{"article_url":"https://newsverum.com/en/news/dubai-rta-final-world-trade-centre-bridge-october-2026","block":{"description":{"en":"RTA figures for project scope, cost, capacity and traffic estimates.","tr":"RTA’nın proje kapsamı, maliyeti, kapasitesi ve trafik tahminleri."},"id":"project-measures","items":[{"basis":"target","label":{"en":"Final bridge length","tr":"Son köprünün uzunluğu"},"measure":{"aggregation":"unspecified","frequency":"irregular","geography":"dubai","id":"dubai-rta-final-world-trade-centre--1","periodRole":"announcement-date","unitCode":"metre"},"period":"2026-10-25","unit":"metres","value":1000},{"basis":"estimate","label":{"en":"Final bridge hourly capacity","tr":"Son köprünün saatlik kapasitesi"},"measure":{"aggregation":"rate","frequency":"irregular","geography":"dubai","id":"dubai-rta-final-world-trade-centre--2","periodRole":"announcement-date","unitCode":"count-per-hour"},"period":"2026-10-25","unit":"vehicles per hour","value":3000,"valueQualifier":"approximate"},{"basis":"target","label":{"en":"Combined length of five bridges","tr":"Beş köprünün toplam uzunluğu"},"measure":{"aggregation":"unspecified","frequency":"irregular","geography":"dubai","id":"dubai-rta-final-world-trade-centre--3","periodRole":"announcement-date","unitCode":"metre"},"period":"2026-10-25","unit":"metres","value":5000},{"basis":"estimate","label":{"en":"Project cost","tr":"Proje maliyeti"},"measure":{"aggregation":"unspecified","frequency":"irregular","geography":"dubai","id":"dubai-rta-final-world-trade-centre--4","periodRole":"announcement-date","unitCode":"million-aed"},"period":"2026-10-25","unit":"million AED","value":696,"valueQualifier":"lower-bound"},{"basis":"estimate","label":{"en":"Estimated beneficiaries","tr":"Tahmini yararlanıcı sayısı"},"measure":{"aggregation":"unspecified","frequency":"irregular","geography":"dubai","id":"dubai-rta-final-world-trade-centre--5","periodRole":"announcement-date","unitCode":"count"},"period":"2026-10-25","unit":"people","value":500000,"valueQualifier":"lower-bound"}],"methodology":{"en":"Dimensions and capacity are announced design specifications for a bridge scheduled to open on 30 October; journey-time, delay and beneficiary values are RTA estimates, and project cost is reported by RTA. The figures are not post-opening observations. All metrics use 25 October, the announcement date, as the reference point.","tr":"Ölçü ve kapasite, 30 Ekim’de açılması planlanan köprü için duyurulan tasarım özellikleridir; yolculuk süresi, gecikme ve yararlanıcı değerleri RTA tahminidir, proje maliyeti de RTA tarafından bildirilmiştir. Rakamlar açılış sonrası gözlemler değildir. Göstergeler 25 Ekim duyurusunun tarihini referans alır."},"sourceUrls":["https://www.wam.ae/en/article/c2x5vcy-rta-completes-world-trade-centre-roundabout"],"title":{"en":"Project dimensions and estimates","tr":"Proje ölçüleri ve tahminler"},"type":"metrics","updatedAt":"2026-10-25T20:47:21Z"},"version":1}
