{"article_url":"https://newsverum.com/es/news/nigeria-ibadan-17-7mw-mini-grid-breaks-ground-for-five-communities-2026","block":{"columns":[{"key":"indicator","label":{"ar":"المؤشر والنطاق","de":"Indikator und Umfang","en":"Indicator and scope","es":"Indicador y alcance","fr":"Indicateur et périmètre","pt":"Indicador e âmbito","tr":"Gösterge ve kapsam"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة المخططة","de":"Geplanter Wert","en":"Planned value","es":"Valor previsto","fr":"Valeur prévue","pt":"Valor previsto","tr":"Planlanan değer"},"type":"number","unit":"count"}],"description":{"ar":"بدأت الحكومة الاتحادية إنشاء شبكة كهرباء مصغرة مترابطة بقدرة 17.7 ميغاواط لخدمة خمس مجتمعات في إبادان بولاية أويو. وتتولى شركة باراس إنرجي تطوير المشروع.","de":"Die Bundesregierung begann mit dem Bau eines verbundenen Mini-Netzes mit 17,7 Megawatt für fünf Gemeinden in Ibadan im Bundesstaat Oyo. Paras Energy entwickelt das Projekt.","en":"The federal government began construction of an interconnected 17.7-megawatt mini-grid intended to serve five communities in Ibadan, Oyo State. Paras Energy is developing the project.","es":"El Gobierno federal inició la construcción de una minirred interconectada de 17,7 megavatios para cinco comunidades de Ibadan, en el estado de Oyo. Paras Energy desarrolla el proyecto.","fr":"Le gouvernement fédéral a lancé la construction d’un mini-réseau interconnecté de 17,7 mégawatts destiné à cinq communautés d’Ibadan, dans l’État d’Oyo. Le projet est développé par Paras Energy.","pt":"O governo federal iniciou a construção de uma minirrede interligada de 17,7 megawatts destinada a cinco comunidades de Ibadan, no estado de Oyo. A Paras Energy desenvolve o projeto.","tr":"Federal hükümet, Oyo eyaleti Ibadan’da beş topluluğa hizmet vermesi planlanan birbirine bağlı 17,7 megavatlık mini şebekenin inşaatını başlattı. Projeyi Paras Energy yürütüyor."},"id":"planned-community-infrastructure","methodology":{"ar":"اليوم هو تاريخ نشر المصدر؛ لم يُحدد اليوم الدقيق للحفل أو الاجتماع. الأهداف ليست نتائج تشغيلية.","de":"Der Tag bezeichnet die Quellenveröffentlichung; der genaue Tag der Zeremonie oder Sitzung wird nicht genannt. Ziele sind keine Betriebsergebnisse.","en":"The day is the source publication date; the exact ceremony or meeting day is not stated. Targets are not operating results.","es":"El día corresponde a la publicación de la fuente; no se indica la fecha exacta de la ceremonia o reunión. Las metas no son resultados operativos.","fr":"Le jour correspond à la publication de la source ; la date exacte de la cérémonie ou de la réunion n’est pas indiquée. Les objectifs ne sont pas des résultats d’exploitation.","pt":"O dia corresponde à publicação da fonte; não é indicado o dia exato da cerimónia ou reunião. As metas não são resultados operacionais.","tr":"Gün kaynak açıklamasının tarihidir; törenin veya toplantının kesin günü açıklanmamıştır. Hedefler işletme sonucu değildir."},"rowTranslations":[{"indicator":{"ar":"عدد المجتمعات المستهدفة","de":"Zahl der Zielgemeinden","en":"Number of target communities","es":"Número de comunidades destinatarias","fr":"Nombre de communautés visées","pt":"Número de comunidades destinatárias","tr":"Hedef topluluk sayısı"}},{"indicator":{"ar":"عدد المحولات الجديدة المخطط تركيبها","de":"Zahl der geplanten neuen Transformatoren","en":"Number of new transformers planned for installation","es":"Número de transformadores nuevos previstos","fr":"Nombre de nouveaux transformateurs prévus","pt":"Número de novos transformadores previstos","tr":"Kurulması planlanan yeni transformatör sayısı"}}],"rows":[{"indicator":"Number of target communities","value":5},{"indicator":"Number of new transformers planned for installation","value":18}],"sourceUrls":["https://fmino.gov.ng/fg-breaks-ground-on-17-7mw-ibadan-mini-grid-targets-20-hour-daily-power-supply-for-five-communities/"],"title":{"ar":"نطاق المشروع وبنية التوزيع المخططة","de":"Projektumfang und geplante Verteilinfrastruktur","en":"Project coverage and planned distribution infrastructure","es":"Cobertura del proyecto y distribución prevista","fr":"Périmètre du projet et distribution prévue","pt":"Cobertura do projeto e distribuição prevista","tr":"Proje kapsamı ve planlanan dağıtım altyapısı"},"type":"table","updatedAt":"2026-10-20T13:33:52Z"},"version":1}
