{"article":{"annotation":{"article_id":"nigeria-abuja-kano-highway-30-km-section-commissioned-2026","available_at":"2026-10-25T01:05:54.697425Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"b7c69abb864cf7b5f3255eb6ea8c5f87f128661be2326247f36a973633c9a01d","input_sha256":"51cad607dac828af5b2363d0f707b0b8d505011552852d47df3e8b3000b45df8","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"NG","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"]}],"geometry":null,"id":"iso3166-1:NG","kind":"country-or-area","labels":{"ar":"نيجيريا","en":"Nigeria","es":"Nigeria","fr":"Nigéria"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=en","category":"infrastructure","content":{"key_points":[],"paragraphs":["The Federal Government commissioned 30.58 kilometres of road works on the Abuja-Kaduna-Zaria-Kano Expressway, the Federal Ministry of Information and National Orientation reported on October 22. The ceremony took place in Kano the previous day, with Kano State Governor Abba Kabir Yusuf performing the commissioning on behalf of President Bola Tinubu, according to the release.","The Works Ministry described the section as part of a wider effort to complete inherited infrastructure projects and strengthen national connectivity. It said the road is intended to facilitate movement of people, agricultural produce and other goods. Those are the government’s stated objectives; the announcement does not supply observed traffic counts, freight volumes or evidence of reduced journey times after opening.","The official release gives the commissioned length as 30.58 kilometres but does not identify precise chainage endpoints, lane configuration or the number of structures included in the opened section. It also omits the contract value, cumulative spending, overall project completion percentage and remaining sections. Readers therefore cannot infer from this announcement how much of the entire expressway is now usable or what proportion of the project has been completed.","The ceremony was held in Kano State and was attended by federal and state officials. The ministry framed the section as strategic infrastructure for regional commerce and mobility. The publication is a government account of commissioning; it does not provide a separate engineering completion certificate or a traffic-management plan.","The route links Abuja with Kaduna, Zaria and Kano, cities and commercial centres across north-central and north-western Nigeria. Better road continuity could support passenger travel and goods movement, but the scale of any benefit depends on remaining construction, maintenance, safety conditions and access roads. The ministry did not quantify expected savings for farmers, businesses or travellers.","The announcement records a construction milestone rather than a new transport policy or a fully completed Abuja-Kano route. It says the section was commissioned; it does not establish that all works across the corridor are complete. The distinction matters for readers tracking whether a continuous road journey has become available and whether freight or passenger outcomes have changed.","Works Minister David Umahi said the administration prioritized the outstanding sections after earlier construction delays and rising costs. The former contract had been terminated, and President Bola Tinubu directed the ministry to focus on completing the route to standards of quality, safety and durability, according to the official account. The release also says the president directed an extension of the Kano section to Malam Aminu Kano International Airport; it does not give a completion date for that extension.","Umahi said Lot 1, covering 118 kilometres at an estimated cost of ₦252 billion, had been completed. This is a separate project figure from the 30.58 kilometres commissioned at the ceremony. The ministry also cited continuously reinforced concrete pavement on substantial parts of the road, saying the technology was chosen to improve durability and reduce maintenance needs. It did not provide a breakdown of contract costs or compare pavement performance against alternatives.","Highways Director David Yiltong said the commissioned work includes asphalt pavement at the Kano end and additional work along the Karfi and Kunkumi axis. Engineer’s Representative Chukwuma Kalu Igwe described the work scope as pavement construction and rehabilitation, asphalt surfacing, drainage, road-structure improvements, streetlights, CCTV cameras and related infrastructure. The release does not list quantities or condition ratings for each component.","Officials said the road works improved access to communities and commercial centres along the corridor and that lighting improved nighttime visibility. Kano State separately commissioned rehabilitation of Audu Bako Way and dualisation of Nassarawa Hospital Roads during the event. Those are state urban-road projects, distinct from the federal expressway work. The ministry did not give their lengths or costs in the release."],"sections":[]},"corrections":[],"country":"NG","data":{"blocks":[{"description":{"ar":"الإجراء والتاريخ الواردان في البيان الرسمي.","de":"Maßnahme und Datum laut amtlicher Mitteilung.","en":"The action and date reported in the official release.","es":"Medida y fecha del comunicado oficial.","fr":"Mesure et date rapportées dans le communiqué officiel.","pt":"Ação e data informadas no comunicado oficial.","tr":"Resmî duyurudaki eylem ve tarih."},"id":"official-event","items":[{"date":"2026-10-22","description":{"ar":"افتتحت الحكومة أعمال طريق بطول 30.58 كيلومتراً على محور أبوجا-كادونا-زاريا-كانو في مراسم أقيمت بكانو يوم 21 أكتوبر. ولم يذكر البيان تكلفة المشروع أو نسبة إنجاز المسار كله أو تقديرات زمن الرحلة.","de":"Die Regierung eröffnete am 21. Oktober bei einer Zeremonie in Kano 30,58 Kilometer Bauarbeiten auf der Strecke Abuja-Kaduna-Zaria-Kano. Die Mitteilung nennt weder Projektkosten noch den Fertigstellungsgrad der gesamten Strecke oder Reisezeitprognosen.","en":"The government commissioned 30.58 kilometres of road work on the Abuja-Kaduna-Zaria-Kano Expressway at a ceremony in Kano on October 21. The release did not provide project cost, full-corridor completion or travel-time estimates.","es":"El Gobierno inauguró 30,58 kilómetros de obras en el eje Abuya-Kaduna-Zaria-Kano en una ceremonia celebrada en Kano el 21 de octubre. El comunicado no ofrece coste, avance total del corredor ni estimaciones de tiempo de viaje.","fr":"Le gouvernement a inauguré 30,58 kilomètres de travaux sur l’axe Abuja-Kaduna-Zaria-Kano lors d’une cérémonie à Kano le 21 octobre. Le communiqué ne donne ni coût du projet, ni avancement de l’ensemble du corridor, ni estimation du temps de trajet.","pt":"O governo inaugurou 30,58 quilômetros de obras na rota Abuja-Kaduna-Zaria-Kano em cerimônia em Kano no dia 21 de outubro. O comunicado não informou custo, conclusão de todo o corredor ou estimativas de tempo de viagem.","tr":"Hükümet, Abuja-Kaduna-Zaria-Kano Otoyolu’ndaki 30,58 kilometrelik yol çalışmasını 21 Ekim’de Kano’da düzenlenen törenle açtı. Duyuruda proje maliyeti, tüm koridorun tamamlanma oranı veya seyahat süresi tahminleri verilmedi."},"label":{"ar":"إعلان رسمي","de":"Amtliche Mitteilung","en":"Official announcement","es":"Anuncio oficial","fr":"Annonce officielle","pt":"Anúncio oficial","tr":"Resmî duyuru"},"status":"occurred"}],"methodology":{"ar":"يسجل الحدث والتاريخ من البيان الرسمي الأولي ولا يقيس النتائج اللاحقة.","de":"Ereignis und Datum stammen aus der amtlichen Primärquelle; spätere Ergebnisse werden nicht gemessen.","en":"Event and date are recorded from the primary official release; subsequent outcomes are not measured.","es":"El evento y la fecha proceden de la fuente oficial; no se miden resultados posteriores.","fr":"L’événement et sa date proviennent de la source officielle; les résultats ultérieurs ne sont pas mesurés.","pt":"Evento e data vêm da fonte oficial primária; resultados posteriores não são medidos.","tr":"Etkinlik ve tarih birincil resmî duyurudan kaydedilmiştir; sonraki sonuçlar ölçülmemektedir."},"sourceUrls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"],"title":{"ar":"إنجاز في الإعلان الرسمي للمشروع","de":"Amtlicher Projektmeilenstein","en":"Milestone in the official project announcement","es":"Hito comunicado oficialmente del proyecto","fr":"Étape du projet annoncée officiellement","pt":"Etapa oficial do projeto","tr":"Resmî proje duyurusundaki kilometre taşı"},"type":"events","updatedAt":"2026-10-25T00:46:17Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Figure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Ölçü"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة (kilometres)","de":"Wert (kilometres)","en":"Value (kilometres)","es":"Valor (kilometres)","fr":"Valeur (kilometres)","pt":"Valor (kilometres)","tr":"Değer (kilometres)"},"type":"number","unit":"kilometres"},{"key":"context","label":{"ar":"الوصف والفترة","de":"Einordnung und Zeitraum","en":"Qualifier and period","es":"Calificador y período","fr":"Qualification et période","pt":"Qualificador e período","tr":"Niteleme ve dönem"},"language":"en","type":"text"}],"description":{"ar":"الكمية والسياق الواردان في المصدر الأولي.","de":"Menge und Kontext laut Primärquelle.","en":"Quantity and context reported by the primary source.","es":"Cantidad y contexto comunicados por la fuente primaria.","fr":"Quantité et contexte rapportés par la source primaire.","pt":"Quantidade e contexto informados pela fonte primária.","tr":"Birincil kaynakta açıklanan miktar ve bağlam."},"id":"reported-figure","methodology":{"ar":"سُجل الرقم مع وصفه وسياقه في المصدر؛ ولا ينبغي اعتباره نتيجة محققة.","de":"Die Zahl wird mit Einordnung und Kontext der Quelle erfasst; sie ist kein erreichtes Ergebnis.","en":"The figure is recorded with the source’s qualifier and context; it should not be interpreted as an achieved outcome.","es":"La cifra se registra con su calificador y contexto; no debe interpretarse como resultado alcanzado.","fr":"Le chiffre est consigné avec sa qualification et son contexte; ce n’est pas un résultat acquis.","pt":"O valor é registrado com qualificador e contexto da fonte; não deve ser interpretado como resultado alcançado.","tr":"Sayı, resmî açıklamadaki niteleme ve bağlamla kaydedilmiştir; gerçekleşen sonuç olarak yorumlanmamalıdır."},"rows":[{"context":"Length of newly commissioned works","measure":"Road works commissioned","value":30.58},{"context":"Lot 1 length, reported completed","measure":"Lot 1 length, reported completed","value":118}],"sourceUrls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"],"title":{"ar":"قيمة رقمية واردة في الإعلان","de":"Zahlenangabe aus der Mitteilung","en":"Quantified figure in the announcement","es":"Cifra cuantificada en el anuncio","fr":"Valeur chiffrée annoncée","pt":"Valor quantificado no anúncio","tr":"Duyuruda bildirilen ölçülebilir değer"},"type":"table","updatedAt":"2026-10-25T00:46:17Z"},{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Kennzahl","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Ölçü"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"billion NGN"},{"key":"context","label":{"ar":"السياق","de":"Kontext","en":"Context","es":"Contexto","fr":"Contexte","pt":"Contexto","tr":"Bağlam"},"language":"en","type":"text"}],"description":{"ar":"الكميات الواردة في المصدر وسياقاتها المختلفة.","de":"Quellenangaben mit jeweils eigenem Kontext.","en":"Source-reported quantities and their distinct contexts.","es":"Cantidades de la fuente y sus contextos distintos.","fr":"Quantités rapportées par la source et contextes distincts.","pt":"Quantidades informadas pela fonte e seus contextos distintos.","tr":"Kaynakta bildirilen miktarlar ve farklı bağlamları."},"id":"lot1-estimated-cost","methodology":{"ar":"يحافظ كل صف على سياق المصدر؛ ولا تُجمع الأرقام أو تحوّل.","de":"Jede Zeile behält ihren Quellenkontext; Zahlen werden nicht zusammengeführt oder umgerechnet.","en":"Each row retains the source context; figures are not combined or converted.","es":"Cada fila conserva el contexto de la fuente; las cifras no se suman ni convierten.","fr":"Chaque ligne conserve le contexte de la source; les chiffres ne sont ni combinés ni convertis.","pt":"Cada linha preserva o contexto da fonte; os valores não são somados nem convertidos.","tr":"Her satır kaynak bağlamını korur; sayılar birleştirilmez veya dönüştürülmez."},"rows":[{"context":"Estimated Lot 1 cost, distinct from the newly commissioned section","measure":"Lot 1 estimated cost","value":252}],"sourceUrls":["https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"],"title":{"ar":"أرقام إضافية معلنة","de":"Weitere gemeldete Zahlen","en":"Additional reported figures","es":"Cifras adicionales comunicadas","fr":"Chiffres supplémentaires communiqués","pt":"Números adicionais informados","tr":"Ek bildirilen sayılar"},"type":"table","updatedAt":"2026-10-25T00:46:17Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/official-event?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/official-event?lang=en&format=json"},"id":"official-event"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/reported-figure?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/reported-figure?lang=en&format=json"},"id":"reported-figure"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/lot1-estimated-cost?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026/data/lot1-estimated-cost?lang=en&format=json"},"id":"lot1-estimated-cost"}],"data_types":["events","table"],"editorial_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-7661c4af-77af-5021-8138-280f205b8836","event_period":"2026-10-22","event_period_basis":"event-or-reference-period","id":"nigeria-abuja-kano-highway-30-km-section-commissioned-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-25T01:05:39+00:00","publication_basis":"publication-record","published_at":"2026-10-25T01:05:39+00:00","reading_minutes":4,"region":"world","section_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"nigeria-abuja-kano-highway-30-km-section-commissioned-2026","sources":[{"checkedAt":"2026-10-25","name":"Federal Ministry of Information and National Orientation, relaying a Federal Ministry of Works release","publishedAt":"2026-10-22","url":"https://fmino.gov.ng/fg-commissions-30-58-km-section-of-abuja-kano-expressway-reaffirms-commitment-to-completing-ihherited-projects/"}],"summary":"The government commissioned 30.58 kilometres of road work on the Abuja-Kaduna-Zaria-Kano Expressway at a ceremony in Kano on October 21. The release did not provide project cost, full-corridor completion or travel-time estimates.","text":"The government commissioned 30.58 kilometres of road work on the Abuja-Kaduna-Zaria-Kano Expressway at a ceremony in Kano on October 21. The release did not provide project cost, full-corridor completion or travel-time estimates.\n\nThe Federal Government commissioned 30.58 kilometres of road works on the Abuja-Kaduna-Zaria-Kano Expressway, the Federal Ministry of Information and National Orientation reported on October 22. The ceremony took place in Kano the previous day, with Kano State Governor Abba Kabir Yusuf performing the commissioning on behalf of President Bola Tinubu, according to the release.\n\nThe Works Ministry described the section as part of a wider effort to complete inherited infrastructure projects and strengthen national connectivity. It said the road is intended to facilitate movement of people, agricultural produce and other goods. Those are the government’s stated objectives; the announcement does not supply observed traffic counts, freight volumes or evidence of reduced journey times after opening.\n\nThe official release gives the commissioned length as 30.58 kilometres but does not identify precise chainage endpoints, lane configuration or the number of structures included in the opened section. It also omits the contract value, cumulative spending, overall project completion percentage and remaining sections. Readers therefore cannot infer from this announcement how much of the entire expressway is now usable or what proportion of the project has been completed.\n\nThe ceremony was held in Kano State and was attended by federal and state officials. The ministry framed the section as strategic infrastructure for regional commerce and mobility. The publication is a government account of commissioning; it does not provide a separate engineering completion certificate or a traffic-management plan.\n\nThe route links Abuja with Kaduna, Zaria and Kano, cities and commercial centres across north-central and north-western Nigeria. Better road continuity could support passenger travel and goods movement, but the scale of any benefit depends on remaining construction, maintenance, safety conditions and access roads. The ministry did not quantify expected savings for farmers, businesses or travellers.\n\nThe announcement records a construction milestone rather than a new transport policy or a fully completed Abuja-Kano route. It says the section was commissioned; it does not establish that all works across the corridor are complete. The distinction matters for readers tracking whether a continuous road journey has become available and whether freight or passenger outcomes have changed.\n\nWorks Minister David Umahi said the administration prioritized the outstanding sections after earlier construction delays and rising costs. The former contract had been terminated, and President Bola Tinubu directed the ministry to focus on completing the route to standards of quality, safety and durability, according to the official account. The release also says the president directed an extension of the Kano section to Malam Aminu Kano International Airport; it does not give a completion date for that extension.\n\nUmahi said Lot 1, covering 118 kilometres at an estimated cost of ₦252 billion, had been completed. This is a separate project figure from the 30.58 kilometres commissioned at the ceremony. The ministry also cited continuously reinforced concrete pavement on substantial parts of the road, saying the technology was chosen to improve durability and reduce maintenance needs. It did not provide a breakdown of contract costs or compare pavement performance against alternatives.\n\nHighways Director David Yiltong said the commissioned work includes asphalt pavement at the Kano end and additional work along the Karfi and Kunkumi axis. Engineer’s Representative Chukwuma Kalu Igwe described the work scope as pavement construction and rehabilitation, asphalt surfacing, drainage, road-structure improvements, streetlights, CCTV cameras and related infrastructure. The release does not list quantities or condition ratings for each component.\n\nOfficials said the road works improved access to communities and commercial centres along the corridor and that lighting improved nighttime visibility. Kano State separately commissioned rehabilitation of Audu Bako Way and dualisation of Nassarawa Hospital Roads during the event. Those are state urban-road projects, distinct from the federal expressway work. The ministry did not give their lengths or costs in the release.","title":"Nigeria commissions 30.58-km section of Abuja-Kano highway","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},{"api_url":"https://newsverum.com/api/v1/articles/nigeria-abuja-kano-highway-30-km-section-commissioned-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"}],"url":"https://newsverum.com/en/news/nigeria-abuja-kano-highway-30-km-section-commissioned-2026"},"version":"1"}
