{"article_url":"https://newsverum.com/en/news/new-zealand-genesis-q1-fy27-energy-performance-2026","block":{"description":{"en":"Selected energy capacity, gas contracting and generation figures in the 22 October company report.","tr":"Şirketin 22 Ekim raporundaki seçilmiş enerji kapasitesi, gaz sözleşmesi ve üretim değerleri."},"id":"new-zealand-genesis-q1-fy27-energy-performance-2026-metrics","items":[{"basis":"observed","label":{"en":"Huntly BESS Stage 1 power rating","tr":"Huntly BESS 1. aşama güç değeri"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"new-zealand","id":"genesis-huntly-bess-stage1-power","periodRole":"announcement-date","unitCode":"mw"},"period":"2026-10-22","unit":"MW","value":100}],"methodology":{"en":"Values are reported by Genesis for the quarter ended 30 September 2026, except contract volumes and planned project commissioning dates, which are future periods. Gas volumes remain in PJ as used by the source; no conversion is made. Figures with units absent from the current data registry remain in the narrative and are not recast as other quantities.","tr":"Sözleşme hacimleri ve planlanan proje devreye alma tarihleri dışında değerler Genesis’in 30 Eylül 2026’da biten çeyrek için bildirimidir. Gaz hacimleri kaynakta kullanıldığı üzere PJ olarak bırakılmış, dönüşüm yapılmamıştır. Mevcut veri sicilinde birimi bulunmayan değerler metinde korunmuştur; başka nicelikler olarak yeniden sınıflandırılmamıştır."},"sourceUrls":["https://announcements.nzx.com/announcement/482179"],"title":{"en":"Genesis FY27 Q1 energy and customer measures","tr":"Genesis FY27 ilk çeyrek enerji ve müşteri ölçümleri"},"type":"metrics","updatedAt":"2026-10-25T20:47:21Z"},"version":1}
