en/press/rwe-ag/2026-11-11-rwe-and-kkr-join-forces-to-deliver-2-8-gw-of-new-offshore-wind-capacity-in-the-uk/"],"title":{"ar":"مشروعا فانغارد: أرقام مختارة للتمويل والقدرة","de":"Vanguard Projekte: ausgewählte Finanzierungs und Leistungszahlen","en":"Vanguard projects: selected financing and capacity figures","es":"Proyectos Vanguard: cifras seleccionadas de financiación y capacidad","fr":"Projets Vanguard : chiffres choisis du financement et de la puissance","pt":"Projetos Vanguard: números selecionados de financiamento e capacidade","tr":"Vanguard projeleri: seçili finansman ve kapasite rakamları"},"type":"metrics","updatedAt":"2026-11-11T22:03:26+00:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11/data/financial-close?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11/data/financial-close?lang=en&format=json"},"id":"financial-close"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11/data/financing-and-capacity?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11/data/financing-and-capacity?lang=en&format=json"},"id":"financing-and-capacity"}],"data_types":["events","metrics"],"editorial_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-d0190c29-0d93-57d6-842a-3ee720312a73","event_period":"2026-11-11","event_period_basis":"event-or-reference-period","id":"rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11","image":null,"importance":0.6,"language":"en","modified_at":"2026-11-11T22:06:17+00:00","publication_basis":"publication-record","published_at":"2026-11-11T22:06:17+00:00","reading_minutes":4,"region":"world","relations":[{"event_period":"2026-07","id":"lamprell-vanguard-west-east-ruzgar-imalat-2026","language":"en","published_at":"2026-10-02T21:09:51+03:00","title":"Lamprell updates Vanguard West fabrication and Vanguard East preparations","type":"background","url":"https://newsverum.com/en/news/lamprell-updates-vanguard-west-fabrication-and-vanguard-east-preparations"}],"section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11","sources":[{"checkedAt":"2026-11-12","name":"RWE: Vanguard project financing and partnership","publishedAt":"2026-11-11","url":"https://www.rwe.com/en/press/rwe-ag/2026-11-11-rwe-and-kkr-join-forces-to-deliver-2-8-gw-of-new-offshore-wind-capacity-in-the-uk/"},{"checkedAt":"2026-11-12","name":"RWE: Lamprell transition piece contracts","publishedAt":"2024-09-26","url":"https://uk.rwe.com/press-and-news/2024-09-26-rwe-signs-contract-with-lamprell-to-supply-transition-pieces/"},{"checkedAt":"2026-11-12","name":"Lamprell: 2026 Q2 CEO message","url":"https://www.lamprell.com/lamprelltimes-q2-2026/lt2026q2-message-from-the-ceo/"}],"summary":"The two projects have a planned combined capacity of 2.8 GW. Financial close does not mean the wind farms are complete; RWE expects full commissioning in 2030.","text":"The two projects have a planned combined capacity of 2.8 GW. Financial close does not mean the wind farms are complete; RWE expects full commissioning in 2030.\n\nRWE and investment firm KKR have reached financial close for the Vanguard West and Vanguard East offshore wind projects in the British North Sea, bringing a planned 2.8 gigawatts of generating capacity into a 50:50 partnership. The announcement on 11 November 2026 marks the completion of the financing and equity transactions, not the completion of either wind farm. RWE expects both projects to be fully commissioned in 2030.\n\nThe German energy group put the combined investment at around £12 billion, including the wind farms and associated transmission infrastructure. That is the company's estimate of project investment. It should not be added to the headline financing facilities as if they were an unrelated second construction budget: the financing and shareholders' equity are how the partners plan to support the same projects.\n\nRWE said the non-recourse project financing consists of £11.1 billion in cash facilities and £1.7 billion in ancillary facilities from a consortium of 35 international banks. A facility is a financing commitment, not proof that the entire amount has already been drawn or spent. Ancillary facilities serve financing needs alongside cash lending and should not be treated automatically as the cash cost of building turbines. The company described the package as the largest such project financing in UK offshore wind, a characterization that has not been independently ranked here.\n\nThe package includes a £1 billion commitment from the UK's National Wealth Fund. RWE also identified credit cover from Germany's Euler Hermes and Denmark's EIFO. The fund's commitment is included within the financing described by the company, rather than an extra £1 billion to add on top. RWE said the arrangements were combined with equity commitments from the two owners, without specifying their individual cash contributions in the announcement.\n\nKKR acquired a 50% equity stake in each project, completing a transaction announced in January. RWE retains the other half and will lead delivery for the joint venture. The distinction matters because financial close and ownership do not constitute an award of every construction package, nor do they demonstrate that the farms are generating electricity. Financing can enable a project to proceed while delivery remains subject to construction and operational risks.\n\nEach wind farm has a planned capacity of 1.4 GW and would stand between 50 and 80 kilometres off the Norfolk coast. RWE said onshore cable work and substation construction were already well advanced. Offshore construction is expected to begin in early 2027, with the first foundation for Vanguard West planned in the first half of that year, followed by Vanguard East. Dates are schedules announced by the developer and can change.\n\nBoth projects received 20 year, inflation indexed Contracts for Difference in the UK's seventh allocation round in January 2026. The stated strike price was £91.20 per megawatt hour in 2024 prices. That reference is not a present household retail tariff: a Contract for Difference is a support mechanism linked to a reference electricity price, while household bills contain other costs. The announced strike price is indexed and cannot be compared directly with a later nominal price without adjustment.\n\nRWE estimates that once operating, the two farms could produce electricity equivalent to the consumption of around three million UK homes. This is an illustrative generation comparison, not a count of homes already supplied or an assurance that every household receives power from these sites at all times. Actual output will depend on wind conditions, availability and other operating factors.\n\nThe new agreement also sits alongside earlier supply contracts. In September 2024 RWE said it had awarded Lamprell contracts to manufacture and transport 92 transition pieces for each project. Lamprell reported in its July 2026 company publication that fabrication for Vanguard West was progressing while preparations for Vanguard East continued. Those updates concern particular components, not the November financial close or a new overall EPC award.\n\nThe next observable milestones are the start of offshore work, foundation installation and eventual commissioning. Until then, capacity, household equivalents and completion dates remain plans or estimates, while the reported equity transaction and financing close are the decisions announced on 11 November.","title":"RWE and KKR reach financial close for Vanguard offshore wind projects","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11?lang=en","language":"en","url":"https://newsverum.com/en/news/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11?lang=es","language":"es","url":"https://newsverum.com/es/news/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11?lang=de","language":"de","url":"https://newsverum.com/de/news/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11"},{"api_url":"https://newsverum.com/api/v1/articles/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11"}],"url":"https://newsverum.com/en/news/rwe-kkr-vanguard-wind-projects-financial-close-2026-11-11"},"version":"1"}
