{"article":{"annotation":{"article_id":"emperor-duquesne-west-reports-seven-final-drillhole-assays-2026","available_at":"2026-10-20T23:02:09.137250Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"ad4ab96fbd26264998bba5293e21adc6173a3cbaec39957fb0733cddc4c8b8b7","input_sha256":"a6489fff3efad08c22d1b79d74f7a2f741834cca9df079c1d34d454febc84038","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"CA","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.newsfilecorp.com/release/319909/Emperor-Reports-Additional-Drill-Results-and-Continues-to-Strengthen-Conceptual-Phase-1-OpenPit"]}],"geometry":null,"id":"iso3166-1:CA","kind":"country-or-area","labels":{"ar":"كندا","en":"Canada","es":"Canadá","fr":"Canada"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000349","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.newsfilecorp.com/release/319909/Emperor-Reports-Additional-Drill-Results-and-Continues-to-Strengthen-Conceptual-Phase-1-OpenPit"]}],"method":"controlled-rules-v1","rule_id":"business-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026?lang=ar","category":"business","content":{"key_points":[],"paragraphs":["وشملت النتائج الأخرى القريبة من السطح 1.2 غرام للطن على 19.2 متراً في DQ26-22 و0.7 غرام على 6.5 متر في DQ26-23. وقالت الشركة إن النتائج أُعلنت لـ51 من أصل 66 ثقباً، فيما لا تزال نتائج 15 ثقباً معلقة.","هذه أطوال داخل الثقوب وليست بالضرورة سماكات حقيقية. وبعد توقف قصير لمراجعة النتائج وتنقيح الأهداف، تخطط الشركة لحفر 3,000 إلى 5,000 متر إضافية؛ وهذا عمل مستقبلي لم يكتمل بعد."],"sections":[]},"corrections":[],"country":"CA","data":{"blocks":[{"description":{"ar":"أعلنت إمبراطور ميتالز النتائج النهائية لسبعة ثقوب جديدة ضمن حملة 2026 في دوكين ويست بكيبيك. وأعاد الثقب DQ26-51 مقدار 1.0 غرام للطن من الذهب على 26.3 متراً بدءاً من عمق رأسي يقارب 40 متراً.","de":"Emperor Metals meldete endgültige Analysen aus sieben neuen Bohrlöchern der Kampagne 2026 bei Duquesne West in Québec. Bohrloch DQ26-51 ergab 1,0 g/t Gold über 26,3 Meter ab etwa 40 Metern vertikaler Tiefe.","en":"Emperor Metals reported final assays from seven new holes in its 2026 Duquesne West campaign in Quebec. Hole DQ26-51 returned 1.0 g/t gold over 26.3 metres from about 40 metres vertical depth.","es":"Emperor Metals publicó los ensayos finales de siete nuevos sondeos de su campaña de 2026 en Duquesne West, Quebec. El sondeo DQ26-51 registró 1,0 g/t de oro en 26,3 metros desde unos 40 metros de profundidad vertical.","fr":"Emperor Metals a publié les analyses finales de sept nouveaux trous de sa campagne 2026 à Duquesne West, au Québec. Le trou DQ26-51 a donné 1,0 g/t d’or sur 26,3 mètres à partir d’environ 40 mètres de profondeur verticale.","pt":"A Emperor Metals divulgou os resultados finais de sete novos furos da campanha de 2026 em Duquesne West, Quebec. O furo DQ26-51 registou 1,0 g/t de ouro ao longo de 26,3 metros, a partir de cerca de 40 metros de profundidade vertical.","tr":"Emperor Metals, Québec’teki Duquesne West projesinin 2026 kampanyasındaki yedi yeni sondaj deliğinin nihai analizlerini bildirdi. DQ26-51 deliği yaklaşık 40 metre dikey derinlikten başlayarak 26,3 metrede 1,0 g/t altın verdi."},"id":"duquesne-west-final-assays-october-2026","items":[{"date":"2026-10-20","description":{"ar":"أعلنت إمبراطور ميتالز النتائج النهائية لسبعة ثقوب جديدة ضمن حملة 2026 في دوكين ويست بكيبيك. وأعاد الثقب DQ26-51 مقدار 1.0 غرام للطن من الذهب على 26.3 متراً بدءاً من عمق رأسي يقارب 40 متراً.","de":"Emperor Metals meldete endgültige Analysen aus sieben neuen Bohrlöchern der Kampagne 2026 bei Duquesne West in Québec. Bohrloch DQ26-51 ergab 1,0 g/t Gold über 26,3 Meter ab etwa 40 Metern vertikaler Tiefe.","en":"Emperor Metals reported final assays from seven new holes in its 2026 Duquesne West campaign in Quebec. Hole DQ26-51 returned 1.0 g/t gold over 26.3 metres from about 40 metres vertical depth.","es":"Emperor Metals publicó los ensayos finales de siete nuevos sondeos de su campaña de 2026 en Duquesne West, Quebec. El sondeo DQ26-51 registró 1,0 g/t de oro en 26,3 metros desde unos 40 metros de profundidad vertical.","fr":"Emperor Metals a publié les analyses finales de sept nouveaux trous de sa campagne 2026 à Duquesne West, au Québec. Le trou DQ26-51 a donné 1,0 g/t d’or sur 26,3 mètres à partir d’environ 40 mètres de profondeur verticale.","pt":"A Emperor Metals divulgou os resultados finais de sete novos furos da campanha de 2026 em Duquesne West, Quebec. O furo DQ26-51 registou 1,0 g/t de ouro ao longo de 26,3 metros, a partir de cerca de 40 metros de profundidade vertical.","tr":"Emperor Metals, Québec’teki Duquesne West projesinin 2026 kampanyasındaki yedi yeni sondaj deliğinin nihai analizlerini bildirdi. DQ26-51 deliği yaklaşık 40 metre dikey derinlikten başlayarak 26,3 metrede 1,0 g/t altın verdi."},"label":{"ar":"إمبراطور تعلن النتائج النهائية لسبعة ثقوب حفر في دوكين ويست","de":"Emperor meldet endgültige Analysen aus sieben Bohrlöchern bei Duquesne West","en":"Emperor reports final assays from seven Duquesne West drill holes","es":"Emperor publica los ensayos finales de siete sondeos en Duquesne West","fr":"Emperor publie les analyses finales de sept sondages à Duquesne West","pt":"A Emperor divulga os resultados finais de sete furos em Duquesne West","tr":"Emperor, Duquesne West’te yedi sondaj deliğinin son analizlerini açıkladı"},"status":"occurred"}],"methodology":{"ar":"نتائج مختارة في بيان الشركة بتاريخ 20 أكتوبر 2026. الأطوال داخل الثقوب. والحفر الإضافي المخطط ليس عملاً منجزاً.","de":"Ausgewählte Ergebnisse der Mitteilung vom 20. Oktober 2026. Abschnitte sind Bohrlängen. Weitere geplante Bohrungen sind noch nicht ausgeführt.","en":"Selected results in the company’s October 20, 2026 release. Intervals are downhole lengths. Further planned drilling is not completed capacity.","es":"Resultados seleccionados del comunicado del 20 de octubre de 2026. Los intervalos son longitudes de sondeo. La perforación adicional es futura.","fr":"Résultats choisis du communiqué du 20 octobre 2026. Les intervalles sont des longueurs en trou. Les forages supplémentaires prévus ne sont pas réalisés.","pt":"Resultados selecionados do comunicado de 20 de outubro de 2026. Os intervalos são comprimentos no furo. A perfuração adicional é futura.","tr":"20 Ekim 2026 tarihli şirket açıklamasındaki seçilmiş sonuçlar. Aralıklar sondaj boyudur. İlaveten planlanan sondaj gerçekleşmiş kapasite değildir."},"sourceUrls":["https://www.newsfilecorp.com/release/319909/Emperor-Reports-Additional-Drill-Results-and-Continues-to-Strengthen-Conceptual-Phase-1-OpenPit"],"title":{"ar":"إمبراطور تعلن النتائج النهائية لسبعة ثقوب حفر في دوكين ويست","de":"Emperor meldet endgültige Analysen aus sieben Bohrlöchern bei Duquesne West","en":"Emperor reports final assays from seven Duquesne West drill holes","es":"Emperor publica los ensayos finales de siete sondeos en Duquesne West","fr":"Emperor publie les analyses finales de sept sondages à Duquesne West","pt":"A Emperor divulga os resultados finais de sete furos em Duquesne West","tr":"Emperor, Duquesne West’te yedi sondaj deliğinin son analizlerini açıkladı"},"type":"events","updatedAt":"2026-10-20T22:38:59Z"},{"columns":[{"key":"scope","label":{"ar":"النطاق","de":"Umfang","en":"Scope","es":"Alcance","fr":"Périmètre","pt":"Âmbito","tr":"Kapsam"},"language":"en","type":"text"},{"key":"value","label":{"ar":"الدرجة (غ/طن Au)","de":"Gehalt (g/t Au)","en":"Grade (g/t Au)","es":"Ley (g/t Au)","fr":"Teneur (g/t Au)","pt":"Teor (g/t Au)","tr":"Tenör (g/t Au)"},"type":"number","unit":"g/t"}],"description":{"ar":"درجة الذهب في تحليل مختار قريب من السطح أعلنته الشركة.","de":"Goldgehalt einer ausgewählten oberflächennahen Analyse des Unternehmens.","en":"Gold grade in a selected near-surface assay reported by the company.","es":"Ley de oro de un ensayo seleccionado de poca profundidad comunicado por la empresa.","fr":"Teneur en or d’une analyse choisie peu profonde annoncée par l’entreprise.","pt":"Teor de ouro numa análise selecionada próxima da superfície divulgada pela empresa.","tr":"Şirketin seçilmiş yakın yüzey analizindeki altın tenörü."},"id":"duquesne-dq26-51-grade","methodology":{"ar":"أعاد DQ26-51 مقدار 1.0 غ/طن Au على 26.3 م بدءاً من عمق رأسي يقارب 40 م؛ والطول داخل الثقب.","de":"DQ26-51 ergab 1,0 g/t Au über 26,3 m ab etwa 40 m vertikaler Tiefe; Bohrlänge.","en":"DQ26-51 returned 1.0 g/t Au over 26.3 m from about 40 m vertical depth; length is downhole.","es":"DQ26-51 registró 1,0 g/t Au en 26,3 m desde unos 40 m de profundidad vertical; longitud de sondeo.","fr":"DQ26-51 a livré 1,0 g/t Au sur 26,3 m à partir d’environ 40 m de profondeur verticale; longueur dans le trou.","pt":"DQ26-51 registou 1,0 g/t Au em 26,3 m a partir de cerca de 40 m de profundidade vertical; comprimento no furo.","tr":"DQ26-51 deliği yaklaşık 40 m dikey derinlikten başlayarak 26,3 m boyunca 1,0 g/t Au verdi; uzunluk kuyu içidir."},"rowTranslations":[{"scope":{"ar":"درجة DQ26-51 المعلنة","de":"Gemeldeter Gehalt DQ26-51","en":"DQ26-51 reported grade","es":"Ley comunicada de DQ26-51","fr":"Teneur annoncée DQ26-51","pt":"Teor divulgado de DQ26-51","tr":"DQ26-51 kuyusunda bildirilen altın tenörü"}}],"rows":[{"scope":"DQ26-51 reported grade","value":1.0}],"sourceUrls":["https://www.newsfilecorp.com/release/319909/Emperor-Reports-Additional-Drill-Results-and-Continues-to-Strengthen-Conceptual-Phase-1-OpenPit"],"title":{"ar":"درجة الذهب في DQ26-51","de":"Goldgehalt von DQ26-51","en":"DQ26-51 gold grade","es":"Ley de oro de DQ26-51","fr":"Teneur en or de DQ26-51","pt":"Teor de ouro do DQ26-51","tr":"DQ26-51 altın tenörü"},"type":"table","updatedAt":"2026-10-20T22:38:59Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026/data/duquesne-west-final-assays-october-2026?lang=ar&format=csv","json":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026/data/duquesne-west-final-assays-october-2026?lang=ar&format=json"},"id":"duquesne-west-final-assays-october-2026"},{"formats":{"csv":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026/data/duquesne-dq26-51-grade?lang=ar&format=csv","json":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026/data/duquesne-dq26-51-grade?lang=ar&format=json"},"id":"duquesne-dq26-51-grade"}],"data_types":["events","table"],"editorial_illustration":{"alt":"رسم توضيحي مفاهيمي للصناعة والهندسة وروابط الخدمات اللوجستية.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"ar","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"event_id":"event-cccb2848-1c23-5b37-b2cd-878206dfaf89","event_period":"2026-10-20","event_period_basis":"event-or-reference-period","id":"emperor-duquesne-west-reports-seven-final-drillhole-assays-2026","image":null,"importance":0.6,"language":"ar","modified_at":"2026-10-20T23:01:22+00:00","publication_basis":"publication-record","published_at":"2026-10-20T23:01:22+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"رسم توضيحي مفاهيمي للصناعة والهندسة وروابط الخدمات اللوجستية.","asset_id":"newsverum-v1-business","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"ar","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/business-1536.webp","width":1536}],"width":1536},"slug":"emperor-duquesne-west-reports-seven-final-drillhole-assays-2026","sources":[{"checkedAt":"2026-10-20","name":"Emperor Metals Inc. via Newsfile Corp.","publishedAt":"2026-10-20","url":"https://www.newsfilecorp.com/release/319909/Emperor-Reports-Additional-Drill-Results-and-Continues-to-Strengthen-Conceptual-Phase-1-OpenPit"}],"summary":"أعلنت إمبراطور ميتالز النتائج النهائية لسبعة ثقوب جديدة ضمن حملة 2026 في دوكين ويست بكيبيك. وأعاد الثقب DQ26-51 مقدار 1.0 غرام للطن من الذهب على 26.3 متراً بدءاً من عمق رأسي يقارب 40 متراً.","text":"أعلنت إمبراطور ميتالز النتائج النهائية لسبعة ثقوب جديدة ضمن حملة 2026 في دوكين ويست بكيبيك. وأعاد الثقب DQ26-51 مقدار 1.0 غرام للطن من الذهب على 26.3 متراً بدءاً من عمق رأسي يقارب 40 متراً.\n\nوشملت النتائج الأخرى القريبة من السطح 1.2 غرام للطن على 19.2 متراً في DQ26-22 و0.7 غرام على 6.5 متر في DQ26-23. وقالت الشركة إن النتائج أُعلنت لـ51 من أصل 66 ثقباً، فيما لا تزال نتائج 15 ثقباً معلقة.\n\nهذه أطوال داخل الثقوب وليست بالضرورة سماكات حقيقية. وبعد توقف قصير لمراجعة النتائج وتنقيح الأهداف، تخطط الشركة لحفر 3,000 إلى 5,000 متر إضافية؛ وهذا عمل مستقبلي لم يكتمل بعد.","title":"إمبراطور تعلن النتائج النهائية لسبعة ثقوب حفر في دوكين ويست","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026"},{"api_url":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026"},{"api_url":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026"},{"api_url":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026"},{"api_url":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026"},{"api_url":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026"},{"api_url":"https://newsverum.com/api/v1/articles/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026"}],"url":"https://newsverum.com/ar/news/emperor-duquesne-west-reports-seven-final-drillhole-assays-2026"},"version":"1"}
