{"article_url":"https://newsverum.com/pt/news/india-pumped-storage-capacity-pipeline-expands-2026","block":{"columns":[{"key":"item","label":{"ar":"البند","de":"Messgröße","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Ölçüt"},"language":"en","type":"text"},{"key":"value","label":{"ar":"غيغاواط","de":"Gigawatt","en":"Gigawatts","es":"Gigavatios","fr":"Gigawatts","pt":"Gigawatts","tr":"Gigawatt"},"type":"number","unit":"GW"}],"description":{"ar":"الأرقام كما أوردتها هيئة الكهرباء المركزية ومكتب الإعلام الصحفي.","de":"Angaben der Central Electricity Authority und des PIB.","en":"Figures reported by the Central Electricity Authority and PIB.","es":"Cifras comunicadas por la Autoridad Central de Electricidad y el PIB.","fr":"Chiffres publiés par la Central Electricity Authority et le PIB.","pt":"Valores comunicados pela Autoridade Central de Eletricidade e pelo PIB.","tr":"Merkez Elektrik Kurumu ve PIB’nin bildirdiği değerler."},"id":"release-data","methodology":{"ar":"أُوردت السعات بالغيغاواط مع الفصل بين مراحل المشاريع.","de":"Kapazitäten in GW; Projektphasen werden getrennt gehalten.","en":"Capacity figures are reported in GW; project stages are kept separate.","es":"Capacidades en GW; se mantienen separadas las fases.","fr":"Capacités en GW; les stades des projets restent distincts.","pt":"Capacidades em GW; as fases dos projetos são mantidas separadas.","tr":"Kapasite rakamları kaynakta GW olarak verilmiştir; farklı proje aşamaları ayrı tutulmuştur."},"rowTranslations":[{"item":{"ar":"قيد التشغيل (يوليو 2026)","de":"Betrieb (Juli 2026)","en":"Operational, July 2026","es":"Operativa (julio de 2026)","fr":"En service (juillet 2026)","pt":"Operacional (julho de 2026)","tr":"İşletmede (Temmuz 2026)"}},{"item":{"ar":"قيد الإنشاء أو التنفيذ","de":"Im Bau oder in Umsetzung","en":"Under construction or implementation","es":"En construcción o ejecución","fr":"En construction ou mise en œuvre","pt":"Em construção ou implementação","tr":"İnşaat veya uygulama aşamasında"}},{"item":{"ar":"تمت الموافقة عليها أو تقييمها","de":"Abgestimmt oder bewertet","en":"Concurred or appraised","es":"Acordada o evaluada","fr":"Ayant fait l’objet d’un accord ou d’une évaluation","pt":"Acordada ou avaliada","tr":"Mutabık kalınan veya değerlendirilen"}}],"rows":[{"item":"Operational, July 2026","value":7.43},{"item":"Under construction or implementation","value":15.87},{"item":"Concurred or appraised","value":10.4}],"sourceUrls":["https://www.pib.gov.in/PressNoteDetails.aspx?ModuleId=3&NoteId=160498&id=160498&lang=1&reg=3"],"title":{"ar":"قدرة التخزين بالضخ حسب مرحلة المشروع","de":"Pumpspeicherkapazität nach Projektphase","en":"Pumped-storage capacity by project stage","es":"Capacidad por fase del proyecto","fr":"Capacité de stockage par pompage selon le stade des projets","pt":"Capacidade de armazenamento por fase do projeto","tr":"Proje aşamasına göre pompaj depolama kapasitesi"},"type":"table","updatedAt":"2026-10-20T23:30:37Z"},"version":1}
