{"article":{"annotation":{"article_id":"parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026","available_at":"2026-10-06T23:11:45.734575Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"cef87dce0794716020d8214a1858fd7ba654a4f038e5b382dc1f2e78770d7b38","input_sha256":"4d21affb7f0a1e16146c73044c94e5693fbde11219ea6105397d00b4bcd227a9","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"AE","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.dubaiholding.com/en/media-hub/press-releases/meraas-awards-over-aed-590-million-main-construction-contract-for-city-walk-crestlane"]}],"geometry":null,"id":"iso3166-1:AE","kind":"country-or-area","labels":{"ar":"الإمارات العربية المتحدة","en":"United Arab Emirates","es":"Emiratos Árabes Unidos","fr":"Émirats arabes unis"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null},{"admin1":null,"city":"Dubai","coordinate_note":"UNGEGN city reference point from the cited source; source does not publish a positional uncertainty. Approximate gazetteer point only, not a city boundary, facility, project site, event location, or coverage footprint.","coordinate_reference_system":"OGC:CRS84","coordinate_source":"NGA GEOnet Names Server (GNS)","country":"AE","evidence":[{"field":"en.title+en.summary+en.body+country","language":"en","note":"Explicit article mention: Dubai. Country agrees with the preserved article scope. Gazetteer reference only; event location is unconfirmed.","source_urls":["https://www.dubaiholding.com/en/media-hub/press-releases/meraas-awards-over-aed-590-million-main-construction-contract-for-city-walk-crestlane","https://ungegn.un.org/dashboard/cities/details?id=1893","https://ungegn-api.azurewebsites.net/API/GetCitiesDetails/1893"]}],"geometry":{"coordinates":[55.28,25.252222],"type":"Point"},"id":"ungegn-city:1893","kind":"city","labels":{"ar":"دبي","en":"Dubai"},"match_status":"candidate","precision":"approximate","role":"source-mentioned-place","uncertainty_m":null}],"rules_sha256":"d28c9c89703b56bd91fd887965d416d0115c2473d4bfbd3e558bcceafc3941dd","schema_version":1,"subjects":[{"concept_id":"medtop:20001368","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: apartments","source_urls":["https://www.dubaiholding.com/en/media-hub/press-releases/meraas-awards-over-aed-590-million-main-construction-contract-for-city-walk-crestlane"]}],"method":"controlled-rules-v1","rule_id":"residential-real-estate","status":"candidate"},{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.dubaiholding.com/en/media-hub/press-releases/meraas-awards-over-aed-590-million-main-construction-contract-for-city-walk-crestlane"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026?lang=fr","category":"infrastructure","content":{"key_points":[],"paragraphs":["Meraas, membre de Dubai Holding Real Estate, a annoncé le 7 septembre 2026 avoir attribué à Parkway International Contracting un contrat principal de construction d’une valeur de plus de 590 millions de dirhams émiratis. Le contrat porte sur la livraison de 394 appartements répartis dans quatre immeubles résidentiels de la phase 3 de City Walk Crestlane, à Dubaï.","Meraas a indiqué que la construction a déjà commencé et que l’achèvement est prévu d’ici le troisième trimestre 2028. Le communiqué présente Crestlane comme un prolongement de l’environnement urbain piétonnier de City Walk, avec des espaces ouverts paysagers et des plans d’eau. Dans l’ensemble de la communauté, les résidents disposeront de piscines, d’installations sportives, d’une salle de sport, d’un club flottant et d’un cinéma en plein air.","Le communiqué donne la valeur uniquement comme supérieure à 590 millions de dirhams, sans montant exact, et ne précise pas quand le contrat a été signé."],"sections":[]},"corrections":[{"at":"2026-10-07T00:52:10+03:00","language":"fr","text":"Des éditions allemande et portugaise, ainsi que les traductions des explications des données et des corrections, ont été ajoutées à cet article."}],"country":"AE","data":{"blocks":[{"description":{"ar":"قيمة العقد وعدد الشقق كما وردت في بيان «مراس» الصادر في 7 سبتمبر 2026 والمنشور عبر «دبي القابضة».","de":"Vertragswert und Wohnungszahl laut Mitteilung von Meraas vom 7. September 2026, veröffentlicht von Dubai Holding.","en":"Contract value and apartment count stated in the Meraas release of 7 September 2026, published by Dubai Holding.","es":"Valor del contrato y número de apartamentos indicados en el comunicado de Meraas del 7 de septiembre de 2026, publicado por Dubai Holding.","fr":"Valeur du contrat et nombre d’appartements indiqués dans le communiqué de Meraas du 7 septembre 2026, publié par Dubai Holding.","pt":"Valor do contrato e número de apartamentos conforme comunicado da Meraas de 7 de setembro de 2026, publicado pela Dubai Holding.","tr":"Dubai Holding’in yayımladığı Meraas duyurusunda (7 Eylül 2026) belirtilen sözleşme bedeli ve daire sayısı."},"id":"contract-scope-figures","items":[{"basis":"observed","label":{"ar":"قيمة العقد","de":"Vertragswert","en":"Contract value","es":"Valor del contrato","fr":"Valeur du contrat","pt":"Valor do contrato","tr":"Sözleşme bedeli"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"dubai","id":"city-walk-crestlane-phase-3-contract-value","periodRole":"announcement-date","unitCode":"million-aed"},"period":"2026-09-07","unit":"million AED","value":590,"valueQualifier":"lower-bound"},{"basis":"target","label":{"ar":"الشقق المشمولة بالعقد","de":"Vom Vertrag umfasste Wohnungen","en":"Apartments covered by the contract","es":"Apartamentos incluidos en el contrato","fr":"Appartements couverts par le contrat","pt":"Apartamentos abrangidos pelo contrato","tr":"Sözleşme kapsamındaki daireler"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"dubai","id":"city-walk-crestlane-phase-3-apartments","periodRole":"announcement-date","unitCode":"count"},"period":"2026-09-07","unit":"count","value":394},{"basis":"target","label":{"ar":"المباني السكنية المشمولة بالعقد","de":"Vom Vertrag umfasste Wohngebäude","en":"Residential buildings covered by the contract","es":"Edificios residenciales incluidos en el contrato","fr":"Immeubles résidentiels couverts par le contrat","pt":"Edifícios residenciais abrangidos pelo contrato","tr":"Sözleşme kapsamındaki konut binaları"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"dubai","id":"city-walk-crestlane-phase-3-buildings","periodRole":"announcement-date","unitCode":"count"},"period":"2026-09-07","unit":"count","value":4}],"methodology":{"ar":"مبلغ 590 مليون درهم حد أدنى لأن «مراس» ذكرت أن القيمة تتجاوز 590 مليون درهم. وأعداد الشقق والمباني مخطط لها وليست مكتملة.","de":"590 Millionen AED sind eine Untergrenze, da Meraas den Wert mit „mehr als 590 Millionen AED“ angab. Wohnungs- und Gebäudezahlen sind Planwerte und keine fertiggestellten Einheiten.","en":"The AED 590 million is a lower bound because Meraas gave the value as more than AED 590 million. The apartment and building counts are planned figures, not completed units.","es":"Los 590 millones de dirhams son un límite inferior, porque Meraas indicó un valor superior a 590 millones de dirhams. Las cifras de apartamentos y edificios son previstas, no unidades terminadas.","fr":"Les 590 millions de dirhams constituent une borne inférieure, Meraas ayant indiqué une valeur supérieure à 590 millions de dirhams. Les nombres d’appartements et d’immeubles sont des chiffres prévus, et non des unités achevées.","pt":"AED 590 milhões é um limite inferior, pois a Meraas informou um valor superior a AED 590 milhões. As contagens de apartamentos e edifícios são números planejados, não unidades concluídas.","tr":"590 milyon BAE dirhemi bir alt sınırdır; çünkü Meraas değeri 590 milyon BAE dirhemini aşan bir tutar olarak belirtti. Daire ve bina sayıları planlanan sayılardır, tamamlanmış birimler değildir."},"sourceUrls":["https://www.dubaiholding.com/en/media-hub/press-releases/meraas-awards-over-aed-590-million-main-construction-contract-for-city-walk-crestlane"],"title":{"ar":"أرقام العقد ونطاقه","de":"Vertrags- und Umfangsangaben","en":"Contract and scope figures","es":"Cifras del contrato y del alcance","fr":"Chiffres du contrat et du périmètre","pt":"Valores do contrato e escopo","tr":"Sözleşme ve kapsam rakamları"},"type":"metrics","updatedAt":"2026-10-07T00:52:10+03:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026/data/contract-scope-figures?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026/data/contract-scope-figures?lang=fr&format=json"},"id":"contract-scope-figures"}],"data_types":["metrics"],"editorial_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-9dbc22c2-4e11-5f3b-b09a-bd5397f26982","event_period":"2026-09-07","event_period_basis":"event-or-reference-period","id":"parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026","image":null,"importance":0.6,"language":"fr","modified_at":"2026-10-07T00:52:10+03:00","publication_basis":"publication-record","published_at":"2026-10-05T09:37:37+00:00","reading_minutes":2,"region":"world","section_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026","sources":[{"checkedAt":"2026-10-04","name":"Dubai Holding","publishedAt":"2026-09-07","url":"https://www.dubaiholding.com/en/media-hub/press-releases/meraas-awards-over-aed-590-million-main-construction-contract-for-city-walk-crestlane"}],"summary":"Meraas a attribué à Parkway International Contracting un contrat principal de construction de plus de 590 millions de dirhams émiratis pour 394 appartements répartis dans quatre immeubles de la phase 3 de City Walk Crestlane, à Dubaï, a-t-elle annoncé le 7 septembre 2026.","text":"Meraas a attribué à Parkway International Contracting un contrat principal de construction de plus de 590 millions de dirhams émiratis pour 394 appartements répartis dans quatre immeubles de la phase 3 de City Walk Crestlane, à Dubaï, a-t-elle annoncé le 7 septembre 2026.\n\nMeraas, membre de Dubai Holding Real Estate, a annoncé le 7 septembre 2026 avoir attribué à Parkway International Contracting un contrat principal de construction d’une valeur de plus de 590 millions de dirhams émiratis. Le contrat porte sur la livraison de 394 appartements répartis dans quatre immeubles résidentiels de la phase 3 de City Walk Crestlane, à Dubaï.\n\nMeraas a indiqué que la construction a déjà commencé et que l’achèvement est prévu d’ici le troisième trimestre 2028. Le communiqué présente Crestlane comme un prolongement de l’environnement urbain piétonnier de City Walk, avec des espaces ouverts paysagers et des plans d’eau. Dans l’ensemble de la communauté, les résidents disposeront de piscines, d’installations sportives, d’une salle de sport, d’un club flottant et d’un cinéma en plein air.\n\nLe communiqué donne la valeur uniquement comme supérieure à 590 millions de dirhams, sans montant exact, et ne précise pas quand le contrat a été signé.\n\nDes éditions allemande et portugaise, ainsi que les traductions des explications des données et des corrections, ont été ajoutées à cet article.","title":"Parkway obtient un contrat de construction de plus de 590 millions de dirhams à City Walk Crestlane","topics":["epc-contractors"],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026"}],"url":"https://newsverum.com/fr/news/parkway-meraas-city-walk-crestlane-phase-3-main-construction-contract-september-2026"},"version":"1"}
