{"article":{"annotation":{"article_id":"nigeria-abuja-kano-highway-30-km-section-commissioned-2026","available_at":"2026-10-25T01:05:54.697425Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"b7c69abb864cf7b5f3255eb6ea8c5f87f128661be2326247f36a973633c9a01d","input_sha256":"51cad607dac828af5b2363d0f707b0b8d505011552852d47df3e8b3000b45df8","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"NG","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"]}],"geometry":null,"id":"iso3166-1:NG","kind":"country-or-area","labels":{"ar":"نيجيريا","en":"Nigeria","es":"Nigeria","fr":"Nigéria"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=es","category":"infrastructure","content":{"key_points":[],"paragraphs":["El Ministerio de Información de Nigeria informó el 22 de octubre de que el Gobierno federal inauguró 30,58 kilómetros de obras en la autopista Abuya-Kaduna-Zaria-Kano. La ceremonia tuvo lugar el día anterior en Kano. El gobernador Abba Kabir Yusuf realizó la inauguración en nombre del presidente Bola Tinubu, según la nota.","El Ministerio de Obras presentó el tramo como parte del esfuerzo por terminar proyectos heredados y reforzar la conectividad nacional. La carretera pretende facilitar el movimiento de personas, productos agrícolas y otras mercancías. Son objetivos declarados por el Gobierno; el comunicado no aporta datos observados de tráfico, carga o cambios en los tiempos de viaje.","La nota fija en 30,58 kilómetros la longitud inaugurada, pero no identifica los límites exactos, carriles u obras incluidas. Tampoco publica el valor del contrato, el gasto acumulado, el porcentaje total de avance ni los tramos pendientes. Por ello no permite calcular qué parte de toda la autopista está operativa.","La ruta conecta Abuya con Kaduna, Zaria y Kano. Una mayor continuidad vial podría ayudar a pasajeros y mercancías, pero el beneficio dependerá de las obras pendientes, el mantenimiento, la seguridad y los accesos. El ministerio no cuantificó ahorros para agricultores o viajeros. El anuncio registra un hito de construcción, no la finalización de toda la ruta.","El ministro de Obras, David Umahi, dijo que los aumentos de costes y la lentitud de construcción habían dejado tramos pendientes y que el contrato anterior se rescindió. Según el informe oficial, el presidente Bola Tinubu pidió priorizar la finalización con criterios de calidad, seguridad y durabilidad. También ordenó prolongar el tramo de Kano hasta el aeropuerto internacional Malam Aminu Kano, pero no se indicó fecha para esa extensión.","Umahi afirmó que el lote 1, de 118 kilómetros y con un coste estimado de 252.000 millones de nairas, estaba terminado. Esa cifra del proyecto es distinta de los 30,58 kilómetros inaugurados en la ceremonia. El ministerio también citó pavimento de hormigón armado continuo en tramos extensos, con el objetivo de aumentar durabilidad y reducir mantenimiento. No publicó desglose de costes ni comparaciones de rendimiento.","El director de carreteras David Yiltong dijo que las obras inauguradas incluyen pavimento asfáltico en el extremo de Kano y trabajos adicionales en el eje Karfi-Kunkumi. El representante del ingeniero Chukwuma Kalu Igwe describió obras de construcción y rehabilitación del pavimento, asfaltado, drenaje, mejoras estructurales, alumbrado, cámaras CCTV e infraestructura relacionada. El comunicado no ofrece cantidades por componente.","Los funcionarios dijeron que las obras mejoraron el acceso a comunidades y centros comerciales, y que las luces mejoraron la visibilidad nocturna. Kano inauguró por separado la rehabilitación de Audu Bako Way y la ampliación de las carreteras del Hospital Nassarawa. Son proyectos urbanos estatales distintos de la autopista federal. La nota no da sus longitudes ni costes."],"sections":[]},"corrections":[],"country":"NG","data":{"blocks":[{"description":{"ar":"الإجراء والتاريخ الواردان في البيان الرسمي.","de":"Maßnahme und Datum laut amtlicher Mitteilung.","en":"The action and date reported in the official release.","es":"Medida y fecha del comunicado oficial.","fr":"Mesure et date rapportées dans le communiqué officiel.","pt":"Ação e data informadas no comunicado oficial.","tr":"Resmî duyurudaki eylem ve tarih."},"id":"official-event","items":[{"date":"2026-10-22","description":{"ar":"افتتحت الحكومة أعمال طريق بطول 30.58 كيلومتراً على محور أبوجا-كادونا-زاريا-كانو في مراسم أقيمت بكانو يوم 21 أكتوبر. ولم يذكر البيان تكلفة المشروع أو نسبة إنجاز المسار كله أو تقديرات زمن الرحلة.","de":"Die Regierung eröffnete am 21. Oktober bei einer Zeremonie in Kano 30,58 Kilometer Bauarbeiten auf der Strecke Abuja-Kaduna-Zaria-Kano. Die Mitteilung nennt weder Projektkosten noch den Fertigstellungsgrad der gesamten Strecke oder Reisezeitprognosen.","en":"The government commissioned 30.58 kilometres of road work on the Abuja-Kaduna-Zaria-Kano Expressway at a ceremony in Kano on October 21. The release did not provide project cost, full-corridor completion or travel-time estimates.","es":"El Gobierno inauguró 30,58 kilómetros de obras en el eje Abuya-Kaduna-Zaria-Kano en una ceremonia celebrada en Kano el 21 de octubre. El comunicado no ofrece coste, avance total del corredor ni estimaciones de tiempo de viaje.","fr":"Le gouvernement a inauguré 30,58 kilomètres de travaux sur l’axe Abuja-Kaduna-Zaria-Kano lors d’une cérémonie à Kano le 21 octobre. Le communiqué ne donne ni coût du projet, ni avancement de l’ensemble du corridor, ni estimation du temps de trajet.","pt":"O governo inaugurou 30,58 quilômetros de obras na rota Abuja-Kaduna-Zaria-Kano em cerimônia em Kano no dia 21 de outubro. O comunicado não informou custo, conclusão de todo o corredor ou estimativas de tempo de viagem.","tr":"Hükümet, Abuja-Kaduna-Zaria-Kano Otoyolu’ndaki 30,58 kilometrelik yol çalışmasını 21 Ekim’de Kano’da düzenlenen törenle açtı. Duyuruda proje maliyeti, tüm koridorun tamamlanma oranı veya seyahat süresi tahminleri verilmedi."},"label":{"ar":"إعلان رسمي","de":"Amtliche Mitteilung","en":"Official announcement","es":"Anuncio oficial","fr":"Annonce officielle","pt":"Anúncio oficial","tr":"Resmî duyuru"},"status":"occurred"}],"methodology":{"ar":"يسجل الحدث والتاريخ من البيان الرسمي الأولي ولا يقيس النتائج اللاحقة.","de":"Ereignis und Datum stammen aus der amtlichen Primärquelle; spätere Ergebnisse werden nicht gemessen.","en":"Event and date are recorded from the primary official release; subsequent outcomes are not measured.","es":"El evento y la fecha proceden de la fuente oficial; no se miden resultados posteriores.","fr":"L’événement et sa date proviennent de la source officielle; les résultats ultérieurs ne sont pas mesurés.","pt":"Evento e data vêm da fonte oficial primária; resultados posteriores não são medidos.","tr":"Etkinlik ve tarih birincil resmî duyurudan kaydedilmiştir; sonraki sonuçlar ölçülmemektedir."},"sourceUrls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"],"title":{"ar":"إنجاز في الإعلان الرسمي للمشروع","de":"Amtlicher Projektmeilenstein","en":"Milestone in the official project announcement","es":"Hito comunicado oficialmente del proyecto","fr":"Étape du projet annoncée officiellement","pt":"Etapa oficial do projeto","tr":"Resmî proje duyurusundaki kilometre taşı"},"type":"events","updatedAt":"2026-10-25T00:46:17Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Figure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Ölçü"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة (kilometres)","de":"Wert (kilometres)","en":"Value (kilometres)","es":"Valor (kilometres)","fr":"Valeur (kilometres)","pt":"Valor (kilometres)","tr":"Değer (kilometres)"},"type":"number","unit":"kilometres"},{"key":"context","label":{"ar":"الوصف والفترة","de":"Einordnung und Zeitraum","en":"Qualifier and period","es":"Calificador y período","fr":"Qualification et période","pt":"Qualificador e período","tr":"Niteleme ve dönem"},"language":"en","type":"text"}],"description":{"ar":"الكمية والسياق الواردان في المصدر الأولي.","de":"Menge und Kontext laut Primärquelle.","en":"Quantity and context reported by the primary source.","es":"Cantidad y contexto comunicados por la fuente primaria.","fr":"Quantité et contexte rapportés par la source primaire.","pt":"Quantidade e contexto informados pela fonte primária.","tr":"Birincil kaynakta açıklanan miktar ve bağlam."},"id":"reported-figure","methodology":{"ar":"سُجل الرقم مع وصفه وسياقه في المصدر؛ ولا ينبغي اعتباره نتيجة محققة.","de":"Die Zahl wird mit Einordnung und Kontext der Quelle erfasst; sie ist kein erreichtes Ergebnis.","en":"The figure is recorded with the source’s qualifier and context; it should not be interpreted as an achieved outcome.","es":"La cifra se registra con su calificador y contexto; no debe interpretarse como resultado alcanzado.","fr":"Le chiffre est consigné avec sa qualification et son contexte; ce n’est pas un résultat acquis.","pt":"O valor é registrado com qualificador e contexto da fonte; não deve ser interpretado como resultado alcançado.","tr":"Sayı, resmî açıklamadaki niteleme ve bağlamla kaydedilmiştir; gerçekleşen sonuç olarak yorumlanmamalıdır."},"rows":[{"context":"Length of newly commissioned works","measure":"Road works commissioned","value":30.58},{"context":"Lot 1 length, reported completed","measure":"Lot 1 length, reported completed","value":118}],"sourceUrls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"],"title":{"ar":"قيمة رقمية واردة في الإعلان","de":"Zahlenangabe aus der Mitteilung","en":"Quantified figure in the announcement","es":"Cifra cuantificada en el anuncio","fr":"Valeur chiffrée annoncée","pt":"Valor quantificado no anúncio","tr":"Duyuruda bildirilen ölçülebilir değer"},"type":"table","updatedAt":"2026-10-25T00:46:17Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Ölçü"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"billion NGN"},{"key":"context","label":{"ar":"السياق","de":"Kontext","en":"Context","es":"Contexto","fr":"Contexte","pt":"Contexto","tr":"Bağlam"},"language":"en","type":"text"}],"description":{"ar":"الكميات الواردة في المصدر وسياقاتها المختلفة.","de":"Quellenangaben mit jeweils eigenem Kontext.","en":"Source-reported quantities and their distinct contexts.","es":"Cantidades de la fuente y sus contextos distintos.","fr":"Quantités rapportées par la source et contextes distincts.","pt":"Quantidades informadas pela fonte e seus contextos distintos.","tr":"Kaynakta bildirilen miktarlar ve farklı bağlamları."},"id":"lot1-estimated-cost","methodology":{"ar":"يحافظ كل صف على سياق المصدر؛ ولا تُجمع الأرقام أو تحوّل.","de":"Jede Zeile behält ihren Quellenkontext; Zahlen werden nicht zusammengeführt oder umgerechnet.","en":"Each row retains the source context; figures are not combined or converted.","es":"Cada fila conserva el contexto de la fuente; las cifras no se suman ni convierten.","fr":"Chaque ligne conserve le contexte de la source; les chiffres ne sont ni combinés ni convertis.","pt":"Cada linha preserva o contexto da fonte; os valores não são somados nem convertidos.","tr":"Her satır kaynak bağlamını korur; sayılar birleştirilmez veya dönüştürülmez."},"rows":[{"context":"Estimated Lot 1 cost, distinct from the newly commissioned section","measure":"Lot 1 estimated cost","value":252}],"sourceUrls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"],"title":{"ar":"أرقام إضافية معلنة","de":"Weitere gemeldete Zahlen","en":"Additional reported figures","es":"Cifras adicionales comunicadas","fr":"Chiffres supplémentaires communiqués","pt":"Números adicionais informados","tr":"Ek bildirilen sayılar"},"type":"table","updatedAt":"2026-10-25T00:46:17Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/official-event?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/official-event?lang=es&format=json"},"id":"official-event"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/reported-figure?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/reported-figure?lang=es&format=json"},"id":"reported-figure"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/lot1-estimated-cost?lang=es&format=csv","json":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/lot1-estimated-cost?lang=es&format=json"},"id":"lot1-estimated-cost"}],"data_types":["events","table"],"editorial_illustration":{"alt":"Ilustración conceptual de transporte, puentes y conexiones de infraestructura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-7661c4af-77af-5021-8138-280f205b8836","event_period":"2026-10-22","event_period_basis":"event-or-reference-period","id":"nigeria-abuja-kano-highway-30-km-section-commissioned-2026","image":null,"importance":0.6,"language":"es","modified_at":"2026-10-25T01:05:39+00:00","publication_basis":"publication-record","published_at":"2026-10-25T01:05:39+00:00","reading_minutes":3,"region":"world","section_illustration":{"alt":"Ilustración conceptual de transporte, puentes y conexiones de infraestructura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"es","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"nigeria-abuja-kano-highway-30-km-section-commissioned-2026","sources":[{"checkedAt":"2026-10-25","name":"Federal Ministry of Information and National Orientation, relaying a Federal Ministry of Works release","publishedAt":"2026-10-22","url":"https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"}],"summary":"El Gobierno inauguró 30,58 kilómetros de obras en el eje Abuya-Kaduna-Zaria-Kano en una ceremonia celebrada en Kano el 21 de octubre. El comunicado no ofrece coste, avance total del corredor ni estimaciones de tiempo de viaje.","text":"El Gobierno inauguró 30,58 kilómetros de obras en el eje Abuya-Kaduna-Zaria-Kano en una ceremonia celebrada en Kano el 21 de octubre. El comunicado no ofrece coste, avance total del corredor ni estimaciones de tiempo de viaje.\n\nEl Ministerio de Información de Nigeria informó el 22 de octubre de que el Gobierno federal inauguró 30,58 kilómetros de obras en la autopista Abuya-Kaduna-Zaria-Kano. La ceremonia tuvo lugar el día anterior en Kano. El gobernador Abba Kabir Yusuf realizó la inauguración en nombre del presidente Bola Tinubu, según la nota.\n\nEl Ministerio de Obras presentó el tramo como parte del esfuerzo por terminar proyectos heredados y reforzar la conectividad nacional. La carretera pretende facilitar el movimiento de personas, productos agrícolas y otras mercancías. Son objetivos declarados por el Gobierno; el comunicado no aporta datos observados de tráfico, carga o cambios en los tiempos de viaje.\n\nLa nota fija en 30,58 kilómetros la longitud inaugurada, pero no identifica los límites exactos, carriles u obras incluidas. Tampoco publica el valor del contrato, el gasto acumulado, el porcentaje total de avance ni los tramos pendientes. Por ello no permite calcular qué parte de toda la autopista está operativa.\n\nLa ruta conecta Abuya con Kaduna, Zaria y Kano. Una mayor continuidad vial podría ayudar a pasajeros y mercancías, pero el beneficio dependerá de las obras pendientes, el mantenimiento, la seguridad y los accesos. El ministerio no cuantificó ahorros para agricultores o viajeros. El anuncio registra un hito de construcción, no la finalización de toda la ruta.\n\nEl ministro de Obras, David Umahi, dijo que los aumentos de costes y la lentitud de construcción habían dejado tramos pendientes y que el contrato anterior se rescindió. Según el informe oficial, el presidente Bola Tinubu pidió priorizar la finalización con criterios de calidad, seguridad y durabilidad. También ordenó prolongar el tramo de Kano hasta el aeropuerto internacional Malam Aminu Kano, pero no se indicó fecha para esa extensión.\n\nUmahi afirmó que el lote 1, de 118 kilómetros y con un coste estimado de 252.000 millones de nairas, estaba terminado. Esa cifra del proyecto es distinta de los 30,58 kilómetros inaugurados en la ceremonia. El ministerio también citó pavimento de hormigón armado continuo en tramos extensos, con el objetivo de aumentar durabilidad y reducir mantenimiento. No publicó desglose de costes ni comparaciones de rendimiento.\n\nEl director de carreteras David Yiltong dijo que las obras inauguradas incluyen pavimento asfáltico en el extremo de Kano y trabajos adicionales en el eje Karfi-Kunkumi. El representante del ingeniero Chukwuma Kalu Igwe describió obras de construcción y rehabilitación del pavimento, asfaltado, drenaje, mejoras estructurales, alumbrado, cámaras CCTV e infraestructura relacionada. El comunicado no ofrece cantidades por componente.\n\nLos funcionarios dijeron que las obras mejoraron el acceso a comunidades y centros comerciales, y que las luces mejoraron la visibilidad nocturna. Kano inauguró por separado la rehabilitación de Audu Bako Way y la ampliación de las carreteras del Hospital Nassarawa. Son proyectos urbanos estatales distintos de la autopista federal. La nota no da sus longitudes ni costes.","title":"Nigeria inaugura 30,58 km de la carretera Abuya-Kano","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"}],"url":"https://newsverum.com/es/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},"version":"1"}
