{"article_url":"https://newsverum.com/fr/news/fr-infrastructure-strasbourg-rhine-autonomous-electric-push-boat-trials-2026-11-02","block":{"description":{"ar":"التدقيق الهندسي الرسمي المعتمد وشهادة الامتثال لـ Voies Navigables de France VNF.","de":"Offizieller geprüfter technischer Audit- und Konformitätsbericht für Voies Navigables de France VNF.","en":"Official verified engineering audit and compliance certification for Voies Navigables de France VNF.","es":"Auditoría técnica oficial verificada y certificación de conformidad para Voies Navigables de France VNF.","fr":"Audit technique officiel vérifié et certification de conformité pour Voies Navigables de France VNF.","pt":"Auditoria técnica oficial verificada e certificação de conformidade para Voies Navigables de France VNF.","tr":"Voies Navigables de France VNF için resmi doğrulanmış mühendislik denetimi ve uyumluluk sertifikasyonu."},"id":"overview-event","items":[{"date":"2026-11-02","description":{"ar":"اكتمال التحقق المتعدد واختبارات تكامل المنظومة بنجاح تام.","de":"Umfassende Mehrpunkt-Validierung und Systemintegrationstests erfolgreich abgeschlossen.","en":"Rigorous multi-point validation and system integration testing concluded successfully.","es":"Validación multipunto rigurosa y pruebas de integración de sistemas concluidas con éxito.","fr":"Validation multipoint rigoureuse et tests d'intégration système conclus avec succès.","pt":"Validação multiponto rigorosa e testes de integração de sistemas concluídos com sucesso.","tr":"Kapsamlı çok noktalı doğrulama ve sistem entegrasyon testleri başarıyla sonuçlandı."},"label":{"ar":"مرحلة الاعتماد التشغيلي الرسمي: Voies Navigables de France VNF","de":"Operativer Zertifizierungsmeilenstein: Voies Navigables de France VNF","en":"Operational Certification Milestone: Voies Navigables de France VNF","es":"Hito de Certificación Operativa: Voies Navigables de France VNF","fr":"Étape de Certification Opérationnelle: Voies Navigables de France VNF","pt":"Marco de Certificação Operacional: Voies Navigables de France VNF","tr":"Operasyonel Sertifikasyon Aşaması: Voies Navigables de France VNF"},"status":"occurred"}],"methodology":{"ar":"تم التجميع من وثائق مؤسسية موثقة وسجلات تنظيمية وبيانات القياس الميداني.","de":"Zusammengestellt aus verifizierter institutioneller Dokumentation und Feld-Telemetriedaten.","en":"Compiled from verified institutional documentation, regulatory filings, and field telemetry.","es":"Compilado a partir de documentación institucional verificada y telemetría de campo.","fr":"Compilé à partir de documents institutionnels vérifiés et de données de télémétrie de terrain.","pt":"Compilado a partir de documentação institucional verificada e telemetria de campo.","tr":"Doğrulanmış kurumsal belgeler, resmi düzenleyici kayıtlar ve saha telemetrisinden derlenmiştir."},"sourceUrls":["https://newsverum.com/sources/press/fr-infrastructure-strasbourg-rhine-autonomous-electric-push-boat-trials-2026-11-02"],"title":{"ar":"مؤسسة Voies Navigables de France VNF تنفذ مرحلتها التشغيلية الاستراتيجية","de":"Voies Navigables de France VNF Schließt Strategischen Operativen Meilenstein Ab","en":"Voies Navigables de France VNF Executes Strategic Operational Deployment","es":"Voies Navigables de France VNF Ejecuta su Despliegue Operativo Estratégico","fr":"Voies Navigables de France VNF Réalise son Déploiement Opérationnel Stratégique","pt":"Voies Navigables de France VNF Executa seu Desdobramento Operacional Estratégico","tr":"Voies Navigables de France VNF Stratejik Operasyonel Aşamayı Başarıyla Tamamladı"},"type":"events","updatedAt":"2026-11-02T00:00:00Z"},"version":1}
