{"article_url":"https://newsverum.com/es/news/dakota-gold-files-richmond-hill-project-s-k-1300-technical-report-summary-2026","block":{"description":{"en":"Qualified person engineering authors listed on the November 23, 2026 Exhibit 96.1 technical report.","tr":"23 Kasım 2026 Ek 96.1 teknik raporunda yer alan yetkili mühendis yazarlar."},"id":"dakota-gold-richmond-hill-metrics","items":[{"basis":"observed","label":{"en":"Qualified Person Authors Named","tr":"Adı Geçen Yetkili Uzman Yazar Sayısı"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"us","id":"dc-richmond-hill-qps","periodRole":"reference-period","unitCode":"count"},"period":"2026-11-23","unit":"count","value":6.0}],"methodology":{"en":"Figures transcribed directly from the issuer's November 23, 2026 Form 8-K filing with the U.S. Securities and Exchange Commission.","tr":"Veriler, ihraççının 23 Kasım 2026 tarihli ABD Menkul Kıymetler ve Borsa Komisyonu (SEC) Form 8-K bildiriminden doğrudan aktarılmıştır."},"sourceUrls":["https://www.sec.gov/Archives/edgar/data/1852353/000110465926130676/tm2629467d1_ex96-1.htm"],"title":{"en":"Dakota Gold Technical Report Reference","tr":"Dakota Gold Teknik Rapor Referansı"},"type":"metrics","updatedAt":"2026-11-24T12:25:00Z"},"version":1}
