{"article":{"annotation":{"article_id":"kbr-keppel-aster-saf-feed-haziran-2026","available_at":"2026-10-11T21:35:19.191579Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"ab544cecc46864e362f134dafe7220add4e5a590aa159bc1ff61eea34b29817c","input_sha256":"bcc1210e486375a3080883b1df017a0422a9a3dc8a3029afe2a7d5588f209356","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20001207","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: SAF","source_urls":["https://www.kbr.com/en-gb/node/11839"]}],"method":"controlled-rules-v1","rule_id":"biofuel","status":"candidate"},{"concept_id":"medtop:13000000","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: technology","source_urls":["https://www.kbr.com/en-gb/node/11839"]}],"method":"controlled-rules-v1","rule_id":"technology","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/kbr-selected-for-keppelaster-saf-technology-and-feed?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["KBR said on June 29 that it was selected for PureSAF technology licensing and FEED services for Keppel and Aster’s Jurong Island SAF project.","This stage is not the plant’s full EPC construction contract. Planned production remains subject to final investment decision and regulatory approvals; a front-end engineering selection does not establish a completed or operating factory."],"sections":[]},"corrections":[{"at":"2026-10-06T21:57:01+03:00","language":"en","text":"The missing language translations for this article have been added."},{"at":"2026-10-07T00:54:37+03:00","language":"en","text":"German and Portuguese editions and translations of the data and correction explanations have been added to this article."}],"country":null,"data":null,"data_downloads":[],"data_types":[],"editorial_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-0ecdb0fa-4211-5081-9ed9-5d3529db4fd5","event_period":"2026-06-29","event_period_basis":"event-or-reference-period","id":"kbr-keppel-aster-saf-feed-haziran-2026","image":null,"importance":0.4,"language":"en","modified_at":"2026-10-07T00:54:37+03:00","publication_basis":"publication-record","published_at":"2026-10-02T21:09:51+03:00","reading_minutes":1,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"kbr-selected-for-keppelaster-saf-technology-and-feed","sources":[{"checkedAt":"2026-10-02","name":"KBR","publishedAt":"2026-06-29","url":"https://www.kbr.com/en-gb/node/11839"}],"summary":"Singapore project announcement covers PureSAF licensing and front-end engineering.","text":"Singapore project announcement covers PureSAF licensing and front-end engineering.\n\nKBR said on June 29 that it was selected for PureSAF technology licensing and FEED services for Keppel and Aster’s Jurong Island SAF project.\n\nThis stage is not the plant’s full EPC construction contract. Planned production remains subject to final investment decision and regulatory approvals; a front-end engineering selection does not establish a completed or operating factory.\n\nThe missing language translations for this article have been added.\n\nGerman and Portuguese editions and translations of the data and correction explanations have been added to this article.","title":"KBR selected for Keppel–Aster SAF technology and FEED","topics":["epc-contractors"],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/kbr-selected-for-keppelaster-saf-technology-and-feed?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/kbr-selected-for-keppelaster-saf-technology-and-feed"},{"api_url":"https://newsverum.com/api/v1/articles/kbr-selected-for-keppelaster-saf-technology-and-feed?lang=en","language":"en","url":"https://newsverum.com/en/news/kbr-selected-for-keppelaster-saf-technology-and-feed"},{"api_url":"https://newsverum.com/api/v1/articles/kbr-selected-for-keppelaster-saf-technology-and-feed?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/kbr-selected-for-keppelaster-saf-technology-and-feed"},{"api_url":"https://newsverum.com/api/v1/articles/kbr-selected-for-keppelaster-saf-technology-and-feed?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/kbr-selected-for-keppelaster-saf-technology-and-feed"},{"api_url":"https://newsverum.com/api/v1/articles/kbr-selected-for-keppelaster-saf-technology-and-feed?lang=es","language":"es","url":"https://newsverum.com/es/news/kbr-selected-for-keppelaster-saf-technology-and-feed"},{"api_url":"https://newsverum.com/api/v1/articles/kbr-selected-for-keppelaster-saf-technology-and-feed?lang=de","language":"de","url":"https://newsverum.com/de/news/kbr-selected-for-keppelaster-saf-technology-and-feed"},{"api_url":"https://newsverum.com/api/v1/articles/kbr-selected-for-keppelaster-saf-technology-and-feed?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/kbr-selected-for-keppelaster-saf-technology-and-feed"}],"url":"https://newsverum.com/en/news/kbr-selected-for-keppelaster-saf-technology-and-feed"},"version":"1"}
