{"article":{"annotation":{"article_id":"india-data-centre-capacity-rises-to-1-5gw-framework-2026","available_at":"2026-10-21T00:45:38.706341Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"f8b2557451a0dc4eb59e0c6643156a691be31135d881222f71bea9aa12fda815","input_sha256":"32968fdf8c8bfb3d473658dedcc92cae1fe33dc6b4a1cfecef30de2125194736","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"IN","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.pib.gov.in/PressReleasePage.aspx?PRID=2323840&lang=1&reg=48"]}],"geometry":null,"id":"iso3166-1:IN","kind":"country-or-area","labels":{"ar":"الهند","en":"India","es":"India","fr":"Inde"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:13000000","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.pib.gov.in/PressReleasePage.aspx?PRID=2323840&lang=1&reg=48"]}],"method":"controlled-rules-v1","rule_id":"technology-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=tr","category":"technology","content":{"key_points":[],"paragraphs":["NITI Aayog’un Frontier Tech Hub birimi, eyaletlerin veri merkezi yatırımlarını değerlendirmesine yönelik bir çerçeve yayımladı. Kurum, ülke kapasitesinin 2020’de yaklaşık 375 MW’tan günümüzde yaklaşık 1,5 GW’a çıktığını bildirdi.","Çerçeve; enerji, su ve soğutma, konum ve çevresel sürdürülebilirlik, ekonomik-stratejik değer ile yönetişim ve uygulama başlıklarından oluşuyor. Kurum, yatırımların yalnızca çekilmesini değil kaynak ve altyapı yüklerinin de değerlendirilmesini öneriyor."],"sections":[]},"corrections":[],"country":"IN","data":{"blocks":[{"columns":[{"key":"item","label":{"ar":"البند","de":"Messgröße","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Ölçüt"},"language":"en","type":"text"},{"key":"value","label":{"ar":"ميغاواط","de":"Megawatt","en":"Megawatts","es":"Megavatios","fr":"Mégawatts","pt":"Megawatts","tr":"Megawatt"},"type":"number","unit":"MW"}],"description":{"ar":"سعة مراكز البيانات الوطنية بحسب نيتي آيوغ.","de":"Landesweite Kapazität laut NITI Aayog.","en":"National data-centre capacity as reported by NITI Aayog.","es":"Capacidad nacional según NITI Aayog.","fr":"Capacité nationale des centres de données selon NITI Aayog.","pt":"Capacidade nacional segundo a NITI Aayog.","tr":"NITI Aayog’un bildirdiği ulusal veri merkezi kapasitesi."},"id":"release-data","methodology":{"ar":"قيم تقريبية من المصدر؛ حُوّلت الغيغاواط إلى ميغاواط (1 غيغاواط = 1000 ميغاواط).","de":"Näherungswerte der Quelle; GW in MW dargestellt (1 GW = 1.000 MW).","en":"Approximate source figures; GW value shown in MW (1 GW = 1,000 MW).","es":"Cifras aproximadas de la fuente; el valor en GW se expresa en MW (1 GW = 1.000 MW).","fr":"Valeurs approximatives de la source; le GW est exprimé en MW (1 GW = 1 000 MW).","pt":"Valores aproximados da fonte; o valor em GW é expresso em MW (1 GW = 1.000 MW).","tr":"Kaynakta verilen yaklaşık değerler; GW değeri MW cinsinden 1,500 olarak gösterilmiştir (1 GW = 1,000 MW)."},"rowTranslations":[{"item":{"ar":"السعة (2020)","de":"Kapazität (2020)","en":"2020 capacity","es":"Capacidad (2020)","fr":"Capacité (2020)","pt":"Capacidade (2020)","tr":"Kapasite (2020)"}},{"item":{"ar":"السعة الحالية عند النشر","de":"Aktuelle Kapazität bei Veröffentlichung","en":"Current capacity at publication","es":"Capacidad actual al publicarse","fr":"Capacité actuelle à la publication","pt":"Capacidade atual à data da publicação","tr":"Yayımlanma sırasındaki güncel kapasite"}}],"rows":[{"item":"2020 capacity","value":375},{"item":"Current capacity at publication","value":1500}],"sourceUrls":["https://www.pib.gov.in/PressReleasePage.aspx?PRID=2323840&lang=1&reg=48"],"title":{"ar":"مقارنة السعة","de":"Kapazitätsvergleich","en":"Capacity comparison","es":"Comparación de capacidad","fr":"Comparaison des capacités","pt":"Comparação de capacidade","tr":"Kapasite karşılaştırması"},"type":"table","updatedAt":"2026-10-20T23:30:37Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026/data/release-data?lang=tr&format=csv","json":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026/data/release-data?lang=tr&format=json"},"id":"release-data"}],"data_types":["table"],"editorial_illustration":{"alt":"Teknoloji, işlemci ve bağlantılı bilginin kavramsal illüstrasyonu.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"tr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"event_id":"event-e36a3049-8ddb-54ac-866c-6220d61b7d6f","event_period":"2026-10-14","event_period_basis":"event-or-reference-period","id":"india-data-centre-capacity-rises-to-1-5gw-framework-2026","image":null,"importance":0.6,"language":"tr","modified_at":"2026-10-21T00:44:01+00:00","publication_basis":"publication-record","published_at":"2026-10-21T00:44:01+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Teknoloji, işlemci ve bağlantılı bilginin kavramsal illüstrasyonu.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"tr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"slug":"india-data-centre-capacity-rises-to-1-5gw-framework-2026","sources":[{"checkedAt":"2026-10-21","name":"Press Information Bureau, Government of India","publishedAt":"2026-10-15","url":"https://www.pib.gov.in/PressReleasePage.aspx?PRID=2323840&lang=1&reg=48"}],"summary":"NITI Aayog’un 15 Ekim’de duyurduğu çerçeve, Hindistan’ın veri merkezi kapasitesinin 2020’de yaklaşık 375 MW’tan günümüzde yaklaşık 1,5 GW’a çıktığını belirtti.","text":"NITI Aayog’un 15 Ekim’de duyurduğu çerçeve, Hindistan’ın veri merkezi kapasitesinin 2020’de yaklaşık 375 MW’tan günümüzde yaklaşık 1,5 GW’a çıktığını belirtti.\n\nNITI Aayog’un Frontier Tech Hub birimi, eyaletlerin veri merkezi yatırımlarını değerlendirmesine yönelik bir çerçeve yayımladı. Kurum, ülke kapasitesinin 2020’de yaklaşık 375 MW’tan günümüzde yaklaşık 1,5 GW’a çıktığını bildirdi.\n\nÇerçeve; enerji, su ve soğutma, konum ve çevresel sürdürülebilirlik, ekonomik-stratejik değer ile yönetişim ve uygulama başlıklarından oluşuyor. Kurum, yatırımların yalnızca çekilmesini değil kaynak ve altyapı yüklerinin de değerlendirilmesini öneriyor.","title":"Hindistan’ın veri merkezi kapasitesi 2020’den bu yana dört katına çıktı","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"}],"url":"https://newsverum.com/tr/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},"version":"1"}
