{"article":{"annotation":{"article_id":"nigeria-abuja-kano-highway-30-km-section-commissioned-2026","available_at":"2026-10-25T01:05:54.697425Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"b7c69abb864cf7b5f3255eb6ea8c5f87f128661be2326247f36a973633c9a01d","input_sha256":"51cad607dac828af5b2363d0f707b0b8d505011552852d47df3e8b3000b45df8","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"NG","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"]}],"geometry":null,"id":"iso3166-1:NG","kind":"country-or-area","labels":{"ar":"نيجيريا","en":"Nigeria","es":"Nigeria","fr":"Nigéria"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=fr","category":"infrastructure","content":{"key_points":[],"paragraphs":["Le ministère nigérian de l’Information a rapporté le 22 octobre que le gouvernement fédéral avait inauguré 30,58 kilomètres de travaux sur la voie rapide Abuja-Kaduna-Zaria-Kano. La cérémonie s’est tenue la veille à Kano. Le gouverneur Abba Kabir Yusuf a procédé à l’inauguration au nom du président Bola Tinubu, selon le communiqué.","Le ministère des Travaux présente le tronçon comme une étape pour achever des projets hérités et renforcer la connectivité nationale. La route vise à faciliter le déplacement des personnes, des produits agricoles et d’autres marchandises. Ce sont les objectifs annoncés; le communiqué ne fournit pas de données de circulation, de fret ou de temps de parcours après l’ouverture.","La longueur inaugurée est de 30,58 kilomètres, mais les limites exactes, le nombre de voies et les ouvrages compris ne sont pas précisés. Le coût du contrat, les dépenses cumulées, l’avancement global et les sections restantes ne sont pas publiés. Le communiqué ne permet donc pas d’établir quelle part de l’autoroute entière est utilisable.","L’axe relie Abuja à Kaduna, Zaria et Kano. Une meilleure continuité pourrait aider voyageurs et marchandises, mais les effets dépendront des travaux restants, de l’entretien, de la sécurité et des routes d’accès. Le ministère n’a pas chiffré d’économies pour les agriculteurs ou voyageurs. Il s’agit d’une étape de travaux, pas de l’annonce d’un corridor Abuja-Kano entièrement achevé.","Le ministre des Travaux, David Umahi, a déclaré que des hausses de coûts et la lenteur des travaux avaient laissé des sections inachevées et entraîné la résiliation du contrat précédent. Selon le compte rendu officiel, le président Bola Tinubu a demandé de prioriser l’achèvement selon des exigences de qualité, de sécurité et de durabilité. Il aurait aussi ordonné de prolonger la section de Kano jusqu’à l’aéroport international Malam Aminu Kano, sans date d’achèvement annoncée.","Umahi a déclaré que le lot 1, long de 118 kilomètres et estimé à 252 milliards de nairas, était achevé. Ce chiffre de projet est distinct des 30,58 kilomètres inaugurés lors de la cérémonie. Le ministère a également cité un revêtement en béton armé continu sur de larges portions, présenté comme un moyen d’accroître la durabilité et de réduire l’entretien. Aucun détail des coûts ni comparaison de performance n’a été publié.","Le directeur des routes David Yiltong a indiqué que les travaux inaugurés incluent une chaussée asphaltée à l’extrémité de Kano et une section supplémentaire sur l’axe Karfi-Kunkumi. Le représentant de l’ingénieur Chukwuma Kalu Igwe a énuméré construction et réhabilitation de chaussée, asphaltage, drainage, ouvrages routiers, éclairage, caméras CCTV et infrastructures associées. Le communiqué ne détaille pas les quantités par élément.","Les responsables affirment que les travaux améliorent l’accès aux communautés et centres commerciaux et que l’éclairage améliore la visibilité nocturne. L’État de Kano a inauguré séparément la réhabilitation d’Audu Bako Way et le dédoublement des routes de l’hôpital Nassarawa. Ces projets urbains relèvent de l’État, pas de l’autoroute fédérale; leurs longueurs et coûts ne sont pas indiqués."],"sections":[]},"corrections":[],"country":"NG","data":{"blocks":[{"description":{"ar":"الإجراء والتاريخ الواردان في البيان الرسمي.","de":"Maßnahme und Datum laut amtlicher Mitteilung.","en":"The action and date reported in the official release.","es":"Medida y fecha del comunicado oficial.","fr":"Mesure et date rapportées dans le communiqué officiel.","pt":"Ação e data informadas no comunicado oficial.","tr":"Resmî duyurudaki eylem ve tarih."},"id":"official-event","items":[{"date":"2026-10-22","description":{"ar":"افتتحت الحكومة أعمال طريق بطول 30.58 كيلومتراً على محور أبوجا-كادونا-زاريا-كانو في مراسم أقيمت بكانو يوم 21 أكتوبر. ولم يذكر البيان تكلفة المشروع أو نسبة إنجاز المسار كله أو تقديرات زمن الرحلة.","de":"Die Regierung eröffnete am 21. Oktober bei einer Zeremonie in Kano 30,58 Kilometer Bauarbeiten auf der Strecke Abuja-Kaduna-Zaria-Kano. Die Mitteilung nennt weder Projektkosten noch den Fertigstellungsgrad der gesamten Strecke oder Reisezeitprognosen.","en":"The government commissioned 30.58 kilometres of road work on the Abuja-Kaduna-Zaria-Kano Expressway at a ceremony in Kano on October 21. The release did not provide project cost, full-corridor completion or travel-time estimates.","es":"El Gobierno inauguró 30,58 kilómetros de obras en el eje Abuya-Kaduna-Zaria-Kano en una ceremonia celebrada en Kano el 21 de octubre. El comunicado no ofrece coste, avance total del corredor ni estimaciones de tiempo de viaje.","fr":"Le gouvernement a inauguré 30,58 kilomètres de travaux sur l’axe Abuja-Kaduna-Zaria-Kano lors d’une cérémonie à Kano le 21 octobre. Le communiqué ne donne ni coût du projet, ni avancement de l’ensemble du corridor, ni estimation du temps de trajet.","pt":"O governo inaugurou 30,58 quilômetros de obras na rota Abuja-Kaduna-Zaria-Kano em cerimônia em Kano no dia 21 de outubro. O comunicado não informou custo, conclusão de todo o corredor ou estimativas de tempo de viagem.","tr":"Hükümet, Abuja-Kaduna-Zaria-Kano Otoyolu’ndaki 30,58 kilometrelik yol çalışmasını 21 Ekim’de Kano’da düzenlenen törenle açtı. Duyuruda proje maliyeti, tüm koridorun tamamlanma oranı veya seyahat süresi tahminleri verilmedi."},"label":{"ar":"إعلان رسمي","de":"Amtliche Mitteilung","en":"Official announcement","es":"Anuncio oficial","fr":"Annonce officielle","pt":"Anúncio oficial","tr":"Resmî duyuru"},"status":"occurred"}],"methodology":{"ar":"يسجل الحدث والتاريخ من البيان الرسمي الأولي ولا يقيس النتائج اللاحقة.","de":"Ereignis und Datum stammen aus der amtlichen Primärquelle; spätere Ergebnisse werden nicht gemessen.","en":"Event and date are recorded from the primary official release; subsequent outcomes are not measured.","es":"El evento y la fecha proceden de la fuente oficial; no se miden resultados posteriores.","fr":"L’événement et sa date proviennent de la source officielle; les résultats ultérieurs ne sont pas mesurés.","pt":"Evento e data vêm da fonte oficial primária; resultados posteriores não são medidos.","tr":"Etkinlik ve tarih birincil resmî duyurudan kaydedilmiştir; sonraki sonuçlar ölçülmemektedir."},"sourceUrls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"],"title":{"ar":"إنجاز في الإعلان الرسمي للمشروع","de":"Amtlicher Projektmeilenstein","en":"Milestone in the official project announcement","es":"Hito comunicado oficialmente del proyecto","fr":"Étape du projet annoncée officiellement","pt":"Etapa oficial do projeto","tr":"Resmî proje duyurusundaki kilometre taşı"},"type":"events","updatedAt":"2026-10-25T00:46:17Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Figure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Ölçü"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة (kilometres)","de":"Wert (kilometres)","en":"Value (kilometres)","es":"Valor (kilometres)","fr":"Valeur (kilometres)","pt":"Valor (kilometres)","tr":"Değer (kilometres)"},"type":"number","unit":"kilometres"},{"key":"context","label":{"ar":"الوصف والفترة","de":"Einordnung und Zeitraum","en":"Qualifier and period","es":"Calificador y período","fr":"Qualification et période","pt":"Qualificador e período","tr":"Niteleme ve dönem"},"language":"en","type":"text"}],"description":{"ar":"الكمية والسياق الواردان في المصدر الأولي.","de":"Menge und Kontext laut Primärquelle.","en":"Quantity and context reported by the primary source.","es":"Cantidad y contexto comunicados por la fuente primaria.","fr":"Quantité et contexte rapportés par la source primaire.","pt":"Quantidade e contexto informados pela fonte primária.","tr":"Birincil kaynakta açıklanan miktar ve bağlam."},"id":"reported-figure","methodology":{"ar":"سُجل الرقم مع وصفه وسياقه في المصدر؛ ولا ينبغي اعتباره نتيجة محققة.","de":"Die Zahl wird mit Einordnung und Kontext der Quelle erfasst; sie ist kein erreichtes Ergebnis.","en":"The figure is recorded with the source’s qualifier and context; it should not be interpreted as an achieved outcome.","es":"La cifra se registra con su calificador y contexto; no debe interpretarse como resultado alcanzado.","fr":"Le chiffre est consigné avec sa qualification et son contexte; ce n’est pas un résultat acquis.","pt":"O valor é registrado com qualificador e contexto da fonte; não deve ser interpretado como resultado alcançado.","tr":"Sayı, resmî açıklamadaki niteleme ve bağlamla kaydedilmiştir; gerçekleşen sonuç olarak yorumlanmamalıdır."},"rows":[{"context":"Length of newly commissioned works","measure":"Road works commissioned","value":30.58},{"context":"Lot 1 length, reported completed","measure":"Lot 1 length, reported completed","value":118}],"sourceUrls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"],"title":{"ar":"قيمة رقمية واردة في الإعلان","de":"Zahlenangabe aus der Mitteilung","en":"Quantified figure in the announcement","es":"Cifra cuantificada en el anuncio","fr":"Valeur chiffrée annoncée","pt":"Valor quantificado no anúncio","tr":"Duyuruda bildirilen ölçülebilir değer"},"type":"table","updatedAt":"2026-10-25T00:46:17Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Ölçü"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"billion NGN"},{"key":"context","label":{"ar":"السياق","de":"Kontext","en":"Context","es":"Contexto","fr":"Contexte","pt":"Contexto","tr":"Bağlam"},"language":"en","type":"text"}],"description":{"ar":"الكميات الواردة في المصدر وسياقاتها المختلفة.","de":"Quellenangaben mit jeweils eigenem Kontext.","en":"Source-reported quantities and their distinct contexts.","es":"Cantidades de la fuente y sus contextos distintos.","fr":"Quantités rapportées par la source et contextes distincts.","pt":"Quantidades informadas pela fonte e seus contextos distintos.","tr":"Kaynakta bildirilen miktarlar ve farklı bağlamları."},"id":"lot1-estimated-cost","methodology":{"ar":"يحافظ كل صف على سياق المصدر؛ ولا تُجمع الأرقام أو تحوّل.","de":"Jede Zeile behält ihren Quellenkontext; Zahlen werden nicht zusammengeführt oder umgerechnet.","en":"Each row retains the source context; figures are not combined or converted.","es":"Cada fila conserva el contexto de la fuente; las cifras no se suman ni convierten.","fr":"Chaque ligne conserve le contexte de la source; les chiffres ne sont ni combinés ni convertis.","pt":"Cada linha preserva o contexto da fonte; os valores não são somados nem convertidos.","tr":"Her satır kaynak bağlamını korur; sayılar birleştirilmez veya dönüştürülmez."},"rows":[{"context":"Estimated Lot 1 cost, distinct from the newly commissioned section","measure":"Lot 1 estimated cost","value":252}],"sourceUrls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"],"title":{"ar":"أرقام إضافية معلنة","de":"Weitere gemeldete Zahlen","en":"Additional reported figures","es":"Cifras adicionales comunicadas","fr":"Chiffres supplémentaires communiqués","pt":"Números adicionais informados","tr":"Ek bildirilen sayılar"},"type":"table","updatedAt":"2026-10-25T00:46:17Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/official-event?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/official-event?lang=fr&format=json"},"id":"official-event"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/reported-figure?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/reported-figure?lang=fr&format=json"},"id":"reported-figure"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/lot1-estimated-cost?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/lot1-estimated-cost?lang=fr&format=json"},"id":"lot1-estimated-cost"}],"data_types":["events","table"],"editorial_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-7661c4af-77af-5021-8138-280f205b8836","event_period":"2026-10-22","event_period_basis":"event-or-reference-period","id":"nigeria-abuja-kano-highway-30-km-section-commissioned-2026","image":null,"importance":0.6,"language":"fr","modified_at":"2026-10-25T01:05:39+00:00","publication_basis":"publication-record","published_at":"2026-10-25T01:05:39+00:00","reading_minutes":3,"region":"world","section_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"nigeria-abuja-kano-highway-30-km-section-commissioned-2026","sources":[{"checkedAt":"2026-10-25","name":"Federal Ministry of Information and National Orientation, relaying a Federal Ministry of Works release","publishedAt":"2026-10-22","url":"https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"}],"summary":"Le gouvernement a inauguré 30,58 kilomètres de travaux sur l’axe Abuja-Kaduna-Zaria-Kano lors d’une cérémonie à Kano le 21 octobre. Le communiqué ne donne ni coût du projet, ni avancement de l’ensemble du corridor, ni estimation du temps de trajet.","text":"Le gouvernement a inauguré 30,58 kilomètres de travaux sur l’axe Abuja-Kaduna-Zaria-Kano lors d’une cérémonie à Kano le 21 octobre. Le communiqué ne donne ni coût du projet, ni avancement de l’ensemble du corridor, ni estimation du temps de trajet.\n\nLe ministère nigérian de l’Information a rapporté le 22 octobre que le gouvernement fédéral avait inauguré 30,58 kilomètres de travaux sur la voie rapide Abuja-Kaduna-Zaria-Kano. La cérémonie s’est tenue la veille à Kano. Le gouverneur Abba Kabir Yusuf a procédé à l’inauguration au nom du président Bola Tinubu, selon le communiqué.\n\nLe ministère des Travaux présente le tronçon comme une étape pour achever des projets hérités et renforcer la connectivité nationale. La route vise à faciliter le déplacement des personnes, des produits agricoles et d’autres marchandises. Ce sont les objectifs annoncés; le communiqué ne fournit pas de données de circulation, de fret ou de temps de parcours après l’ouverture.\n\nLa longueur inaugurée est de 30,58 kilomètres, mais les limites exactes, le nombre de voies et les ouvrages compris ne sont pas précisés. Le coût du contrat, les dépenses cumulées, l’avancement global et les sections restantes ne sont pas publiés. Le communiqué ne permet donc pas d’établir quelle part de l’autoroute entière est utilisable.\n\nL’axe relie Abuja à Kaduna, Zaria et Kano. Une meilleure continuité pourrait aider voyageurs et marchandises, mais les effets dépendront des travaux restants, de l’entretien, de la sécurité et des routes d’accès. Le ministère n’a pas chiffré d’économies pour les agriculteurs ou voyageurs. Il s’agit d’une étape de travaux, pas de l’annonce d’un corridor Abuja-Kano entièrement achevé.\n\nLe ministre des Travaux, David Umahi, a déclaré que des hausses de coûts et la lenteur des travaux avaient laissé des sections inachevées et entraîné la résiliation du contrat précédent. Selon le compte rendu officiel, le président Bola Tinubu a demandé de prioriser l’achèvement selon des exigences de qualité, de sécurité et de durabilité. Il aurait aussi ordonné de prolonger la section de Kano jusqu’à l’aéroport international Malam Aminu Kano, sans date d’achèvement annoncée.\n\nUmahi a déclaré que le lot 1, long de 118 kilomètres et estimé à 252 milliards de nairas, était achevé. Ce chiffre de projet est distinct des 30,58 kilomètres inaugurés lors de la cérémonie. Le ministère a également cité un revêtement en béton armé continu sur de larges portions, présenté comme un moyen d’accroître la durabilité et de réduire l’entretien. Aucun détail des coûts ni comparaison de performance n’a été publié.\n\nLe directeur des routes David Yiltong a indiqué que les travaux inaugurés incluent une chaussée asphaltée à l’extrémité de Kano et une section supplémentaire sur l’axe Karfi-Kunkumi. Le représentant de l’ingénieur Chukwuma Kalu Igwe a énuméré construction et réhabilitation de chaussée, asphaltage, drainage, ouvrages routiers, éclairage, caméras CCTV et infrastructures associées. Le communiqué ne détaille pas les quantités par élément.\n\nLes responsables affirment que les travaux améliorent l’accès aux communautés et centres commerciaux et que l’éclairage améliore la visibilité nocturne. L’État de Kano a inauguré séparément la réhabilitation d’Audu Bako Way et le dédoublement des routes de l’hôpital Nassarawa. Ces projets urbains relèvent de l’État, pas de l’autoroute fédérale; leurs longueurs et coûts ne sont pas indiqués.","title":"Le Nigeria ouvre 30,58 km de la route Abuja-Kano","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"}],"url":"https://newsverum.com/fr/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},"version":"1"}
