{"article":{"annotation":{"article_id":"egypt-millaha-phase-two-gas-plant-starts-operations","available_at":"2026-10-21T00:45:15.627416Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"cf4822eb7683ceaf1e20ea7e3ded41469537000db8495b27aa94f2269e5bbb96","input_sha256":"3172cd51c56f7a4343372920637396403941a5a69172599027504e88680642ed","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"EG","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.petroleum.gov.eg/ar-eg/media-center/news/news-pages/Pages/mop_20102026_01.aspx"]}],"geometry":null,"id":"iso3166-1:EG","kind":"country-or-area","labels":{"ar":"مصر","en":"Egypt","es":"Egipto","fr":"Égypte"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000263","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: gas project","source_urls":["https://www.petroleum.gov.eg/ar-eg/media-center/news/news-pages/Pages/mop_20102026_01.aspx"]}],"method":"controlled-rules-v1","rule_id":"natural-gas","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations?lang=tr","category":"energy","content":{"key_points":[],"paragraphs":["Mısır Petrol ve Maden Kaynakları Bakanlığı, Eni ile Mısır Genel Petrol Kurumu ortak girişimi Agiba’nın Meliha imtiyaz alanında ikinci aşama gaz projesini devreye almaya başladığını 20 Ekim’de duyurdu. Yeni merkez, sahalardan gelen gazı işleme kapasitesini artırmayı amaçlıyor.","Tesisin tasarım kapasitesi günde 100 milyon standart fit küpe kadar. Projede geliştirme kuyuları, toplama ağları, ana taşıma hatları ve yeni bir gaz ihracat hattı bulunuyor. Açıklama devreye alma çalışmalarını bildiriyor; fiilî üretim hacmi veya üretim başlangıç tarihi vermiyor."],"sections":[]},"corrections":[],"country":"EG","data":{"blocks":[{"columns":[{"key":"measure","label":{"ar":"المؤشر","de":"Messgröße","en":"Measure","es":"Medida","fr":"Mesure","pt":"Medida","tr":"Ölçüm"},"language":"en","type":"text"},{"key":"capacity","label":{"ar":"مليار قدم مكعب يومياً","de":"Milliarden Kubikfuß pro Tag","en":"Billion cubic feet per day","es":"Miles de millones de pies cúbicos al día","fr":"Milliards de pieds cubes par jour","pt":"Mil milhões de pés cúbicos por dia","tr":"Milyar fit küp/gün"},"type":"number","unit":"billion cubic feet per day"}],"description":{"ar":"الحد الأقصى اليومي لمعالجة الغاز بحسب الوزارة.","de":"Maximale tägliche Gasverarbeitung laut Ministerium.","en":"Maximum daily gas-processing capacity stated by the ministry.","es":"Capacidad máxima diaria de procesamiento indicada por el ministerio.","fr":"Capacité maximale quotidienne de traitement annoncée par le ministère.","pt":"Capacidade máxima diária de processamento indicada pelo ministério.","tr":"Bakanlığın bildirdiği azami günlük gaz işleme kapasitesi."},"id":"official-source-data","methodology":{"ar":"يذكر المصدر 100 مليون قدم مكعب قياسي يومياً؛ وحُولت القيمة إلى 0.1 مليار قدم مكعب يومياً.","de":"Die Quelle nennt 100 Millionen Standardkubikfuß pro Tag; die Tabelle rechnet in 0,1 Milliarden um.","en":"The source states 100 million standard cubic feet per day; the table converts this to 0.1 billion cubic feet per day.","es":"La fuente indica 100 millones de pies cúbicos estándar al día; la tabla lo convierte en 0,1 mil millones.","fr":"La source indique 100 millions de pieds cubes standard par jour; le tableau convertit ce chiffre en 0,1 milliard.","pt":"A fonte indica 100 milhões de pés cúbicos padrão por dia; a tabela converte o valor para 0,1 mil milhões.","tr":"Kaynak 100 milyon standart fit küp/gün bildiriyor; tabloda bu değer 0,1 milyar fit küp/gün olarak dönüştürülmüştür."},"rowTranslations":[{"measure":{"ar":"الحد الأقصى لطاقة المعالجة التصميمية","de":"Maximale Auslegungskapazität der Verarbeitung","en":"Maximum design processing capacity","es":"Capacidad máxima de diseño de procesamiento","fr":"Capacité nominale maximale de traitement","pt":"Capacidade máxima de projeto para processamento","tr":"Azami tasarım işleme kapasitesi"}}],"rows":[{"capacity":0.1,"measure":"Maximum design processing capacity"}],"sourceUrls":["https://www.petroleum.gov.eg/ar-eg/media-center/news/news-pages/Pages/mop_20102026_01.aspx"],"title":{"ar":"الطاقة التصميمية لمنشأة مليحة في مرحلتها الثانية","de":"Auslegungskapazität der Anlage Meliha, Phase zwei","en":"Design capacity of Meliha Phase Two facility","es":"Capacidad de diseño de la instalación Meliha, fase dos","fr":"Capacité nominale de l’installation Meliha, phase deux","pt":"Capacidade de projeto da instalação Meliha, fase dois","tr":"Meliha ikinci aşama tesisinin tasarım kapasitesi"},"type":"table","updatedAt":"2026-10-20T23:36:30Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations/data/official-source-data?lang=tr&format=csv","json":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations/data/official-source-data?lang=tr&format=json"},"id":"official-source-data"}],"data_types":["table"],"editorial_illustration":{"alt":"Petrol ve doğal gaz altyapısı ve bilgi akışının kavramsal illüstrasyonu.","asset_id":"newsverum-v1-oil-gas","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"tr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/oil-gas-1536.webp","width":1536}],"width":1536},"event_id":"event-c2719858-bd04-530e-9dda-706a498dcdcb","event_period":"2026-10-20","event_period_basis":"event-or-reference-period","id":"egypt-millaha-phase-two-gas-plant-starts-operations","image":null,"importance":0.6,"language":"tr","modified_at":"2026-10-21T00:44:00+00:00","publication_basis":"publication-record","published_at":"2026-10-21T00:44:00+00:00","reading_minutes":1,"region":"world","section_illustration":{"alt":"Elektrik üretimi, depolama ve bağlantılı verinin kavramsal illüstrasyonu.","asset_id":"newsverum-v1-energy","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.avif","width":1536}],"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"tr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/energy-1536.webp","width":1536}],"width":1536},"slug":"egypt-millaha-phase-two-gas-plant-starts-operations","sources":[{"checkedAt":"2026-10-21","name":"Egyptian Ministry of Petroleum and Mineral Resources","publishedAt":"2026-10-20","url":"https://www.petroleum.gov.eg/ar-eg/media-center/news/news-pages/Pages/mop_20102026_01.aspx"}],"summary":"Petrol Bakanlığı, Eni ve ortak girişimi Agiba’nın Batı Çölü’ndeki yeni tesis için devreye alma çalışmalarını başlattığını açıkladı.","text":"Petrol Bakanlığı, Eni ve ortak girişimi Agiba’nın Batı Çölü’ndeki yeni tesis için devreye alma çalışmalarını başlattığını açıkladı.\n\nMısır Petrol ve Maden Kaynakları Bakanlığı, Eni ile Mısır Genel Petrol Kurumu ortak girişimi Agiba’nın Meliha imtiyaz alanında ikinci aşama gaz projesini devreye almaya başladığını 20 Ekim’de duyurdu. Yeni merkez, sahalardan gelen gazı işleme kapasitesini artırmayı amaçlıyor.\n\nTesisin tasarım kapasitesi günde 100 milyon standart fit küpe kadar. Projede geliştirme kuyuları, toplama ağları, ana taşıma hatları ve yeni bir gaz ihracat hattı bulunuyor. Açıklama devreye alma çalışmalarını bildiriyor; fiilî üretim hacmi veya üretim başlangıç tarihi vermiyor.","title":"Mısır’da Meliha gaz projesinin ikinci aşaması devreye alınıyor","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/egypt-millaha-phase-two-gas-plant-starts-operations"},{"api_url":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations?lang=en","language":"en","url":"https://newsverum.com/en/news/egypt-millaha-phase-two-gas-plant-starts-operations"},{"api_url":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/egypt-millaha-phase-two-gas-plant-starts-operations"},{"api_url":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/egypt-millaha-phase-two-gas-plant-starts-operations"},{"api_url":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations?lang=es","language":"es","url":"https://newsverum.com/es/news/egypt-millaha-phase-two-gas-plant-starts-operations"},{"api_url":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations?lang=de","language":"de","url":"https://newsverum.com/de/news/egypt-millaha-phase-two-gas-plant-starts-operations"},{"api_url":"https://newsverum.com/api/v1/articles/egypt-millaha-phase-two-gas-plant-starts-operations?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/egypt-millaha-phase-two-gas-plant-starts-operations"}],"url":"https://newsverum.com/tr/news/egypt-millaha-phase-two-gas-plant-starts-operations"},"version":"1"}
