{"article":{"annotation":{"article_id":"mendez-alvaro-station-remodel-design-agreement-extended-2026","available_at":"2026-10-20T23:02:21.919194Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"eb14cad87f59c83def51fd26ac7467bedb4fdd703d695cfad39817820519212d","input_sha256":"a3e0b29bc3fe5000586a770c1a83ca70299296b7ae936b786a7c207321de9c93","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"ES","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21754"]}],"geometry":null,"id":"iso3166-1:ES","kind":"country-or-area","labels":{"ar":"إسبانيا","en":"Spain","es":"España","fr":"Espagne"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null},{"admin1":null,"city":"Madrid","coordinate_note":"UNGEGN city reference point from the cited source; source does not publish a positional uncertainty. Approximate gazetteer point only, not a city boundary, facility, project site, event location, or coverage footprint.","coordinate_reference_system":"OGC:CRS84","coordinate_source":"United Nations Cartographic Section","country":"ES","evidence":[{"field":"en.title+en.summary+en.body+country","language":"en","note":"Explicit article mention: Madrid. Country agrees with the preserved article scope. Gazetteer reference only; event location is unconfirmed.","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21754","https://ungegn.un.org/dashboard/cities/details?id=134","https://ungegn-api.azurewebsites.net/API/GetCitiesDetails/134"]}],"geometry":{"coordinates":[-3.67527502171,40.4521752248],"type":"Point"},"id":"ungegn-city:134","kind":"city","labels":{"ar":"مدريد","en":"Madrid","es":"Madrid","fr":"Madrid"},"match_status":"candidate","precision":"approximate","role":"source-mentioned-place","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21754"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"},{"concept_id":"medtop:20000340","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: Metro","source_urls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21754"]}],"method":"controlled-rules-v1","rule_id":"railway-transport","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026?lang=fr","category":"infrastructure","content":{"key_points":[],"paragraphs":["L’accord confie la préparation du projet à ADIF, Metro apportant des éléments techniques et une part du financement. Le texte indique que l’étude est toujours en cours.","ADIF assumera 106 391 euros hors TVA de coûts supplémentaires qui lui sont propres, sans augmenter l’engagement financier de Metro. L’accord est prolongé de trois ans."],"sections":[]},"corrections":[],"country":"ES","data":{"blocks":[{"columns":[{"key":"indicator","label":{"ar":"المؤشر","de":"Kennzahl","en":"Indicator","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Gösterge"},"language":"en","type":"text"},{"key":"value","label":{"ar":"القيمة","de":"Wert","en":"Value","es":"Valor","fr":"Valeur","pt":"Valor","tr":"Değer"},"type":"number","unit":"EUR"}],"description":{"ar":"قيمة المشروع الواردة في القرار الرسمي.","de":"Im amtlichen Beschluss genannter Projektwert.","en":"Project value stated in the official decision.","es":"Valor del proyecto indicado en la resolución oficial.","fr":"Valeur du projet indiquée dans la décision officielle.","pt":"Valor do projeto informado na decisão oficial.","tr":"Resmî kararda açıklanan proje değeri."},"id":"project-data","methodology":{"ar":"نقلت القيمة من المصدر؛ ولا ينبغي تفسيرها على أنها إنتاج محقق أو بناء مكتمل.","de":"Wert aus der Quelle übernommen; er bezeichnet weder tatsächliche Erzeugung noch abgeschlossene Bauarbeiten.","en":"Value transcribed from the source; it must not be read as realized generation or completed construction.","es":"Valor transcrito de la fuente; no debe interpretarse como generación realizada ni obra terminada.","fr":"Valeur transcrite de la source ; elle ne signifie ni production réalisée ni construction achevée.","pt":"Valor transcrito da fonte; não representa geração realizada nem obra concluída.","tr":"Kaynak metindeki değer aynen aktarılmıştır; gerçekleşmiş üretim veya tamamlanmış inşaat olarak yorumlanmamalıdır."},"rowTranslations":[{"indicator":{"ar":"التكلفة الإضافية المقدرة","de":"Geschätzte Zusatzkosten","en":"Estimated additional cost","es":"Coste adicional estimado","fr":"Coût supplémentaire estimé","pt":"Custo adicional estimado","tr":"Tahmini ek maliyet"}}],"rows":[{"indicator":"Estimated additional cost","value":106391}],"sourceUrls":["https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21754"],"title":{"ar":"بيانات المشروع في القرار","de":"Projektangabe in der Entscheidung","en":"Project figure in decision","es":"Dato del proyecto en la resolución","fr":"Donnée du projet dans la décision","pt":"Dado do projeto na decisão","tr":"Kararda belirtilen proje verisi"},"type":"table","updatedAt":"2026-10-20T22:19:21Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026/data/project-data?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026/data/project-data?lang=fr&format=json"},"id":"project-data"}],"data_types":["table"],"editorial_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-90a3f823-c134-546d-b251-1f42740f8c14","event_period":"2026-10-19","event_period_basis":"event-or-reference-period","id":"mendez-alvaro-station-remodel-design-agreement-extended-2026","image":null,"importance":0.6,"language":"fr","modified_at":"2026-10-20T23:01:23+00:00","publication_basis":"publication-record","published_at":"2026-10-20T23:01:23+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Illustration conceptuelle des transports, des ponts et des réseaux d’infrastructures.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"mendez-alvaro-station-remodel-design-agreement-extended-2026","sources":[{"checkedAt":"2026-10-21","name":"Boletín Oficial del Estado (BOE)","publishedAt":"2026-10-19","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21754"}],"summary":"Le BOE a publié le 19 octobre un avenant à l’accord entre ADIF et Metro de Madrid pour préparer un projet commun de rénovation des gares de Méndez Álvaro.","text":"Le BOE a publié le 19 octobre un avenant à l’accord entre ADIF et Metro de Madrid pour préparer un projet commun de rénovation des gares de Méndez Álvaro.\n\nL’accord confie la préparation du projet à ADIF, Metro apportant des éléments techniques et une part du financement. Le texte indique que l’étude est toujours en cours.\n\nADIF assumera 106 391 euros hors TVA de coûts supplémentaires qui lui sont propres, sans augmenter l’engagement financier de Metro. L’accord est prolongé de trois ans.","title":"L’accord d’étude des gares de Méndez Álvaro prolongé de trois ans","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/mendez-alvaro-station-remodel-design-agreement-extended-2026"},{"api_url":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/mendez-alvaro-station-remodel-design-agreement-extended-2026"},{"api_url":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/mendez-alvaro-station-remodel-design-agreement-extended-2026"},{"api_url":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/mendez-alvaro-station-remodel-design-agreement-extended-2026"},{"api_url":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/mendez-alvaro-station-remodel-design-agreement-extended-2026"},{"api_url":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/mendez-alvaro-station-remodel-design-agreement-extended-2026"},{"api_url":"https://newsverum.com/api/v1/articles/mendez-alvaro-station-remodel-design-agreement-extended-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/mendez-alvaro-station-remodel-design-agreement-extended-2026"}],"url":"https://newsverum.com/fr/news/mendez-alvaro-station-remodel-design-agreement-extended-2026"},"version":"1"}
