{"article":{"annotation":{"article_id":"polatli-lityum-ges-imar-aski-ekim-2026","available_at":"2026-10-06T23:11:17.966660Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"2fb16a4f598f368ae92b181f9878e7a96a7cafc2d17b53799916e244910e3208","input_sha256":"72d4a3f39421a5b5171bd5b001f1538f07291aabd9087f8217966869c0f8e916","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"TR","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.enerji.gov.tr/duyuru-detay?id=30643"]}],"geometry":null,"id":"iso3166-1:TR","kind":"country-or-area","labels":{"ar":"تركيا","en":"Türkiye","es":"Türkiye","fr":"Türkiye"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null},{"admin1":null,"city":"Ankara","coordinate_note":"UNGEGN city reference point from the cited source; source does not publish a positional uncertainty. Approximate gazetteer point only, not a city boundary, facility, project site, event location, or coverage footprint.","coordinate_reference_system":"OGC:CRS84","coordinate_source":"United Nations Cartographic Section","country":"TR","evidence":[{"field":"en.title+en.summary+en.body+country","language":"en","note":"Explicit article mention: Ankara. Country agrees with the preserved article scope. Gazetteer reference only; event location is unconfirmed.","source_urls":["https://www.enerji.gov.tr/duyuru-detay?id=30643","https://ungegn.un.org/dashboard/cities/details?id=76","https://ungegn-api.azurewebsites.net/API/GetCitiesDetails/76"]}],"geometry":{"coordinates":[32.79259107,39.9070700722],"type":"Point"},"id":"ungegn-city:76","kind":"city","labels":{"ar":"أنقرة","en":"Ankara","es":"Ankara","fr":"Ankara","tr":"Ankara"},"match_status":"candidate","precision":"approximate","role":"source-mentioned-place","uncertainty_m":null}],"rules_sha256":"d28c9c89703b56bd91fd887965d416d0115c2473d4bfbd3e558bcceafc3941dd","schema_version":1,"subjects":[{"concept_id":"medtop:20001209","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: solar","source_urls":["https://www.enerji.gov.tr/duyuru-detay?id=30643"]}],"method":"controlled-rules-v1","rule_id":"solar-power","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection?lang=fr","category":"energy","content":{"key_points":[],"paragraphs":["Selon le ministère de l’Énergie, les documents du projet proposé dans le quartier de Şıhahmet à Polatlı, Ankara, sont consultables pendant 15 jours à partir du 2 octobre 2026. Le plan directeur au 1:5 000 et le plan d’application au 1:1 000 ont été approuvés le 29 septembre.","Les identifiants sont NİP-061149900 / UİP-061149899. Les documents sont disponibles sur le site du ministère, au tableau de son siège et dans le système e-plan. Cette procédure d’urbanisme n’annonce pas le début de la production d’électricité."],"sections":[]},"corrections":[{"at":"2026-10-06T21:57:28+03:00","language":"fr","text":"Les traductions linguistiques manquantes de cet article ont été ajoutées."},{"at":"2026-10-07T00:55:19+03:00","language":"fr","text":"Des éditions allemande et portugaise, ainsi que les traductions des explications des données et des corrections, ont été ajoutées à cet article."}],"country":"TR","data":null,"data_downloads":[],"data_types":[],"editorial_illustration":{"alt":"Illustration conceptuelle de la production d’électricité, du stockage et des données connectées.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-a7768761-b41d-57fe-b46e-43f68500356d","event_period":"2026-10-02","event_period_basis":"event-or-reference-period","id":"polatli-lityum-ges-imar-aski-ekim-2026","image":null,"importance":0.4,"language":"fr","modified_at":"2026-10-07T00:55:19+03:00","publication_basis":"publication-record","published_at":"2026-10-02T15:13:33+03:00","reading_minutes":1,"region":"turkiye","section_illustration":{"alt":"Illustration conceptuelle de la production d’électricité, du stockage et des données connectées.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"polatli-lityum-solar-and-storage-plans-opened-for-public-inspection","sources":[{"checkedAt":"2026-10-02","name":"Enerji ve Tabii Kaynaklar Bakanlığı","url":"https://www.enerji.gov.tr/duyuru-detay?id=30643"}],"summary":"Une période de consultation de 15 jours a commencé pour le projet de Şıhahmet.","text":"Une période de consultation de 15 jours a commencé pour le projet de Şıhahmet.\n\nSelon le ministère de l’Énergie, les documents du projet proposé dans le quartier de Şıhahmet à Polatlı, Ankara, sont consultables pendant 15 jours à partir du 2 octobre 2026. Le plan directeur au 1:5 000 et le plan d’application au 1:1 000 ont été approuvés le 29 septembre.\n\nLes identifiants sont NİP-061149900 / UİP-061149899. Les documents sont disponibles sur le site du ministère, au tableau de son siège et dans le système e-plan. Cette procédure d’urbanisme n’annonce pas le début de la production d’électricité.\n\nLes traductions linguistiques manquantes de cet article ont été ajoutées.\n\nDes éditions allemande et portugaise, ainsi que les traductions des explications des données et des corrections, ont été ajoutées à cet article.","title":"Les plans solaires et de stockage de Polatlı Lityum soumis à consultation","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection?lang=en","language":"en","url":"https://newsverum.com/en/news/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection?lang=es","language":"es","url":"https://newsverum.com/es/news/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection?lang=de","language":"de","url":"https://newsverum.com/de/news/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection"},{"api_url":"https://newsverum.com/api/v1/articles/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection"}],"url":"https://newsverum.com/fr/news/polatli-lityum-solar-and-storage-plans-opened-for-public-inspection"},"version":"1"}
