{"article_url":"https://newsverum.com/tr/news/jordan-railway-project-to-carry-thirteen-million-tonnes-of-phosphate","block":{"columns":[{"key":"fact","label":{"ar":"المعلومة","de":"Fakt","en":"Fact","es":"Dato","fr":"Fait","pt":"Fato","tr":"Bilgi"},"language":"en","type":"text"},{"key":"finding","label":{"ar":"القيمة أو النطاق المعلن","de":"Gemeldeter Wert oder Umfang","en":"Reported value or scope","es":"Valor o alcance comunicado","fr":"Valeur ou périmètre rapporté","pt":"Valor ou escopo informado","tr":"Bildirilen değer veya kapsam"},"language":"en","type":"text"}],"description":{"ar":"تفاصيل المشروع التي نسبتْها بترا إلى الديوان الملكي وشركة السكك الحديدية.","de":"Von Petra dem Königshof und dem Bahnunternehmen zugeschriebene Projektdetails.","en":"Project details attributed by Petra to the Royal Court and railway company.","es":"Datos del proyecto atribuidos por Petra a la Corte Real y a la empresa ferroviaria.","fr":"Détails attribués par Petra à la Cour royale et à la société ferroviaire.","pt":"Detalhes do projeto atribuídos pela Petra ao Tribunal Real e à empresa ferroviária.","tr":"Petra haberinde Kraliyet Divanı ve demiryolu şirketine atfedilen proje bilgileri."},"id":"data-jordan-railway-project-to-carry-","methodology":{"ar":"يمثل 13 مليون طن هدفاً سنوياً للمرحلة الأولى، لا شحناً منقولاً بالفعل. ويمثل 360 كيلومتراً طول الشبكة المخطط الأوسع وفق بترا، وليس طول سكة تشغيلية.","de":"Die 13 Millionen Tonnen sind ein jährliches Ziel der ersten Phase und keine bereits transportierte Fracht. Die 360 km bezeichnen die von Petra gemeldete Länge des umfassenderen geplanten Netzes, nicht die Länge bereits betriebener Gleise.","en":"The 13 million tonnes is an annual first-phase target, not cargo already moved. The 360 km is a broader planned network length reported by Petra, not operational track length.","es":"Los 13 millones de toneladas son una meta anual de la primera fase, no carga ya transportada. Los 360 km corresponden a la red planificada más amplia según Petra, no a una vía operativa.","fr":"Les 13 millions de tonnes constituent un objectif annuel de première phase, pas un volume déjà transporté. Les 360 km décrivent le réseau prévu plus large selon Petra, et non une ligne opérationnelle.","pt":"Os 13 milhões de toneladas são uma meta anual da primeira fase, e não carga já transportada. Os 360 km correspondem à extensão da rede planejada mais ampla informada pela Petra, e não à extensão de trilhos em operação.","tr":"13 milyon ton yıllık ilk aşama hedefidir, taşınmış yük değildir. 360 km, Petra’nın aktardığı daha geniş ağ planıdır; mevcut hat uzunluğu veya hizmete alınmış ağ değildir."},"rowTranslations":[{"fact":{"ar":"هدف الشحن للمرحلة الأولى","de":"Frachtziel der ersten Phase","en":"First-phase freight target","es":"Objetivo de transporte de carga de la primera fase","fr":"Objectif de fret de la première phase","pt":"Meta de transporte de carga da primeira fase","tr":"İlk aşama yük taşıma hedefi"},"finding":{"ar":"نحو 13 مليون طن من الفوسفات سنوياً","de":"Etwa 13 Millionen Tonnen Phosphat pro Jahr","en":"About 13 million tonnes of phosphate per year","es":"Unos 13 millones de toneladas de fosfato al año","fr":"Environ 13 millions de tonnes de phosphate par an","pt":"Cerca de 13 milhões de toneladas de fosfato por ano","tr":"Yılda yaklaşık 13 milyon ton fosfat"}},{"fact":{"ar":"المسار","de":"Strecke","en":"Route","es":"Ruta","fr":"Itinéraire","pt":"Rota","tr":"Güzergâh"},"finding":{"ar":"الشيدية–العقبة؛ اتصال بميناء معان البري","de":"Shidiya–Aqaba; Anbindung an den Landhafen Maan","en":"Shidiya–Aqaba; link to Maan Land Port","es":"Shidiya–Aqaba; conexión con el puerto terrestre de Maan","fr":"Shidiya–Aqaba ; liaison avec le port terrestre de Ma’an","pt":"Shidiya–Aqaba; ligação ao Porto Terrestre de Maan","tr":"Şidiye–Akabe; Maan Kara Limanı bağlantısı"}},{"fact":{"ar":"طول الشبكة المخطط","de":"Geplante Netzlänge","en":"Planned network length","es":"Longitud prevista de la red","fr":"Longueur prévue du réseau","pt":"Extensão planejada da rede","tr":"Planlanan ağ uzunluğu"}},{"fact":{"ar":"الشركة المسؤولة عن التنفيذ","de":"Umsetzendes Unternehmen","en":"Implementation company","es":"Empresa responsable de la ejecución","fr":"Société chargée de la mise en œuvre","pt":"Empresa responsável pela implementação","tr":"Uygulamadan sorumlu şirket"}}],"rows":[{"fact":"First-phase freight target","finding":"About 13 million tonnes of phosphate per year"},{"fact":"Route","finding":"Shidiya–Aqaba; link to Maan Land Port"},{"fact":"Planned network length","finding":"360 km"},{"fact":"Implementation company","finding":"UAE–Jordan Railway Company"}],"sourceUrls":["https://pt1.petra.gov.jo/index.php/en/news/king-abu-dhabi-crown-prince-witness-laying-of-foundation-stone-for-aqabashidiyamaan-railway-project"],"title":{"ar":"نطاق مشروع السكك الحديدية","de":"Umfang des Eisenbahnprojekts","en":"Railway project scope","es":"Alcance del proyecto ferroviario","fr":"Périmètre du projet ferroviaire","pt":"Escopo do projeto ferroviário","tr":"Demiryolu projesi kapsamı"},"type":"table","updatedAt":"2026-10-12T06:26:23+03:00"},"version":1}
