{"article":{"annotation":{"article_id":"granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026","available_at":"2026-10-06T23:11:25.935887Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"459c86192ae9f1d934d9d02e9150a750c4fed82648450784a1a7a1444fdba163","input_sha256":"2cc5c4e201005b143b0dda02ac585b6397963fa6cb2a790843a6e2170d555d32","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"US","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.graniteconstruction.com/newsroom/granite-awarded-two-medicine-road-rehabilitation-project-glacier-national-park"]}],"geometry":null,"id":"iso3166-1:US","kind":"country-or-area","labels":{"ar":"الولايات المتحدة الأمريكية","en":"United States of America","es":"Estados Unidos de América","fr":"États-Unis d’Amérique"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"d28c9c89703b56bd91fd887965d416d0115c2473d4bfbd3e558bcceafc3941dd","schema_version":1,"subjects":[{"concept_id":"medtop:20001245","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.graniteconstruction.com/newsroom/granite-awarded-two-medicine-road-rehabilitation-project-glacier-national-park"]}],"method":"controlled-rules-v1","rule_id":"infrastructure-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026?lang=de","category":"infrastructure","content":{"key_points":[],"paragraphs":["Granite gab am 9. September 2026 bekannt, von der Western Federal Lands Highway Division (WFL) der Federal Highway Administration einen Auftrag zur Sanierung der Two Medicine Road im Glacier-Nationalpark in Montana erhalten zu haben. Das Projekt ist eine Partnerschaft zwischen WFL, dem National Park Service und der Blackfeet Nation und hat einen ungefähren Wert von 23,7 Millionen US-Dollar.","Das Projekt umfasst die Sanierung von 7,22 Meilen der Two Medicine Road, der wichtigsten Zufahrtsstraße zum Two-Medicine-Gebiet des Parks. Zum Auftrag von Granite gehören der Wiederaufbau der Straße, der Rückbau von Straßenabschnitten, eine Schottertragschicht, Asphaltarbeiten mit Heißmischgut, die Wiederherstellung von Parkflächen, Verbesserungen an der Entwässerung, Fahrbahnmarkierungen, die Renaturierung eines Bachlaufs und neue Besuchereinrichtungen. Bei der vollständigen Erneuerung des Oberbaus mit Zement wird der vorhandene Belag vor Ort recycelt, um den Bedarf an angeliefertem Material und den Transportverkehr im Park zu verringern.","Granite zufolge soll der Bau im Herbst 2026 beginnen und Ende 2027 abgeschlossen sein. Ein regionaler Vizepräsident des Unternehmens sagte, dies sei sein viertes Projekt der FHWA Western Federal Lands in der Region innerhalb von drei Jahren."],"sections":[]},"corrections":[{"at":"2026-10-07T00:54:35+03:00","language":"de","text":"Dieser Artikel wurde um eine deutsche und eine portugiesische Ausgabe sowie entsprechende Übersetzungen der Daten- und Korrekturhinweise ergänzt."}],"country":"US","data":{"blocks":[{"description":{"ar":"قيمة العقد وطول الطريق المراد تأهيله كما ورد في إعلان Granite.","de":"Auftragswert und Länge der zu sanierenden Straße laut Mitteilung von Granite.","en":"Contract value and length of road to be rehabilitated, as stated in Granite’s announcement.","es":"Valor del contrato y longitud de carretera por rehabilitar, según el anuncio de Granite.","fr":"Valeur du contrat et longueur de route à réhabiliter, telles qu’indiquées dans l’annonce de Granite.","pt":"Valor do contrato e extensão da estrada a ser reabilitada, conforme o anúncio da Granite.","tr":"Granite’in duyurusunda belirtilen sözleşme değeri ve rehabilite edilecek yol uzunluğu."},"id":"contract-and-road-figures","items":[{"basis":"observed","label":{"ar":"قيمة العقد (تقريبية)","de":"Auftragswert (ungefähr)","en":"Contract value (approximate)","es":"Valor del contrato (aproximado)","fr":"Valeur du contrat (approximative)","pt":"Valor do contrato (aproximado)","tr":"Sözleşme değeri (yaklaşık)"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"montana","id":"two-medicine-road-rehabilitation-contract-value","periodRole":"announcement-date","unitCode":"million-usd"},"period":"2026-09-09","unit":"million USD","value":23.7,"valueQualifier":"approximate"},{"basis":"target","label":{"ar":"طول الطريق المراد تأهيله","de":"Länge der zu sanierenden Straße","en":"Length of road to be rehabilitated","es":"Longitud de carretera por rehabilitar","fr":"Longueur de route à réhabiliter","pt":"Extensão da estrada a ser reabilitada","tr":"Rehabilite edilecek yol uzunluğu"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"montana","id":"two-medicine-road-rehabilitation-length","periodRole":"announcement-date","unitCode":"mile"},"period":"2026-09-09","unit":"miles","value":7.22}],"methodology":{"ar":"قيمة العقد هي الرقم التقريبي الذي تذكره Granite. وطول الطريق هو نطاق التأهيل المخطط له، لا عمل منجز، وهو مذكور بوحدة المصدر (الأميال).","de":"Der Auftragswert ist der von Granite genannte Näherungswert. Die Straßenlänge bezeichnet den geplanten Sanierungsumfang, nicht abgeschlossene Arbeiten, und wird in der Quelleinheit Meilen angegeben.","en":"The contract value is the approximate figure Granite states. The road length is the planned rehabilitation scope, not completed work, and is given in the source’s unit (miles).","es":"El valor del contrato es la cifra aproximada que indica Granite. La longitud de carretera es el alcance de rehabilitación previsto, no trabajos terminados, y se da en la unidad de la fuente (millas).","fr":"La valeur du contrat est le chiffre approximatif indiqué par Granite. La longueur de route est le périmètre de réhabilitation prévu, et non des travaux réalisés, et elle est donnée dans l’unité de la source (miles).","pt":"O valor do contrato é aproximado, conforme informado pela Granite. A extensão da estrada é o escopo planejado de reabilitação, não uma obra concluída, e é expressa na unidade da fonte (milhas).","tr":"Sözleşme değeri, Granite’in belirttiği yaklaşık rakamdır. Yol uzunluğu planlanan rehabilitasyon kapsamıdır; tamamlanmış iş değildir ve kaynağın birimiyle (mil) verilmiştir."},"sourceUrls":["https://www.graniteconstruction.com/newsroom/granite-awarded-two-medicine-road-rehabilitation-project-glacier-national-park"],"title":{"ar":"أرقام العقد والطريق","de":"Auftrags- und Straßenangaben","en":"Contract and road figures","es":"Cifras del contrato y de la carretera","fr":"Chiffres du contrat et de la route","pt":"Dados do contrato e da estrada","tr":"Sözleşme ve yol rakamları"},"type":"metrics","updatedAt":"2026-10-07T00:54:35+03:00"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026/data/contract-and-road-figures?lang=de&format=csv","json":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026/data/contract-and-road-figures?lang=de&format=json"},"id":"contract-and-road-figures"}],"data_types":["metrics"],"editorial_illustration":{"alt":"Konzeptionelle Darstellung von Transport-, Brücken- und Infrastrukturverbindungen.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"de","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"event_id":"event-ddb23e9d-0293-5213-b27e-15b57bbf54f6","event_period":"2026-09-09","event_period_basis":"event-or-reference-period","id":"granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026","image":null,"importance":0.6,"language":"de","modified_at":"2026-10-07T00:54:35+03:00","publication_basis":"publication-record","published_at":"2026-10-05T09:37:37+00:00","reading_minutes":2,"region":"world","section_illustration":{"alt":"Konzeptionelle Darstellung von Transport-, Brücken- und Infrastrukturverbindungen.","asset_id":"newsverum-v1-infrastructure","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"de","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/infrastructure-1536.webp","width":1536}],"width":1536},"slug":"granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026","sources":[{"checkedAt":"2026-10-04","name":"Granite Construction","publishedAt":"2026-09-09","url":"https://www.graniteconstruction.com/newsroom/granite-awarded-two-medicine-road-rehabilitation-project-glacier-national-park"}],"summary":"Granite zufolge vergab die Western Federal Lands Highway Division der Federal Highway Administration einen Auftrag über etwa 23,7 Millionen US-Dollar zur Sanierung von 7,22 Meilen der Two Medicine Road im Glacier-Nationalpark in Montana.","text":"Granite zufolge vergab die Western Federal Lands Highway Division der Federal Highway Administration einen Auftrag über etwa 23,7 Millionen US-Dollar zur Sanierung von 7,22 Meilen der Two Medicine Road im Glacier-Nationalpark in Montana.\n\nGranite gab am 9. September 2026 bekannt, von der Western Federal Lands Highway Division (WFL) der Federal Highway Administration einen Auftrag zur Sanierung der Two Medicine Road im Glacier-Nationalpark in Montana erhalten zu haben. Das Projekt ist eine Partnerschaft zwischen WFL, dem National Park Service und der Blackfeet Nation und hat einen ungefähren Wert von 23,7 Millionen US-Dollar.\n\nDas Projekt umfasst die Sanierung von 7,22 Meilen der Two Medicine Road, der wichtigsten Zufahrtsstraße zum Two-Medicine-Gebiet des Parks. Zum Auftrag von Granite gehören der Wiederaufbau der Straße, der Rückbau von Straßenabschnitten, eine Schottertragschicht, Asphaltarbeiten mit Heißmischgut, die Wiederherstellung von Parkflächen, Verbesserungen an der Entwässerung, Fahrbahnmarkierungen, die Renaturierung eines Bachlaufs und neue Besuchereinrichtungen. Bei der vollständigen Erneuerung des Oberbaus mit Zement wird der vorhandene Belag vor Ort recycelt, um den Bedarf an angeliefertem Material und den Transportverkehr im Park zu verringern.\n\nGranite zufolge soll der Bau im Herbst 2026 beginnen und Ende 2027 abgeschlossen sein. Ein regionaler Vizepräsident des Unternehmens sagte, dies sei sein viertes Projekt der FHWA Western Federal Lands in der Region innerhalb von drei Jahren.\n\nDieser Artikel wurde um eine deutsche und eine portugiesische Ausgabe sowie entsprechende Übersetzungen der Daten- und Korrekturhinweise ergänzt.","title":"Granite erhält Auftrag über 23,7 Millionen US-Dollar zur Sanierung der Two Medicine Road im Glacier-Nationalpark","topics":["epc-contractors"],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026"},{"api_url":"https://newsverum.com/api/v1/articles/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026"}],"url":"https://newsverum.com/de/news/granite-two-medicine-road-glacier-national-park-rehabilitation-contract-september-2026"},"version":"1"}
