{"article":{"annotation":{"article_id":"malaysia-construction-work-done-q3-2026","available_at":"2026-11-12T17:29:03.332282Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"293ec5da668b87e03779a672909268bebe1defea50155ce60acd29d6b3c6110e","input_sha256":"c6f7cdc603183f0b9d8645fa0609897f9c38a86607ef6db99296f7b68d62a815","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"MY","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.dosm.gov.my/portal-main/release-content/construction-statistics-q32026"]}],"geometry":null,"id":"iso3166-1:MY","kind":"country-or-area","labels":{"ar":"ماليزيا","en":"Malaysia","es":"Malasia","fr":"Malaisie"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001368","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: residential buildings","source_urls":["https://www.dosm.gov.my/portal-main/release-content/construction-statistics-q32026"]}],"method":"controlled-rules-v1","rule_id":"residential-real-estate","status":"candidate"},{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.dosm.gov.my/portal-main/release-content/construction-statistics-q32026"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026?lang=en","category":"infrastructure","content":{"key_points":[],"paragraphs":["Malaysia’s construction sector recorded RM49.5 billion in work done during the third quarter of 2026, 9.0 per cent more than a year earlier, the Department of Statistics Malaysia reported on 12 November. The quarterly gain was broad but uneven. Non-residential building work expanded 21.1 per cent year on year, special trade activities rose 13.2 per cent, residential building work increased 2.7 per cent and civil engineering work rose 2.2 per cent. The reported value also advanced 3.6 per cent from the second quarter.","The category mix helps explain why the headline growth should not be read as an across-the-board construction boom. Civil engineering remained the largest sub-sector by value at RM16.9 billion, or 34.1 per cent of work done. It included RM9.4 billion in utility projects and RM5.6 billion in roads and railways. Non-residential buildings contributed RM15.7 billion, while residential buildings accounted for RM10.7 billion. Special trade activities contributed RM6.2 billion, with electrical installation, site preparation and plumbing, heating and air-conditioning among the listed activities.","Private projects represented RM33.3 billion, or 67.2 per cent of the total, and grew 12.7 per cent year on year. The increase was led by non-residential buildings, where private-sector work grew 21.8 per cent. Private civil engineering work also returned to growth, rising 8.7 per cent after contracting 6.8 per cent in the prior quarter. Public-sector work reached RM16.3 billion, or 32.8 per cent of the total, and increased 2.2 per cent. Its non-residential sub-sector rebounded from a contraction in the previous quarter.","Construction activity was geographically concentrated. Selangor accounted for RM11.2 billion, or 22.7 per cent, followed by Johor at RM10.1 billion, or 20.5 per cent. Sarawak contributed RM5.7 billion and the Federal Territories RM5.0 billion. Together those four areas represented 64.7 per cent of work done. The concentration reflects the location of large projects and building activity, but the release does not attribute the state totals to individual schemes or provide a project-by-project breakdown.","The nine-month total reached RM143.9 billion, 8.8 per cent higher than in the first three quarters of 2025. That pace was slower than the 13.3 per cent growth recorded for the comparable 2025 period. Special trade activities grew 18.3 per cent and non-residential buildings 15.8 per cent over the first three quarters. The comparison shows continued expansion, alongside a moderation in year-to-date growth from the prior year’s faster pace.","DOSM’s measure is the value of construction work done, grouped by type of project, ownership and location. It records activity carried out during the reference quarter. It is not a count of permits, an order book, a measure of new contract awards or proof that all budgeted project costs have been paid. A rise in work done can reflect the execution of previously awarded contracts. This distinction matters when the data are compared with procurement releases or announced investment pipelines.","The gap between private and public growth is also not a direct measure of public investment policy. Public work remained a third of the total, and the public non-residential category recovered after a weak previous quarter. The private share was larger and expanded faster, but quarterly movements can vary with the timing and progress of large projects. The department’s tables identify categories and locations rather than the financing arrangements behind each construction site.","For infrastructure suppliers, contractors and lenders, the mix suggests where activity was reported, not where future tenders will necessarily appear. Utility, road and rail work comprised much of civil engineering value, while office, commercial and other non-residential construction drove the strongest growth rate. Any forecast about contractor demand or procurement deadlines would require tender notices, project schedules and contract documents. The statistical release itself does not announce new awards or change any project’s procurement status.","The data provide a timely snapshot of construction production in a region where manufacturing, logistics and urban development are important. Yet the headline value is nominal unless adjusted through other measures, so it should not be treated automatically as real volume growth. The release reports work done values and growth rates by sub-sector, but a price-adjusted construction output index would be needed to separate price movements from quantity changes. It also does not identify whether growth was driven by a small number of large projects or a wider increase in activity.","The verified finding is that Malaysia’s measured construction work rose to RM49.5 billion in Q3 and that growth was led by non-residential buildings, private activity and four concentrated states. The year-to-date increase remained positive but was below the pace of the first three quarters of 2025. The report is useful for tracking current production and project mix. Procurement status, completion rates and the real purchasing power of the total require separate sources and should not be inferred from the headline figure."],"sections":[]},"corrections":[],"country":"MY","data":{"blocks":[{"columns":[{"key":"item","label":{"ar":"المقياس","de":"Kennzahl","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Gösterge"},"language":"en","type":"text"},{"key":"detail","label":{"ar":"القيمة أو النطاق المنشور","de":"Gemeldeter Wert oder Umfang","en":"Reported value or scope","es":"Valor o alcance comunicado","fr":"Valeur ou périmètre publié","pt":"Valor ou escopo divulgado","tr":"Bildirilen değer veya kapsam"},"language":"en","type":"text"}],"description":{"ar":"أرقام مختارة منقولة من المصدر الأولي.","de":"Ausgewählte Angaben aus der Primärquelle.","en":"Selected figures transcribed from the primary source.","es":"Cifras seleccionadas transcritas de la fuente primaria.","fr":"Chiffres sélectionnés et repris de la source primaire.","pt":"Valores selecionados transcritos da fonte primária.","tr":"Birincil kaynaktan aktarılan seçili rakamlar."},"id":"reported-data","methodology":{"ar":"تعكس الأرقام المصدر المذكور وتحافظ على فترته ونطاقه وتعريفاته. ويُشار في المقال إلى أي حساب مشتق.","de":"Die Zahlen sind der zitierten Quelle entnommen und behalten deren Zeitraum, Umfang und Definitionen bei. Abgeleitete Berechnungen sind im Artikel gekennzeichnet.","en":"Figures are reproduced from the cited source. They retain its stated period, scope and definitions; any derived calculation is identified in the article.","es":"Las cifras reproducen la fuente citada y mantienen su periodo, alcance y definiciones. El artículo identifica los cálculos derivados.","fr":"Les chiffres reproduisent la source citée et conservent sa période, son périmètre et ses définitions. Tout calcul dérivé est signalé dans l’article.","pt":"Os valores reproduzem a fonte citada e mantêm o período, o escopo e as definições nela indicados. O artigo identifica qualquer cálculo derivado.","tr":"Rakamlar kaynakta bildirildiği biçimiyle aktarılmış, dönem, kapsam ve tanımlar korunmuştur. Türetilmiş hesaplamalar haberde açıkça belirtilmiştir."},"rowTranslations":[{"detail":{"ar":"49.5 مليار رينغيت في الربع الثالث من 2026، بزيادة سنوية 9.0%.","de":"49,5 Milliarden Ringgit im dritten Quartal 2026, 9,0 Prozent mehr als im Vorjahr.","en":"RM49.5 billion in Q3 2026, up 9.0% year on year.","es":"49.500 millones de ringgits en el tercer trimestre de 2026, un 9,0 % más interanual.","fr":"49,5 milliards de ringgits au troisième trimestre 2026, en hausse annuelle de 9,0 %.","pt":"RM 49,5 bilhões no terceiro trimestre de 2026, alta anual de 9,0%.","tr":"2026’nın üçüncü çeyreğinde 49,5 milyar RM; yıllık yüzde 9,0 artış."},"item":{"ar":"أعمال البناء المنفذة","de":"Ausgeführte Bauarbeiten","en":"Construction work done","es":"Obras de construcción ejecutadas","fr":"Travaux de construction réalisés","pt":"Obras de construção realizadas","tr":"İş bitirme değeri"}},{"detail":{"ar":"الهندسة المدنية: 16.9 مليار رينغيت، أي 34.1% من إجمالي الأعمال المنفذة.","de":"Tiefbau: 16,9 Milliarden Ringgit oder 34,1 Prozent der ausgeführten Arbeiten.","en":"Civil engineering: RM16.9 billion, equal to 34.1% of total work done.","es":"Ingeniería civil: 16.900 millones de ringgits, el 34,1 % de las obras ejecutadas.","fr":"Génie civil : 16,9 milliards de ringgits, soit 34,1 % des travaux réalisés.","pt":"Engenharia civil: RM 16,9 bilhões, equivalentes a 34,1% das obras realizadas.","tr":"İnşaat mühendisliği: 16,9 milyar RM; toplam gerçekleşen işlerin yüzde 34,1’i."},"item":{"ar":"أكبر قطاع فرعي","de":"Größter Teilsektor","en":"Largest sub-sector","es":"Mayor subsector","fr":"Plus grand sous-secteur","pt":"Maior subsetor","tr":"En büyük alt sektör"}},{"detail":{"ar":"القطاع الخاص 33.3 مليار رينغيت، بزيادة 12.7%؛ القطاع العام 16.3 ملياراً، بزيادة 2.2%.","de":"Privat 33,3 Milliarden Ringgit, plus 12,7 Prozent; öffentlich 16,3 Milliarden, plus 2,2 Prozent.","en":"Private sector RM33.3 billion, up 12.7%; public sector RM16.3 billion, up 2.2%.","es":"Privadas: 33.300 millones de ringgits, +12,7 %; públicas: 16.300 millones, +2,2 %.","fr":"Privé : 33,3 milliards de ringgits, +12,7 % ; public : 16,3 milliards, +2,2 %.","pt":"Privadas: RM 33,3 bilhões, alta de 12,7%; públicas: RM 16,3 bilhões, alta de 2,2%.","tr":"Özel sektör 33,3 milyar RM, yüzde 12,7 artış; kamu sektörü 16,3 milyar RM, yüzde 2,2 artış."},"item":{"ar":"الأعمال الخاصة والعامة","de":"Private und öffentliche Arbeiten","en":"Private and public work","es":"Obras privadas y públicas","fr":"Travaux privés et publics","pt":"Obras privadas e públicas","tr":"Özel ve kamu işleri"}},{"detail":{"ar":"143.9 مليار رينغيت، بزيادة 8.8% عن الفترة نفسها من 2025.","de":"143,9 Milliarden Ringgit, 8,8 Prozent mehr als im gleichen Zeitraum 2025.","en":"RM143.9 billion, up 8.8% from the same 2025 period.","es":"143.900 millones de ringgits, un 8,8 % más que en el mismo periodo de 2025.","fr":"143,9 milliards de ringgits, en hausse de 8,8 % sur la même période de 2025.","pt":"RM 143,9 bilhões, alta de 8,8% em relação ao mesmo período de 2025.","tr":"143,9 milyar RM; 2025’in aynı dönemine göre yüzde 8,8 artış."},"item":{"ar":"الأشهر التسعة الأولى","de":"Erste drei Quartale","en":"First three quarters","es":"Primeros nueve meses","fr":"Neuf premiers mois","pt":"Primeiros nove meses","tr":"İlk üç çeyrek"}}],"rows":[{"detail":"RM49.5 billion in Q3 2026, up 9.0% year on year.","item":"Construction work done"},{"detail":"Civil engineering: RM16.9 billion, equal to 34.1% of total work done.","item":"Largest sub-sector"},{"detail":"Private sector RM33.3 billion, up 12.7%; public sector RM16.3 billion, up 2.2%.","item":"Private and public work"},{"detail":"RM143.9 billion, up 8.8% from the same 2025 period.","item":"First three quarters"}],"sourceUrls":["https://www.dosm.gov.my/portal-main/release-content/construction-statistics-q32026"],"title":{"ar":"النتائج والمقاييس المنشورة","de":"Gemeldete Ergebnisse und Kennzahlen","en":"Reported results and measures","es":"Resultados y medidas comunicados","fr":"Résultats et mesures publiés","pt":"Resultados e medidas divulgados","tr":"Sonuçlar ve ölçümler"},"type":"table","updatedAt":"2026-11-12T15:38:57Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026/data/reported-data?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026/data/reported-data?lang=en&format=json"},"id":"reported-data"}],"data_types":["table"],"editorial_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-a236ac3c-4057-5909-9b96-a856fad9fb36","event_period":"2026-11-12","event_period_basis":"event-or-reference-period","id":"malaysia-construction-work-done-q3-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-11-12T17:28:41+00:00","publication_basis":"publication-record","published_at":"2026-11-12T17:28:41+00:00","reading_minutes":5,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of transport, bridges and infrastructure connections.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"malaysia-construction-work-done-q3-2026","sources":[{"checkedAt":"2026-11-12","name":"Department of Statistics Malaysia, Construction Statistics Third Quarter 2026","publishedAt":"2026-11-12","url":"https://www.dosm.gov.my/portal-main/release-content/construction-statistics-q32026"}],"summary":"Malaysia’s Department of Statistics recorded RM49.5 billion in construction work done during the third quarter, led by non-residential buildings and special trade activities. The value is a production measure, not the amount of new contracts awarded.","text":"Malaysia’s Department of Statistics recorded RM49.5 billion in construction work done during the third quarter, led by non-residential buildings and special trade activities. The value is a production measure, not the amount of new contracts awarded.\n\nMalaysia’s construction sector recorded RM49.5 billion in work done during the third quarter of 2026, 9.0 per cent more than a year earlier, the Department of Statistics Malaysia reported on 12 November. The quarterly gain was broad but uneven. Non-residential building work expanded 21.1 per cent year on year, special trade activities rose 13.2 per cent, residential building work increased 2.7 per cent and civil engineering work rose 2.2 per cent. The reported value also advanced 3.6 per cent from the second quarter.\n\nThe category mix helps explain why the headline growth should not be read as an across-the-board construction boom. Civil engineering remained the largest sub-sector by value at RM16.9 billion, or 34.1 per cent of work done. It included RM9.4 billion in utility projects and RM5.6 billion in roads and railways. Non-residential buildings contributed RM15.7 billion, while residential buildings accounted for RM10.7 billion. Special trade activities contributed RM6.2 billion, with electrical installation, site preparation and plumbing, heating and air-conditioning among the listed activities.\n\nPrivate projects represented RM33.3 billion, or 67.2 per cent of the total, and grew 12.7 per cent year on year. The increase was led by non-residential buildings, where private-sector work grew 21.8 per cent. Private civil engineering work also returned to growth, rising 8.7 per cent after contracting 6.8 per cent in the prior quarter. Public-sector work reached RM16.3 billion, or 32.8 per cent of the total, and increased 2.2 per cent. Its non-residential sub-sector rebounded from a contraction in the previous quarter.\n\nConstruction activity was geographically concentrated. Selangor accounted for RM11.2 billion, or 22.7 per cent, followed by Johor at RM10.1 billion, or 20.5 per cent. Sarawak contributed RM5.7 billion and the Federal Territories RM5.0 billion. Together those four areas represented 64.7 per cent of work done. The concentration reflects the location of large projects and building activity, but the release does not attribute the state totals to individual schemes or provide a project-by-project breakdown.\n\nThe nine-month total reached RM143.9 billion, 8.8 per cent higher than in the first three quarters of 2025. That pace was slower than the 13.3 per cent growth recorded for the comparable 2025 period. Special trade activities grew 18.3 per cent and non-residential buildings 15.8 per cent over the first three quarters. The comparison shows continued expansion, alongside a moderation in year-to-date growth from the prior year’s faster pace.\n\nDOSM’s measure is the value of construction work done, grouped by type of project, ownership and location. It records activity carried out during the reference quarter. It is not a count of permits, an order book, a measure of new contract awards or proof that all budgeted project costs have been paid. A rise in work done can reflect the execution of previously awarded contracts. This distinction matters when the data are compared with procurement releases or announced investment pipelines.\n\nThe gap between private and public growth is also not a direct measure of public investment policy. Public work remained a third of the total, and the public non-residential category recovered after a weak previous quarter. The private share was larger and expanded faster, but quarterly movements can vary with the timing and progress of large projects. The department’s tables identify categories and locations rather than the financing arrangements behind each construction site.\n\nFor infrastructure suppliers, contractors and lenders, the mix suggests where activity was reported, not where future tenders will necessarily appear. Utility, road and rail work comprised much of civil engineering value, while office, commercial and other non-residential construction drove the strongest growth rate. Any forecast about contractor demand or procurement deadlines would require tender notices, project schedules and contract documents. The statistical release itself does not announce new awards or change any project’s procurement status.\n\nThe data provide a timely snapshot of construction production in a region where manufacturing, logistics and urban development are important. Yet the headline value is nominal unless adjusted through other measures, so it should not be treated automatically as real volume growth. The release reports work done values and growth rates by sub-sector, but a price-adjusted construction output index would be needed to separate price movements from quantity changes. It also does not identify whether growth was driven by a small number of large projects or a wider increase in activity.\n\nThe verified finding is that Malaysia’s measured construction work rose to RM49.5 billion in Q3 and that growth was led by non-residential buildings, private activity and four concentrated states. The year-to-date increase remained positive but was below the pace of the first three quarters of 2025. The report is useful for tracking current production and project mix. Procurement status, completion rates and the real purchasing power of the total require separate sources and should not be inferred from the headline figure.","title":"Malaysia construction work rises 9% to RM49.5 billion in Q3","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/malaysia-construction-work-done-q3-2026"},{"api_url":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/malaysia-construction-work-done-q3-2026"},{"api_url":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/malaysia-construction-work-done-q3-2026"},{"api_url":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/malaysia-construction-work-done-q3-2026"},{"api_url":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/malaysia-construction-work-done-q3-2026"},{"api_url":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/malaysia-construction-work-done-q3-2026"},{"api_url":"https://newsverum.com/api/v1/articles/malaysia-construction-work-done-q3-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/malaysia-construction-work-done-q3-2026"}],"url":"https://newsverum.com/en/news/malaysia-construction-work-done-q3-2026"},"version":"1"}
