{"article":{"annotation":{"article_id":"murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026","available_at":"2026-11-12T17:29:04.857351Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"a5fd545c16355d6c198e10317c381d99631a496fc2b8c20ca1afd98d49281398","input_sha256":"a77566905e69afba61bb2cc72941099d5cd11f4cee3edd2142f353ae53c422e1","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"AU","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.nsw.gov.au/ministerial-releases/have-your-say-flood-safe-rezoning-to-unlock-up-to-230-homes-murwillumbah"]}],"geometry":null,"id":"iso3166-1:AU","kind":"country-or-area","labels":{"ar":"أستراليا","en":"Australia","es":"Australia","fr":"Australie"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.nsw.gov.au/ministerial-releases/have-your-say-flood-safe-rezoning-to-unlock-up-to-230-homes-murwillumbah"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026?lang=pt","category":"infrastructure","content":{"key_points":[],"paragraphs":["O Governo de Nova Gales do Sul abriu uma consulta pública sobre o rezoneamento proposto de 143 North Arm Road, a oeste do centro urbano consolidado de Murwillumbah. A NSW Reconstruction Authority apoia a proposta através do Resilient Lands Program. Se for aprovado, o rezoneamento poderá abrir caminho para até 230 lotes residenciais. A consulta decorre de 12 de novembro a 10 de dezembro de 2026, e o governo afirma que uma avaliação independente contribuirá para uma decisão esperada no início de 2027. Estes são resultados de planeamento propostos, não lotes aprovados nem casas em construção.","O estado afirma que o local fica próximo de escolas, serviços de saúde, lojas e instalações comunitárias existentes e foi identificado como uma oportunidade habitacional em terreno descrito como seguro contra cheias. O governo comprometeu aproximadamente 7 milhões de dólares australianos para apoiar o processo de rezoneamento e contribuir para infraestruturas habilitadoras. Esse financiamento destina-se a estudos técnicos sobre cheias, biodiversidade, transportes, águas pluviais, infraestruturas e património cultural. O anúncio não afirma que os 7 milhões de dólares australianos constituem o custo total de desenvolvimento do local nem que o financiamento da construção esteja assegurado.","A alegação de resiliência às cheias é uma justificação de planeamento que terá de ser sustentada por provas técnicas. O risco de cheia pode variar dentro do terreno e depender da profundidade da água, da velocidade do fluxo, das vias de acesso, da drenagem, das condições climáticas futuras e da resiliência dos serviços públicos. O comunicado informa que a proposta e os documentos técnicos de apoio estão disponíveis para comentários públicos. Porém, o próprio anúncio não publica um plano final de loteamento nem uma avaliação de engenharia completa. A consulta é uma oportunidade para analisar esses materiais antes de uma decisão de rezoneamento, e não um sinal de que todas as preocupações foram resolvidas.","A proposta surge após os grandes impactos das cheias em Northern Rivers e integra um esforço mais amplo de recuperação e uso do solo. O objetivo declarado é aumentar as opções habitacionais e permitir que as pessoas mantenham ligações com a família, o trabalho e os serviços locais. A eventual melhoria da oferta habitacional regional dependerá de mais do que uma alteração do zoneamento. Uma aprovação futura terá de abordar estradas, sistemas de água e saneamento, drenagem, acesso de emergência e eventuais restrições ambientais ou patrimoniais. O estado afirma que qualquer empreendimento posterior exige avaliação e aprovação adicionais do Tweed Shire Council.","O processo tem várias etapas jurídicas e práticas distintas. A consulta atual diz respeito a um rezoneamento proposto. Uma avaliação independente analisará as contribuições e as provas, seguindo-se uma decisão estadual esperada no início de 2027. Se o rezoneamento avançar, o promotor ainda terá de apresentar planos e obter as aprovações municipais separadas necessárias para o loteamento e a construção. Assim, o máximo anunciado de 230 lotes representa uma capacidade potencial associada à proposta. Não é um compromisso de construção, uma contagem de habitações concluídas nem uma previsão de ocupação.","A participação pública pode influenciar as informações exigidas e os impactos que precisam de mais estudo. Os residentes poderão centrar-se no trânsito, na evacuação em caso de cheia, na drenagem, nas áreas de vegetação, nas instalações comunitárias ou nos efeitos da alteração do uso do solo junto à localidade. O governo afirma que os estudos técnicos abrangem vários destes temas, mas não descreve as contribuições recebidas nem as conclusões futuras do avaliador independente. Uma análise sólida deve divulgar os mapas e pressupostos subjacentes e explicar o comportamento do local em diferentes cenários de cheia.","Os próximos passos mensuráveis são o encerramento das contribuições em 10 de dezembro e a decisão esperada no início de 2027. Se o governo aprovar o rezoneamento, será necessário identificar exatamente as regras de uso do solo adotadas e explicar quaisquer condições. Se a proposta for rejeitada ou revista, esse resultado também deve ser apresentado em relação à proposta original. Por enquanto, o facto verificado é uma consulta apoiada por 7 milhões de dólares australianos para trabalhos de planeamento e estudos técnicos, com capacidade potencial máxima de 230 lotes residenciais. A fonte não demonstra que essas casas já estejam aprovadas ou que a proteção contra cheias esteja garantida."],"sections":[]},"corrections":[],"country":"AU","data":{"blocks":[{"columns":[{"key":"item","label":{"ar":"البند","de":"Punkt","en":"Item","es":"Elemento","fr":"Élément","pt":"Item","tr":"Öğe"},"language":"en","type":"text"},{"key":"detail","label":{"ar":"التفصيل الوارد","de":"Angegebene Einzelheit","en":"Reported detail","es":"Detalle comunicado","fr":"Détail indiqué","pt":"Detalhe indicado","tr":"Bildirilen ayrıntı"},"language":"en","type":"text"}],"description":{"ar":"عملية التخطيط المقترحة والتمويل ومتطلبات الموافقة بعد إعادة التقسيم.","de":"Das geplante Verfahren, die Finanzierung und die nach einer Umwidmung erforderliche Genehmigung.","en":"The proposed planning process, funding and post-rezoning approval requirement.","es":"El proceso de planificación propuesto, la financiación y la aprobación necesaria tras la recalificación.","fr":"La procédure de planification proposée, le financement et l’autorisation requise après le rezonage.","pt":"O processo de planeamento proposto, o financiamento e a aprovação necessária após o rezoneamento.","tr":"Önerilen planlama süreci, finansman ve yeniden imar sonrasındaki onay gerekliliği."},"id":"reported-data","methodology":{"ar":"تستند الأرقام والتواريخ إلى إعلان حكومة نيو ساوث ويلز. ولا تُعرض السعة المقترحة للقطع على أنها مساكن معتمدة أو مكتملة.","de":"Zahlen und Termine stammen aus der Mitteilung der Regierung von New South Wales. Eine vorgeschlagene Grundstückskapazität wird nicht als genehmigter oder fertiggestellter Wohnraum dargestellt.","en":"Figures and dates come from the NSW Government announcement. A proposed lot capacity is not represented as approved or completed housing.","es":"Las cifras y fechas proceden del anuncio del Gobierno de Nueva Gales del Sur. La capacidad propuesta de parcelas no se presenta como vivienda aprobada o terminada.","fr":"Les chiffres et les dates proviennent de l’annonce du gouvernement de la Nouvelle-Galles du Sud. La capacité proposée en lots n’est pas présentée comme un nombre de logements approuvés ou achevés.","pt":"Os números e as datas provêm do anúncio do Governo de Nova Gales do Sul. A capacidade proposta de lotes não é apresentada como habitação aprovada ou concluída.","tr":"Rakamlar ve tarihler New South Wales Hükümeti duyurusundan alınmıştır. Önerilen parsel kapasitesi, onaylanmış veya tamamlanmış konut olarak sunulmamaktadır."},"rowTranslations":[{"detail":{"ar":"143 طريق نورث آرم، مورويلومبا، ضمن منطقة حكومة تويد المحلية.","de":"143 North Arm Road, Murwillumbah, im Verwaltungsgebiet Tweed.","en":"143 North Arm Road, Murwillumbah, in the Tweed local government area.","es":"143 North Arm Road, Murwillumbah, en el área de gobierno local de Tweed.","fr":"143 North Arm Road, Murwillumbah, dans la zone d’administration locale de Tweed.","pt":"143 North Arm Road, Murwillumbah, na área de governo local de Tweed.","tr":"Tweed yerel yönetim bölgesinde, Murwillumbah, 143 North Arm Road."},"item":{"ar":"الموقع","de":"Standort","en":"Site","es":"Emplazamiento","fr":"Site","pt":"Local","tr":"Konum"}},{"detail":{"ar":"ما يصل إلى 230 قطعة سكنية إذا تمت الموافقة على مقترح إعادة التقسيم.","de":"Bis zu 230 Wohngrundstücke, sofern der Umwidmungsvorschlag genehmigt wird.","en":"Up to 230 residential lots if the rezoning proposal is approved.","es":"Hasta 230 parcelas residenciales si se aprueba la propuesta de recalificación.","fr":"Jusqu’à 230 lots résidentiels si le projet de rezonage est approuvé.","pt":"Até 230 lotes residenciais se a proposta de rezoneamento for aprovada.","tr":"Yeniden imar önerisi onaylanırsa en fazla 230 konut parseli."},"item":{"ar":"السعة المحتملة","de":"Mögliche Kapazität","en":"Potential capacity","es":"Capacidad potencial","fr":"Capacité potentielle","pt":"Capacidade potencial","tr":"Olası kapasite"}},{"detail":{"ar":"نحو 7 ملايين دولار أسترالي لعملية إعادة التقسيم ودراسات البنية التحتية التمكينية.","de":"Rund 7 Millionen australische Dollar für das Umwidmungsverfahren und Untersuchungen zur Erschließungsinfrastruktur.","en":"Approximately A$7 million for the rezoning process and enabling infrastructure investigations.","es":"Aproximadamente 7 millones de dólares australianos para el proceso de recalificación y los estudios de infraestructura habilitante.","fr":"Environ 7 millions de dollars australiens pour le processus de rezonage et les études sur les infrastructures nécessaires.","pt":"Cerca de 7 milhões de dólares australianos para o processo de rezoneamento e estudos de infraestruturas habilitadoras.","tr":"Yeniden imar süreci ve altyapıyı mümkün kılacak incelemeler için yaklaşık 7 milyon Avustralya doları."},"item":{"ar":"دعم الولاية","de":"Unterstützung des Bundesstaates","en":"State support","es":"Apoyo estatal","fr":"Soutien de l’État","pt":"Apoio estadual","tr":"Eyalet desteği"}},{"detail":{"ar":"من 12 نوفمبر إلى 10 ديسمبر 2026.","de":"12. November bis 10. Dezember 2026.","en":"12 November to 10 December 2026.","es":"Del 12 de noviembre al 10 de diciembre de 2026.","fr":"Du 12 novembre au 10 décembre 2026.","pt":"De 12 de novembro a 10 de dezembro de 2026.","tr":"12 Kasım - 10 Aralık 2026."},"item":{"ar":"فترة التشاور","de":"Konsultationszeitraum","en":"Consultation period","es":"Periodo de consulta","fr":"Période de consultation","pt":"Período de consulta","tr":"Görüş süresi"}},{"detail":{"ar":"أوائل 2027، بعد تقييم مستقل للمقترح والملاحظات.","de":"Anfang 2027 nach unabhängiger Prüfung des Vorschlags und der Stellungnahmen.","en":"Early 2027, following independent assessment of the proposal and submissions.","es":"A comienzos de 2027, tras una evaluación independiente de la propuesta y las observaciones.","fr":"Début 2027, après une évaluation indépendante du projet et des contributions.","pt":"Início de 2027, após avaliação independente da proposta e das contribuições.","tr":"Öneri ve başvuruların bağımsız değerlendirmesinden sonra 2027 başı."},"item":{"ar":"قرار إعادة التقسيم المتوقع","de":"Erwartete Umwidmungsentscheidung","en":"Expected rezoning decision","es":"Decisión de recalificación prevista","fr":"Décision de rezonage attendue","pt":"Decisão de rezoneamento esperada","tr":"Beklenen yeniden imar kararı"}},{"detail":{"ar":"يتطلب أي تطوير مستقبلي تقييماً وموافقة منفصلين من مجلس تويد شاير.","de":"Jede künftige Entwicklung erfordert eine gesonderte Prüfung und Genehmigung durch den Tweed Shire Council.","en":"Any future development would require separate assessment and approval by Tweed Shire Council.","es":"Todo desarrollo futuro requerirá una evaluación y aprobación independientes del Tweed Shire Council.","fr":"Tout aménagement futur nécessitera une évaluation et une approbation distinctes du Tweed Shire Council.","pt":"Qualquer empreendimento futuro exigirá avaliação e aprovação separadas do Tweed Shire Council.","tr":"Gelecekteki her türlü geliştirme için Tweed Shire Council tarafından ayrı değerlendirme ve onay gerekir."},"item":{"ar":"موافقة إضافية","de":"Weitere Genehmigung","en":"Further approval","es":"Aprobación adicional","fr":"Autorisation supplémentaire","pt":"Aprovação adicional","tr":"İlave onay"}}],"rows":[{"detail":"143 North Arm Road, Murwillumbah, in the Tweed local government area.","item":"Site"},{"detail":"Up to 230 residential lots if the rezoning proposal is approved.","item":"Potential capacity"},{"detail":"Approximately A$7 million for the rezoning process and enabling infrastructure investigations.","item":"State support"},{"detail":"12 November to 10 December 2026.","item":"Consultation period"},{"detail":"Early 2027, following independent assessment of the proposal and submissions.","item":"Expected rezoning decision"},{"detail":"Any future development would require separate assessment and approval by Tweed Shire Council.","item":"Further approval"}],"sourceUrls":["https://www.nsw.gov.au/ministerial-releases/have-your-say-flood-safe-rezoning-to-unlock-up-to-230-homes-murwillumbah"],"title":{"ar":"مراحل إعادة تقسيم طريق نورث آرم","de":"Meilensteine der Umwidmung an der North Arm Road","en":"North Arm Road rezoning milestones","es":"Hitos de la recalificación de North Arm Road","fr":"Étapes du projet de rezonage de North Arm Road","pt":"Etapas do rezoneamento de North Arm Road","tr":"North Arm Road yeniden imar sürecinin aşamaları"},"type":"table","updatedAt":"2026-11-12T16:10:00Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026/data/reported-data?lang=pt&format=csv","json":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026/data/reported-data?lang=pt&format=json"},"id":"reported-data"}],"data_types":["table"],"editorial_illustration":{"alt":"Ilustração conceitual de transportes, pontes e conexões de infraestrutura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"pt","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-b4c6fc7d-5908-57c4-8dbd-1a23e26b8fda","event_period":"2026-11-12","event_period_basis":"event-or-reference-period","id":"murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026","image":null,"importance":0.6,"language":"pt","modified_at":"2026-11-12T17:28:41+00:00","publication_basis":"publication-record","published_at":"2026-11-12T17:28:41+00:00","reading_minutes":4,"region":"world","relations":[],"section_illustration":{"alt":"Ilustração conceitual de transportes, pontes e conexões de infraestrutura.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"pt","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026","sources":[{"checkedAt":"2026-11-12","name":"NSW Government, Have your say: flood-safe rezoning to unlock up to 230 homes in Murwillumbah","publishedAt":"2026-11-12","url":"https://www.nsw.gov.au/ministerial-releases/have-your-say-flood-safe-rezoning-to-unlock-up-to-230-homes-murwillumbah"}],"summary":"Nova Gales do Sul abriu uma consulta sobre o rezoneamento proposto de 143 North Arm Road, perto de Murwillumbah. O plano poderá permitir até 230 lotes residenciais, mas o rezoneamento é apenas uma etapa inicial do planeamento e qualquer empreendimento exigiria aprovação separada do conselho municipal.","text":"Nova Gales do Sul abriu uma consulta sobre o rezoneamento proposto de 143 North Arm Road, perto de Murwillumbah. O plano poderá permitir até 230 lotes residenciais, mas o rezoneamento é apenas uma etapa inicial do planeamento e qualquer empreendimento exigiria aprovação separada do conselho municipal.\n\nO Governo de Nova Gales do Sul abriu uma consulta pública sobre o rezoneamento proposto de 143 North Arm Road, a oeste do centro urbano consolidado de Murwillumbah. A NSW Reconstruction Authority apoia a proposta através do Resilient Lands Program. Se for aprovado, o rezoneamento poderá abrir caminho para até 230 lotes residenciais. A consulta decorre de 12 de novembro a 10 de dezembro de 2026, e o governo afirma que uma avaliação independente contribuirá para uma decisão esperada no início de 2027. Estes são resultados de planeamento propostos, não lotes aprovados nem casas em construção.\n\nO estado afirma que o local fica próximo de escolas, serviços de saúde, lojas e instalações comunitárias existentes e foi identificado como uma oportunidade habitacional em terreno descrito como seguro contra cheias. O governo comprometeu aproximadamente 7 milhões de dólares australianos para apoiar o processo de rezoneamento e contribuir para infraestruturas habilitadoras. Esse financiamento destina-se a estudos técnicos sobre cheias, biodiversidade, transportes, águas pluviais, infraestruturas e património cultural. O anúncio não afirma que os 7 milhões de dólares australianos constituem o custo total de desenvolvimento do local nem que o financiamento da construção esteja assegurado.\n\nA alegação de resiliência às cheias é uma justificação de planeamento que terá de ser sustentada por provas técnicas. O risco de cheia pode variar dentro do terreno e depender da profundidade da água, da velocidade do fluxo, das vias de acesso, da drenagem, das condições climáticas futuras e da resiliência dos serviços públicos. O comunicado informa que a proposta e os documentos técnicos de apoio estão disponíveis para comentários públicos. Porém, o próprio anúncio não publica um plano final de loteamento nem uma avaliação de engenharia completa. A consulta é uma oportunidade para analisar esses materiais antes de uma decisão de rezoneamento, e não um sinal de que todas as preocupações foram resolvidas.\n\nA proposta surge após os grandes impactos das cheias em Northern Rivers e integra um esforço mais amplo de recuperação e uso do solo. O objetivo declarado é aumentar as opções habitacionais e permitir que as pessoas mantenham ligações com a família, o trabalho e os serviços locais. A eventual melhoria da oferta habitacional regional dependerá de mais do que uma alteração do zoneamento. Uma aprovação futura terá de abordar estradas, sistemas de água e saneamento, drenagem, acesso de emergência e eventuais restrições ambientais ou patrimoniais. O estado afirma que qualquer empreendimento posterior exige avaliação e aprovação adicionais do Tweed Shire Council.\n\nO processo tem várias etapas jurídicas e práticas distintas. A consulta atual diz respeito a um rezoneamento proposto. Uma avaliação independente analisará as contribuições e as provas, seguindo-se uma decisão estadual esperada no início de 2027. Se o rezoneamento avançar, o promotor ainda terá de apresentar planos e obter as aprovações municipais separadas necessárias para o loteamento e a construção. Assim, o máximo anunciado de 230 lotes representa uma capacidade potencial associada à proposta. Não é um compromisso de construção, uma contagem de habitações concluídas nem uma previsão de ocupação.\n\nA participação pública pode influenciar as informações exigidas e os impactos que precisam de mais estudo. Os residentes poderão centrar-se no trânsito, na evacuação em caso de cheia, na drenagem, nas áreas de vegetação, nas instalações comunitárias ou nos efeitos da alteração do uso do solo junto à localidade. O governo afirma que os estudos técnicos abrangem vários destes temas, mas não descreve as contribuições recebidas nem as conclusões futuras do avaliador independente. Uma análise sólida deve divulgar os mapas e pressupostos subjacentes e explicar o comportamento do local em diferentes cenários de cheia.\n\nOs próximos passos mensuráveis são o encerramento das contribuições em 10 de dezembro e a decisão esperada no início de 2027. Se o governo aprovar o rezoneamento, será necessário identificar exatamente as regras de uso do solo adotadas e explicar quaisquer condições. Se a proposta for rejeitada ou revista, esse resultado também deve ser apresentado em relação à proposta original. Por enquanto, o facto verificado é uma consulta apoiada por 7 milhões de dólares australianos para trabalhos de planeamento e estudos técnicos, com capacidade potencial máxima de 230 lotes residenciais. A fonte não demonstra que essas casas já estejam aprovadas ou que a proteção contra cheias esteja garantida.","title":"Proposta de rezoneamento em Murwillumbah entra em consulta para até 230 lotes","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026"},{"api_url":"https://newsverum.com/api/v1/articles/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026"}],"url":"https://newsverum.com/pt/news/murwillumbah-north-arm-road-flood-safe-rezoning-consultation-2026"},"version":"1"}
