{"article":{"annotation":{"article_id":"enprode-livno-ruzgar-pompaj-depolama-ortakligi","available_at":"2026-10-11T21:36:36.800752Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"cbef9074e5c47127ac743dc8734c028c206860ab19d245842290738be0f83b18","input_sha256":"fa0a0e04054b0c771e93cccecca605b932602aed333e8333b85423e6b29c3dc3","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000257","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: hydropower","source_urls":["https://www.enprode.com/News/News-enprode-livno","https://www.enprode.com/services/Engineering-Procurement-Construction"]}],"method":"controlled-rules-v1","rule_id":"renewables","status":"candidate"},{"concept_id":"medtop:20000260","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: pumped-storage","source_urls":["https://www.enprode.com/News/News-enprode-livno","https://www.enprode.com/services/Engineering-Procurement-Construction"]}],"method":"controlled-rules-v1","rule_id":"electricity","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context?lang=en","category":"energy","content":{"key_points":[],"paragraphs":["ENPRODE’s Livno news page describes a partnership agreement for wind-farm construction and reversible, pumped-storage hydropower in Bosnia and Herzegovina. The page provides a heading and video link, without detailed written project data.","We cover the record under renewables and EPC contractor partnerships. ENPRODE’s service page describes engineering, procurement, construction and commissioning. A partnership announcement alone is not proof of final project delivery.","Assessing an investment’s stage requires separate verification of the partnership framework, effective contract and operational start. The page lacks sufficient written information to establish capacity, investment value, counterparty identity or a current commissioning date.","As the announcement’s precise date is unstated, the visible period is the source review period. Readers can follow the original record. This article does not claim that the Livno facilities operate today or that an electricity production target has been achieved."],"sections":[]},"corrections":[{"at":"2026-10-06T21:56:42+03:00","language":"en","text":"The missing language translations for this article have been added."},{"at":"2026-10-07T00:54:32+03:00","language":"en","text":"German and Portuguese editions and translations of the data and correction explanations have been added to this article."}],"country":null,"data":null,"data_downloads":[],"data_types":[],"editorial_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"event_id":"event-0cf9f33f-9913-550b-ab5c-efc4b6c4ea45","event_period":"2026-10","event_period_basis":"source-review","id":"enprode-livno-ruzgar-pompaj-depolama-ortakligi","image":null,"importance":0.4,"language":"en","modified_at":"2026-10-07T00:54:32+03:00","publication_basis":"publication-record","published_at":"2026-10-02T21:09:51+03:00","reading_minutes":1,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of electricity generation, storage and connected data.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"enprodes-livno-partnership-announcement-wind-and-pumped-storage-context","sources":[{"checkedAt":"2026-10-02","name":"ENPRODE — corporate news archive","url":"https://www.enprode.com/News/News-enprode-livno"},{"checkedAt":"2026-10-02","name":"ENPRODE — Engineering Procurement & Construction","url":"https://www.enprode.com/services/Engineering-Procurement-Construction"}],"summary":"The archive presents a Bosnia and Herzegovina partnership heading covering wind and reversible hydropower.","text":"The archive presents a Bosnia and Herzegovina partnership heading covering wind and reversible hydropower.\n\nENPRODE’s Livno news page describes a partnership agreement for wind-farm construction and reversible, pumped-storage hydropower in Bosnia and Herzegovina. The page provides a heading and video link, without detailed written project data.\n\nWe cover the record under renewables and EPC contractor partnerships. ENPRODE’s service page describes engineering, procurement, construction and commissioning. A partnership announcement alone is not proof of final project delivery.\n\nAssessing an investment’s stage requires separate verification of the partnership framework, effective contract and operational start. The page lacks sufficient written information to establish capacity, investment value, counterparty identity or a current commissioning date.\n\nAs the announcement’s precise date is unstated, the visible period is the source review period. Readers can follow the original record. This article does not claim that the Livno facilities operate today or that an electricity production target has been achieved.\n\nThe missing language translations for this article have been added.\n\nGerman and Portuguese editions and translations of the data and correction explanations have been added to this article.","title":"ENPRODE’s Livno partnership announcement: wind and pumped-storage context","topics":["epc-contractors"],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context"},{"api_url":"https://newsverum.com/api/v1/articles/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context?lang=en","language":"en","url":"https://newsverum.com/en/news/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context"},{"api_url":"https://newsverum.com/api/v1/articles/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context"},{"api_url":"https://newsverum.com/api/v1/articles/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context"},{"api_url":"https://newsverum.com/api/v1/articles/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context?lang=es","language":"es","url":"https://newsverum.com/es/news/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context"},{"api_url":"https://newsverum.com/api/v1/articles/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context?lang=de","language":"de","url":"https://newsverum.com/de/news/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context"},{"api_url":"https://newsverum.com/api/v1/articles/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context"}],"url":"https://newsverum.com/en/news/enprodes-livno-partnership-announcement-wind-and-pumped-storage-context"},"version":"1"}
