{"article":{"annotation":{"article_id":"india-data-centre-capacity-rises-to-1-5gw-framework-2026","available_at":"2026-10-21T00:45:38.706341Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"f8b2557451a0dc4eb59e0c6643156a691be31135d881222f71bea9aa12fda815","input_sha256":"32968fdf8c8bfb3d473658dedcc92cae1fe33dc6b4a1cfecef30de2125194736","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"IN","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.pib.gov.in/PressReleasePage.aspx?PRID=2323840&lang=1&reg=48"]}],"geometry":null,"id":"iso3166-1:IN","kind":"country-or-area","labels":{"ar":"الهند","en":"India","es":"India","fr":"Inde"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:13000000","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.pib.gov.in/PressReleasePage.aspx?PRID=2323840&lang=1&reg=48"]}],"method":"controlled-rules-v1","rule_id":"technology-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=ar","category":"technology","content":{"key_points":[],"paragraphs":["أصدرت وحدة التقنيات المتقدمة في مؤسسة نيتي آيوغ إطاراً لمساعدة الولايات الهندية على تقييم مقترحات الاستثمار في مراكز البيانات. وقالت إن السعة الوطنية ارتفعت من نحو 375 ميغاواط في 2020 إلى نحو 1.5 غيغاواط حالياً.","ويغطي الإطار خمسة محاور: الطاقة، والمياه والتبريد، واختيار المواقع والاستدامة البيئية، والقيمة الاقتصادية والاستراتيجية، والسياسات والحوكمة والتنفيذ. ويوصي بتقييم احتياجات الموارد والبنية التحتية إلى جانب فرص الاستثمار."],"sections":[]},"corrections":[],"country":"IN","data":{"blocks":[{"columns":[{"key":"item","label":{"ar":"البند","de":"Messgröße","en":"Measure","es":"Indicador","fr":"Indicateur","pt":"Indicador","tr":"Ölçüt"},"language":"en","type":"text"},{"key":"value","label":{"ar":"ميغاواط","de":"Megawatt","en":"Megawatts","es":"Megavatios","fr":"Mégawatts","pt":"Megawatts","tr":"Megawatt"},"type":"number","unit":"MW"}],"description":{"ar":"سعة مراكز البيانات الوطنية بحسب نيتي آيوغ.","de":"Landesweite Kapazität laut NITI Aayog.","en":"National data-centre capacity as reported by NITI Aayog.","es":"Capacidad nacional según NITI Aayog.","fr":"Capacité nationale des centres de données selon NITI Aayog.","pt":"Capacidade nacional segundo a NITI Aayog.","tr":"NITI Aayog’un bildirdiği ulusal veri merkezi kapasitesi."},"id":"release-data","methodology":{"ar":"قيم تقريبية من المصدر؛ حُوّلت الغيغاواط إلى ميغاواط (1 غيغاواط = 1000 ميغاواط).","de":"Näherungswerte der Quelle; GW in MW dargestellt (1 GW = 1.000 MW).","en":"Approximate source figures; GW value shown in MW (1 GW = 1,000 MW).","es":"Cifras aproximadas de la fuente; el valor en GW se expresa en MW (1 GW = 1.000 MW).","fr":"Valeurs approximatives de la source; le GW est exprimé en MW (1 GW = 1 000 MW).","pt":"Valores aproximados da fonte; o valor em GW é expresso em MW (1 GW = 1.000 MW).","tr":"Kaynakta verilen yaklaşık değerler; GW değeri MW cinsinden 1,500 olarak gösterilmiştir (1 GW = 1,000 MW)."},"rowTranslations":[{"item":{"ar":"السعة (2020)","de":"Kapazität (2020)","en":"2020 capacity","es":"Capacidad (2020)","fr":"Capacité (2020)","pt":"Capacidade (2020)","tr":"Kapasite (2020)"}},{"item":{"ar":"السعة الحالية عند النشر","de":"Aktuelle Kapazität bei Veröffentlichung","en":"Current capacity at publication","es":"Capacidad actual al publicarse","fr":"Capacité actuelle à la publication","pt":"Capacidade atual à data da publicação","tr":"Yayımlanma sırasındaki güncel kapasite"}}],"rows":[{"item":"2020 capacity","value":375},{"item":"Current capacity at publication","value":1500}],"sourceUrls":["https://www.pib.gov.in/PressReleasePage.aspx?PRID=2323840&lang=1&reg=48"],"title":{"ar":"مقارنة السعة","de":"Kapazitätsvergleich","en":"Capacity comparison","es":"Comparación de capacidad","fr":"Comparaison des capacités","pt":"Comparação de capacidade","tr":"Kapasite karşılaştırması"},"type":"table","updatedAt":"2026-10-20T23:30:37Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026/data/release-data?lang=ar&format=csv","json":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026/data/release-data?lang=ar&format=json"},"id":"release-data"}],"data_types":["table"],"editorial_illustration":{"alt":"رسم توضيحي مفاهيمي للتكنولوجيا والمعالجات والمعلومات المترابطة.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"ar","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"event_id":"event-e36a3049-8ddb-54ac-866c-6220d61b7d6f","event_period":"2026-10-14","event_period_basis":"event-or-reference-period","id":"india-data-centre-capacity-rises-to-1-5gw-framework-2026","image":null,"importance":0.6,"language":"ar","modified_at":"2026-10-21T00:44:01+00:00","publication_basis":"publication-record","published_at":"2026-10-21T00:44:01+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"رسم توضيحي مفاهيمي للتكنولوجيا والمعالجات والمعلومات المترابطة.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"ar","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"slug":"india-data-centre-capacity-rises-to-1-5gw-framework-2026","sources":[{"checkedAt":"2026-10-21","name":"Press Information Bureau, Government of India","publishedAt":"2026-10-15","url":"https://www.pib.gov.in/PressReleasePage.aspx?PRID=2323840&lang=1&reg=48"}],"summary":"قالت ورقة إطار أطلقتها مؤسسة نيتي آيوغ في 15 أكتوبر إن سعة مراكز البيانات الهندية ارتفعت من نحو 375 ميغاواط في 2020 إلى نحو 1.5 غيغاواط حالياً.","text":"قالت ورقة إطار أطلقتها مؤسسة نيتي آيوغ في 15 أكتوبر إن سعة مراكز البيانات الهندية ارتفعت من نحو 375 ميغاواط في 2020 إلى نحو 1.5 غيغاواط حالياً.\n\nأصدرت وحدة التقنيات المتقدمة في مؤسسة نيتي آيوغ إطاراً لمساعدة الولايات الهندية على تقييم مقترحات الاستثمار في مراكز البيانات. وقالت إن السعة الوطنية ارتفعت من نحو 375 ميغاواط في 2020 إلى نحو 1.5 غيغاواط حالياً.\n\nويغطي الإطار خمسة محاور: الطاقة، والمياه والتبريد، واختيار المواقع والاستدامة البيئية، والقيمة الاقتصادية والاستراتيجية، والسياسات والحوكمة والتنفيذ. ويوصي بتقييم احتياجات الموارد والبنية التحتية إلى جانب فرص الاستثمار.","title":"بلغت سعة مراكز البيانات في الهند نحو 1.5 غيغاواط، أربعة أمثال مستوى 2020","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},{"api_url":"https://newsverum.com/api/v1/articles/india-data-centre-capacity-rises-to-1-5gw-framework-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"}],"url":"https://newsverum.com/ar/news/india-data-centre-capacity-rises-to-1-5gw-framework-2026"},"version":"1"}
