{"article":{"annotation":{"article_id":"navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026","available_at":"2026-10-06T23:12:07.009067Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"cee02a2814b71f1f3c2b25f2c34b123cefeb2248c1b028d1cfc383b0b8050538","input_sha256":"8154008f762c3dc89370a7fa32656aca502ebde29da8a41f9961405ce5eb925b","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"US","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.dvidshub.net/news/575886/navfac-midlant-awards-2712m-construction-contract-uscg-offshore-patrol-cutter-homeport-pier-newport-ri","https://www.prnewswire.com/news-releases/skanska-to-replace-us-coast-guard-homeport-pier-in-rhode-island-usa-for-usd-271m-about-sek-2-5-billion-302896985.html"]}],"geometry":null,"id":"iso3166-1:US","kind":"country-or-area","labels":{"ar":"الولايات المتحدة الأمريكية","en":"United States of America","es":"Estados Unidos de América","fr":"États-Unis d’Amérique"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"d28c9c89703b56bd91fd887965d416d0115c2473d4bfbd3e558bcceafc3941dd","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.dvidshub.net/news/575886/navfac-midlant-awards-2712m-construction-contract-uscg-offshore-patrol-cutter-homeport-pier-newport-ri","https://www.prnewswire.com/news-releases/skanska-to-replace-us-coast-guard-homeport-pier-in-rhode-island-usa-for-usd-271m-about-sek-2-5-billion-302896985.html"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026?lang=en","category":"infrastructure","content":{"key_points":[],"paragraphs":["On 29 September 2026, Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic said it had awarded Skanska USA Civil Northeast Inc., of Waltham, Massachusetts, a $271.2 million firm-fixed-price contract for construction of a U.S. Coast Guard Offshore Patrol Cutter homeport pier at Naval Station Newport in Rhode Island. Skanska announced the contract on 2 October 2026 and said work has begun, with completion anticipated in March 2030.","Skanska said the project replaces the existing Pier 1 at the active Navy installation. It covers demolition of the existing pier, which measures about 30 meters by 482 meters (100 feet by 1,580 feet), and construction of a new pier of about 24 meters by 305 meters (80 feet by 1,000 feet) that can berth four Coast Guard Offshore Patrol Cutters. The new pier will have substations, water and wastewater connections and a compressed air system, and the scope also includes site improvements, dredging and underground utilities.","NAVFAC said the maximum value, including the base price and four options, is $271,226,000, and that Coast Guard funding in that amount will be obligated at award. It said the contract was competitively procured through the SAM.gov website, with three offers received. Skanska said the contract value will be included in its U.S. order bookings for the third quarter of 2026."],"sections":[]},"corrections":[{"at":"2026-10-07T00:54:02+03:00","language":"en","text":"German and Portuguese editions and translations of the data and correction explanations have been added to this article."}],"country":"US","data":{"blocks":[{"description":{"ar":"قيمة العقد وأرقام الرصيف المخطط له كما وردت في إعلاني NAVFAC وسكانسكا.","de":"Vertragswert und geplante Pierangaben laut Mitteilungen von NAVFAC Mid-Atlantic und Skanska.","en":"Contract value and planned pier figures stated in the NAVFAC Mid-Atlantic and Skanska announcements.","es":"Valor del contrato y cifras del muelle previsto, según los anuncios de NAVFAC Atlántico Medio y de Skanska.","fr":"Valeur du contrat et chiffres de l’appontement prévu, tels qu’indiqués dans les annonces du NAVFAC Mid-Atlantic et de Skanska.","pt":"Valor do contrato e dados planejados do píer informados nos comunicados do NAVFAC Mid-Atlantic e da Skanska.","tr":"NAVFAC Orta Atlantik ve Skanska duyurularında belirtilen sözleşme değeri ile planlanan iskele rakamları."},"id":"contract-and-pier-figures","items":[{"basis":"observed","label":{"ar":"قيمة العقد (القصوى، شاملة أربعة خيارات)","de":"Vertragswert (Höchstwert, einschließlich vier Optionen)","en":"Contract value (maximum, including four options)","es":"Valor del contrato (máximo, con cuatro opciones)","fr":"Valeur du contrat (maximale, incluant quatre options)","pt":"Valor do contrato (máximo, incluindo quatro opções)","tr":"Sözleşme değeri (azami, dört opsiyon dahil)"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"rhode-island","id":"newport-coast-guard-pier-contract-value","periodRole":"announcement-date","unitCode":"million-usd"},"period":"2026-09-29","unit":"million USD","value":271.226},{"basis":"target","label":{"ar":"طول الرصيف الجديد (تقريبي)","de":"Länge des neuen Piers (ungefähr)","en":"New pier length (approximate)","es":"Longitud del nuevo muelle (aproximada)","fr":"Longueur du nouvel appontement (approximative)","pt":"Comprimento do novo píer (aproximado)","tr":"Yeni iskele uzunluğu (yaklaşık)"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"rhode-island","id":"newport-coast-guard-new-pier-length","periodRole":"announcement-date","unitCode":"metre"},"period":"2026-10-02","unit":"metres","value":305,"valueQualifier":"approximate"},{"basis":"target","label":{"ar":"عرض الرصيف الجديد (تقريبي)","de":"Breite des neuen Piers (ungefähr)","en":"New pier width (approximate)","es":"Anchura del nuevo muelle (aproximada)","fr":"Largeur du nouvel appontement (approximative)","pt":"Largura do novo píer (aproximada)","tr":"Yeni iskele genişliği (yaklaşık)"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"rhode-island","id":"newport-coast-guard-new-pier-width","periodRole":"announcement-date","unitCode":"metre"},"period":"2026-10-02","unit":"metres","value":24,"valueQualifier":"approximate"},{"basis":"target","label":{"ar":"عدد سفن الدورية البحرية التي يستطيع الرصيف الجديد استقبالها","de":"Offshore Patrol Cutter, die am neuen Pier anlegen können","en":"Offshore Patrol Cutters the new pier can berth","es":"Offshore Patrol Cutters que puede atracar el nuevo muelle","fr":"Offshore Patrol Cutters que le nouvel appontement peut accueillir","pt":"Offshore Patrol Cutters que poderão atracar no novo píer","tr":"Yeni iskelenin barındırabileceği Offshore Patrol Cutter sayısı"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"rhode-island","id":"newport-coast-guard-new-pier-cutter-berths","periodRole":"announcement-date","unitCode":"count"},"period":"2026-10-02","unit":"count","value":4}],"methodology":{"ar":"قيمة العقد هي القيمة القصوى التي تذكرها NAVFAC شاملة السعر الأساسي وأربعة خيارات. وطول الرصيف وعرضه أبعاد تخطيطية تقريبية وردت في إعلان سكانسكا وليست منشآت مبنية. أما عدد السفن فهو عدد سفن الدورية البحرية التي يستطيع الرصيف المخطط له استقبالها.","de":"Der Vertragswert ist der von NAVFAC genannte Höchstwert einschließlich Grundpreis und vier Optionen. Länge und Breite des Piers sind ungefähre geplante Maße aus der Mitteilung von Skanska und beschreiben keine fertiggestellte Anlage. Die Anzahl der Schiffe bezeichnet die Offshore Patrol Cutter, die am geplanten Pier anlegen können.","en":"The contract value is the maximum value NAVFAC states, including the base price and four options. Pier length and width are approximate planned dimensions from Skanska’s announcement, not built structures. The cutter figure is the number of Offshore Patrol Cutters the planned pier can berth.","es":"El valor del contrato es el valor máximo que indica NAVFAC, incluidos el precio base y cuatro opciones. La longitud y la anchura del muelle son dimensiones previstas y aproximadas del anuncio de Skanska, no estructuras ya construidas. La cifra de cúteres es el número de Offshore Patrol Cutters que puede atracar el muelle previsto.","fr":"La valeur du contrat est la valeur maximale indiquée par le NAVFAC, incluant le prix de base et quatre options. La longueur et la largeur de l’appontement sont des dimensions prévues, approximatives, tirées de l’annonce de Skanska, et non des ouvrages réalisés. Le chiffre des cutters est le nombre d’Offshore Patrol Cutters que l’appontement prévu peut accueillir.","pt":"O valor do contrato é o valor máximo informado pelo NAVFAC, incluindo o preço-base e quatro opções. O comprimento e a largura são dimensões planejadas aproximadas segundo o comunicado da Skanska, não estruturas já construídas. O número de navios corresponde aos Offshore Patrol Cutters que poderão atracar no píer planejado.","tr":"Sözleşme değeri, NAVFAC’ın temel fiyat ve dört opsiyon dahil belirttiği azami değerdir. İskele uzunluğu ve genişliği Skanska duyurusundaki yaklaşık planlanan ölçülerdir; inşa edilmiş yapılar değildir. Gemi sayısı, planlanan iskelenin barındırabileceği Offshore Patrol Cutter sayısıdır."},"sourceUrls":["https://www.dvidshub.net/news/575886/navfac-midlant-awards-2712m-construction-contract-uscg-offshore-patrol-cutter-homeport-pier-newport-ri","https://www.prnewswire.com/news-releases/skanska-to-replace-us-coast-guard-homeport-pier-in-rhode-island-usa-for-usd-271m-about-sek-2-5-billion-302896985.html"],"title":{"ar":"أرقام العقد والرصيف","de":"Vertrags- und Pierangaben","en":"Contract and pier figures","es":"Cifras del contrato y del muelle","fr":"Chiffres du contrat et de l’appontement","pt":"Dados do contrato e do píer","tr":"Sözleşme ve iskele rakamları"},"type":"metrics","updatedAt":"2026-10-07T00:54:02+03:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026/data/contract-and-pier-figures?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026/data/contract-and-pier-figures?lang=en&format=json"},"id":"contract-and-pier-figures"}],"data_types":["metrics"],"editorial_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-9ea27077-4e3d-5967-97d2-18d97b04d702","event_period":"2026-09-29","event_period_basis":"event-or-reference-period","id":"navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-10-07T00:54:02+03:00","publication_basis":"publication-record","published_at":"2026-10-05T09:37:37+00:00","reading_minutes":2,"region":"world","section_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026","sources":[{"checkedAt":"2026-10-04","name":"Naval Facilities Engineering Systems Command Mid-Atlantic via DVIDS","publishedAt":"2026-09-29","url":"https://www.dvidshub.net/news/575886/navfac-midlant-awards-2712m-construction-contract-uscg-offshore-patrol-cutter-homeport-pier-newport-ri"},{"checkedAt":"2026-10-04","name":"Skanska via PR Newswire","publishedAt":"2026-10-02","url":"https://www.prnewswire.com/news-releases/skanska-to-replace-us-coast-guard-homeport-pier-in-rhode-island-usa-for-usd-271m-about-sek-2-5-billion-302896985.html"}],"summary":"Naval Facilities Engineering Systems Command Mid-Atlantic awarded Skanska USA Civil Northeast a $271.2 million contract for a U.S. Coast Guard cutter homeport pier at Naval Station Newport, Rhode Island.","text":"Naval Facilities Engineering Systems Command Mid-Atlantic awarded Skanska USA Civil Northeast a $271.2 million contract for a U.S. Coast Guard cutter homeport pier at Naval Station Newport, Rhode Island.\n\nOn 29 September 2026, Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic said it had awarded Skanska USA Civil Northeast Inc., of Waltham, Massachusetts, a $271.2 million firm-fixed-price contract for construction of a U.S. Coast Guard Offshore Patrol Cutter homeport pier at Naval Station Newport in Rhode Island. Skanska announced the contract on 2 October 2026 and said work has begun, with completion anticipated in March 2030.\n\nSkanska said the project replaces the existing Pier 1 at the active Navy installation. It covers demolition of the existing pier, which measures about 30 meters by 482 meters (100 feet by 1,580 feet), and construction of a new pier of about 24 meters by 305 meters (80 feet by 1,000 feet) that can berth four Coast Guard Offshore Patrol Cutters. The new pier will have substations, water and wastewater connections and a compressed air system, and the scope also includes site improvements, dredging and underground utilities.\n\nNAVFAC said the maximum value, including the base price and four options, is $271,226,000, and that Coast Guard funding in that amount will be obligated at award. It said the contract was competitively procured through the SAM.gov website, with three offers received. Skanska said the contract value will be included in its U.S. order bookings for the third quarter of 2026.\n\nGerman and Portuguese editions and translations of the data and correction explanations have been added to this article.","title":"Skanska wins $271.2 million Coast Guard pier contract at Newport","topics":["epc-contractors"],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026"}],"url":"https://newsverum.com/en/news/navfac-skanska-coast-guard-homeport-pier-newport-contract-september-2026"},"version":"1"}
