{"article":{"annotation":{"article_id":"colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026","available_at":"2026-11-20T17:40:05.993458Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"432e8a8ab1354920c7f6ec397787466e0658052ddebb89a93dc707c5f81fa856","input_sha256":"eea02115cc7da95e831e14d5c861beffbf599a37aa79e1615383ef1741a3f75b","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"CO","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"]}],"geometry":null,"id":"iso3166-1:CO","kind":"country-or-area","labels":{"ar":"كولومبيا","en":"Colombia","es":"Colombia","fr":"Colombie"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000260","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: power lines","source_urls":["https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"]}],"method":"controlled-rules-v1","rule_id":"electricity","status":"candidate"},{"concept_id":"medtop:13000000","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"]}],"method":"controlled-rules-v1","rule_id":"technology-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=fr","category":"technology","content":{"key_points":[],"paragraphs":["Le ministère des Technologies de l’information et des Communications (MinTIC) de Colombie a annoncé le 20 novembre 2026 l’établissement d’une feuille de route conjointe avec Enlaza, filiale de transport d’énergie électrique du Grupo Energía Bogotá (GEB), afin de déployer la fibre optique dans des zones reculées en mutualisant les lignes de transport d’électricité. À l’issue d’une réunion de coordination dirigée par le vice-ministre de la Connectivité, Camilo Carrascal, les deux entités ont arrêté un portefeuille associant des projets locaux financés par le mécanisme fiscal Obras por Impuestos (Travaux contre impôts) et l’évaluation technique de corridors régionaux de transport de données.","La solution technologique présentée dans le communiqué officiel repose sur l’utilisation des câbles de fibre optique déjà installés sur les pylônes à haute tension et dans les sous-stations électriques pour les systèmes de contrôle et de téléconduite du réseau. En partageant la capacité de transport de données de cette infrastructure électrique, le MinTIC et Enlaza entendent établir des liaisons dorsales de télécommunications dans des territoires ruraux où la construction de réseaux autonomes est coûteuse, avant d’y raccorder des réseaux d’accès locaux pour les ménages, les écoles et les activités agricoles ou touristiques.","Dans la municipalité de Medina, située dans le département de Cundinamarca, les partenaires ont signé l’acte officiel de démarrage (acta de inicio) d’un projet représentant un investissement de 11 790 millions de pesos colombiens (11,79 milliards de pesos). Selon le MinTIC, ce déploiement à Medina doit raccorder à Internet les foyers de 303 familles rurales, mettre en service 21 zones numériques intelligentes destinées aux secteurs productif, commercial et touristique, fournir un accès Internet à plus de 900 élèves dans les établissements scolaires et toucher au total 5 623 bénéficiaires.","Dans la municipalité de Planadas, dans le département du Tolima, le ministère a annoncé la validation de faisabilité d’un second projet doté d’un investissement de 17 400 millions de pesos colombiens (17,4 milliards de pesos). Cette initiative vise à connecter les foyers de 800 familles de caféiculteurs et intègre un mécanisme de fidélisation soutenu par la Fédération nationale des producteurs de café (Federación Nacional de Cafeteros). Le projet de Planadas comprend également 20 zones numériques touristiques intelligentes le long de la route du café, articulées avec un programme d’intelligence artificielle, ainsi que des olympiades technologiques via le programme Ángeles de la Patria au profit de plus de 2 000 élèves de la commune.","Les opérations de Medina et de Planadas doivent toutes deux être exécutées par Enlaza dans le cadre du dispositif Obras por Impuestos, un instrument fiscal colombien permettant aux entreprises d’affecter une partie de leur impôt sur le revenu à la réalisation directe de projets d’infrastructures publiques approuvés dans des municipalités prioritaires. La signature de l’acte de démarrage à Medina et l’approbation de faisabilité à Planadas constituent des étapes administratives préalables au chantier et non une mise en service effective des réseaux.","Par ailleurs, les deux partenaires sont convenus d’explorer conjointement deux initiatives régionales de transport de données sur des lignes de transport d’électricité. La première porte sur la mise en place d’un réseau de transport de télécommunications de plus de 200 kilomètres entre les départements méridionaux de Huila et de Putumayo, afin d’accroître la capacité de transit de données dans ces deux départements et de préparer l’extension d’Internet dans les zones isolées.","La seconde évaluation concerne le nord du pays, le long des 475 kilomètres de fibre optique à haute capacité intégrés au projet de ligne de transport électrique Colectora actuellement construit par Enlaza. Le ministère précise qu’une solution de connectivité sera étudiée en tenant compte des conditions socioculturelles des communautés locales pour renforcer la capacité de transport de données dans 14 municipalités : dix dans le département de La Guajira (Albania, Maicao, Distracción, La Jagua del Pilar, Manaure, Riohacha, San Juan del Cesar, Uribia, Urumita et Villanueva) et quatre dans le département du Cesar (Valledupar, Becerril, La Paz et El Paso).","L’annonce du 20 novembre 2026 distingue ainsi deux projets municipaux budgétés sous le régime Obras por Impuestos—totalisant 29 190 millions de pesos à Medina et Planadas pour 1 103 ménages ruraux, 41 zones numériques et plus de 2 900 élèves—et deux corridors dorsaux sur réseau électrique totalisant plus de 675 kilomètres entre Huila-Putumayo et La Guajira-Cesar, qui demeurent au stade de l’étude. La fourniture effective du haut débit dans les 14 communes du nord et le corridor sud dépendra de l’achèvement de la ligne Colectora, des concertations communautaires et du financement des réseaux locaux de desserte finale."],"sections":[]},"corrections":[],"country":"CO","data":{"blocks":[{"description":{"ar":"أرقام مختارة منقولة من المصدر الأولي المشار إليه.","de":"Ausgewählte Zahlen aus der zitierten Primärquelle.","en":"Selected figures transcribed from the cited primary source.","es":"Cifras seleccionadas transcritas de la fuente primaria citada.","fr":"Chiffres sélectionnés transcrits de la source primaire citée.","pt":"Valores selecionados transcritos da fonte primária citada.","tr":"Atıf yapılan birincil kaynaktan aktarılan seçilmiş rakamlar."},"id":"reported-figures","items":[{"basis":"target","label":{"ar":"استثمار مشروع الاتصال في ميدينا، كونديناماركا","de":"Investition in das Konnektivitätsprojekt in Medina, Cundinamarca","en":"Connectivity project investment in Medina, Cundinamarca","es":"Inversión del proyecto de conectividad en Medina, Cundinamarca","fr":"Investissement du projet de connectivité à Medina, Cundinamarca","pt":"Investimento do projeto de conectividade em Medina, Cundinamarca","tr":"Cundinamarca, Medina bağlantı projesi yatırım tutarı"},"measure":{"aggregation":"flow","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-1","periodRole":"announcement-date","unitCode":"million-cop"},"period":"2026-11-20","unit":"million COP","value":11790},{"basis":"target","label":{"ar":"المستفيدون المخطط لهم من مشروع الاتصال في ميدينا","de":"Geplante Begünstigte des Konnektivitätsprojekts in Medina","en":"Planned beneficiaries of the Medina connectivity project","es":"Personas beneficiarias previstas del proyecto de conectividad en Medina","fr":"Bénéficiaires prévus du projet de connectivité de Medina","pt":"Pessoas beneficiárias previstas do projeto de conectividade em Medina","tr":"Medina bağlantı projesinin planlanan yararlanıcı sayısı"},"measure":{"aggregation":"unspecified","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-2","periodRole":"announcement-date","unitCode":"count"},"period":"2026-11-20","unit":"beneficiaries","value":5623},{"basis":"target","label":{"ar":"استثمار مشروع الاتصال في بلاناداس، توليما","de":"Investition in das Konnektivitätsprojekt in Planadas, Tolima","en":"Connectivity project investment in Planadas, Tolima","es":"Inversión del proyecto de conectividad en Planadas, Tolima","fr":"Investissement du projet de connectivité à Planadas, Tolima","pt":"Investimento do projeto de conectividade em Planadas, Tolima","tr":"Tolima, Planadas bağlantı projesi yatırım tutarı"},"measure":{"aggregation":"flow","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-3","periodRole":"announcement-date","unitCode":"million-cop"},"period":"2026-11-20","unit":"million COP","value":17400},{"basis":"target","label":{"ar":"أسر مزارعي البن المستهدفة بخدمة الإنترنت المنزلي في بلاناداس","de":"Für Heimanschlüsse vorgesehene Kaffeebauernfamilien in Planadas","en":"Coffee-farming families targeted for home connectivity in Planadas","es":"Familias cafeteras previstas para conexión en sus hogares en Planadas","fr":"Familles de caféiculteurs visées par un raccordement à domicile à Planadas","pt":"Famílias cafeicultoras previstas para ligação residencial em Planadas","tr":"Planadas’ta ev interneti bağlantısı hedeflenen kahve üreticisi aile sayısı"},"measure":{"aggregation":"unspecified","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-4","periodRole":"announcement-date","unitCode":"count"},"period":"2026-11-20","unit":"households","value":800},{"basis":"target","label":{"ar":"طول الألياف الضوئية عالية السعة في مشروع نقل الكهرباء Colectora","de":"Länge der Hochleistungs-Glasfaser entlang des Stromübertragungsprojekts Colectora","en":"High-capacity optical fiber length along the Colectora transmission project","es":"Extensión de fibra óptica de alta capacidad del proyecto de transmisión Colectora","fr":"Longueur de fibre optique à haute capacité du projet de transport électrique Colectora","pt":"Extensão de fibra ótica de alta capacidade do projeto de transmissão elétrica Colectora","tr":"Colectora enerji iletim projesi boyunca yüksek kapasiteli fiber optik hat uzunluğu"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-5","periodRole":"announcement-date","unitCode":"kilometre"},"period":"2026-11-20","unit":"kilometres","value":475},{"basis":"target","label":{"ar":"طول شبكة نقل الاتصالات المقترحة بين إقليمي هويلا وبوتومايو","de":"Vorgeschlagene Länge des Telekommunikations-Transportkorridors zwischen Huila und Putumayo","en":"Proposed telecommunications transport corridor length between Huila and Putumayo","es":"Extensión de la red de transporte de telecomunicaciones explorada entre Huila y Putumayo","fr":"Longueur du réseau de transport de télécommunications envisagé entre Huila et Putumayo","pt":"Extensão da rede de transporte de telecomunicações avaliada entre Huila e Putumayo","tr":"Huila ve Putumayo arasında önerilen telekomünikasyon taşıma koridoru uzunluğu"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-6","periodRole":"announcement-date","unitCode":"kilometre"},"period":"2026-11-20","unit":"kilometres","value":200,"valueQualifier":"lower-bound"}],"methodology":{"ar":"تحتفظ الأرقام بالفترة والسكان والنطاق والتعريفات التي يحددها المصدر. وتُصنف الأهداف المعلنة والتقديرات والتوقعات والحدود العليا بحسب أساسها. ولا تُستنتج أي قيمة مفقودة.","de":"Die Zahlen behalten den in der Quelle angegebenen Zeitraum, die Bezugsgröße, den Umfang und die Definitionen bei. Angekündigte Ziele, Schätzungen, Prognosen und Obergrenzen sind nach ihrer Grundlage gekennzeichnet. Fehlende Werte werden nicht abgeleitet.","en":"Figures retain the source's stated period, population, scope and definitions. Announced targets, estimates, forecasts and upper bounds are labeled by basis. No missing value is inferred.","es":"Las cifras conservan el periodo, la población, el alcance y las definiciones indicados por la fuente. Los objetivos anunciados, estimaciones, previsiones y límites máximos se identifican según su base. No se infiere ningún valor ausente.","fr":"Les chiffres conservent la période, la population, le périmètre et les définitions indiqués par la source. Les objectifs annoncés, estimations, prévisions et plafonds sont qualifiés selon leur base. Aucune valeur manquante n’est déduite.","pt":"Os valores mantêm o período, a população, o âmbito e as definições indicados pela fonte. Metas anunciadas, estimativas, previsões e limites superiores são identificados segundo a respetiva base. Nenhum valor em falta é inferido.","tr":"Rakamlar kaynağın belirttiği dönem, nüfus, kapsam ve tanımları korur. Açıklanan hedefler, tahminler, öngörüler ve üst sınırlar dayanaklarına göre etiketlenir. Eksik değerler çıkarımla tamamlanmaz."},"sourceUrls":["https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"],"title":{"ar":"الأرقام الرئيسية المعلنة","de":"Wichtige gemeldete Kennzahlen","en":"Key reported figures","es":"Cifras clave comunicadas","fr":"Principaux chiffres déclarés","pt":"Principais valores reportados","tr":"Bildirilen temel rakamlar"},"type":"metrics","updatedAt":"2026-11-20T17:00:00Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026/data/reported-figures?lang=fr&format=csv","json":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026/data/reported-figures?lang=fr&format=json"},"id":"reported-figures"}],"data_types":["metrics"],"editorial_illustration":{"alt":"Illustration conceptuelle de la technologie, des processeurs et des informations connectées.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"event_id":"event-3df0ad02-fa28-579e-baf2-1e01d34cee07","event_period":"2026-11-20","event_period_basis":"event-or-reference-period","id":"colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026","image":null,"importance":0.6,"language":"fr","modified_at":"2026-11-20T17:39:59+00:00","publication_basis":"publication-record","published_at":"2026-11-20T17:39:59+00:00","reading_minutes":4,"region":"world","relations":[],"section_illustration":{"alt":"Illustration conceptuelle de la technologie, des processeurs et des informations connectées.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"fr","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"slug":"colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026","sources":[{"checkedAt":"2026-11-20","name":"Ministerio de Tecnologías de la Información y las Comunicaciones (MinTIC) de Colombia, MinTIC y Enlaza unen infraestructura y tecnología para llevar conectividad a zonas apartadas del país","publishedAt":"2026-11-20","url":"https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"}],"summary":"Le ministère colombien des Technologies de l’information et des Communications et Enlaza, filiale de transport d’électricité du Grupo Energía Bogotá, ont défini une feuille de route utilisant les lignes à haute tension et le mécanisme Obras por Impuestos. Le portefeuille comprend 11,79 milliards de pesos à Medina et 17,4 milliards à Planadas.","text":"Le ministère colombien des Technologies de l’information et des Communications et Enlaza, filiale de transport d’électricité du Grupo Energía Bogotá, ont défini une feuille de route utilisant les lignes à haute tension et le mécanisme Obras por Impuestos. Le portefeuille comprend 11,79 milliards de pesos à Medina et 17,4 milliards à Planadas.\n\nLe ministère des Technologies de l’information et des Communications (MinTIC) de Colombie a annoncé le 20 novembre 2026 l’établissement d’une feuille de route conjointe avec Enlaza, filiale de transport d’énergie électrique du Grupo Energía Bogotá (GEB), afin de déployer la fibre optique dans des zones reculées en mutualisant les lignes de transport d’électricité. À l’issue d’une réunion de coordination dirigée par le vice-ministre de la Connectivité, Camilo Carrascal, les deux entités ont arrêté un portefeuille associant des projets locaux financés par le mécanisme fiscal Obras por Impuestos (Travaux contre impôts) et l’évaluation technique de corridors régionaux de transport de données.\n\nLa solution technologique présentée dans le communiqué officiel repose sur l’utilisation des câbles de fibre optique déjà installés sur les pylônes à haute tension et dans les sous-stations électriques pour les systèmes de contrôle et de téléconduite du réseau. En partageant la capacité de transport de données de cette infrastructure électrique, le MinTIC et Enlaza entendent établir des liaisons dorsales de télécommunications dans des territoires ruraux où la construction de réseaux autonomes est coûteuse, avant d’y raccorder des réseaux d’accès locaux pour les ménages, les écoles et les activités agricoles ou touristiques.\n\nDans la municipalité de Medina, située dans le département de Cundinamarca, les partenaires ont signé l’acte officiel de démarrage (acta de inicio) d’un projet représentant un investissement de 11 790 millions de pesos colombiens (11,79 milliards de pesos). Selon le MinTIC, ce déploiement à Medina doit raccorder à Internet les foyers de 303 familles rurales, mettre en service 21 zones numériques intelligentes destinées aux secteurs productif, commercial et touristique, fournir un accès Internet à plus de 900 élèves dans les établissements scolaires et toucher au total 5 623 bénéficiaires.\n\nDans la municipalité de Planadas, dans le département du Tolima, le ministère a annoncé la validation de faisabilité d’un second projet doté d’un investissement de 17 400 millions de pesos colombiens (17,4 milliards de pesos). Cette initiative vise à connecter les foyers de 800 familles de caféiculteurs et intègre un mécanisme de fidélisation soutenu par la Fédération nationale des producteurs de café (Federación Nacional de Cafeteros). Le projet de Planadas comprend également 20 zones numériques touristiques intelligentes le long de la route du café, articulées avec un programme d’intelligence artificielle, ainsi que des olympiades technologiques via le programme Ángeles de la Patria au profit de plus de 2 000 élèves de la commune.\n\nLes opérations de Medina et de Planadas doivent toutes deux être exécutées par Enlaza dans le cadre du dispositif Obras por Impuestos, un instrument fiscal colombien permettant aux entreprises d’affecter une partie de leur impôt sur le revenu à la réalisation directe de projets d’infrastructures publiques approuvés dans des municipalités prioritaires. La signature de l’acte de démarrage à Medina et l’approbation de faisabilité à Planadas constituent des étapes administratives préalables au chantier et non une mise en service effective des réseaux.\n\nPar ailleurs, les deux partenaires sont convenus d’explorer conjointement deux initiatives régionales de transport de données sur des lignes de transport d’électricité. La première porte sur la mise en place d’un réseau de transport de télécommunications de plus de 200 kilomètres entre les départements méridionaux de Huila et de Putumayo, afin d’accroître la capacité de transit de données dans ces deux départements et de préparer l’extension d’Internet dans les zones isolées.\n\nLa seconde évaluation concerne le nord du pays, le long des 475 kilomètres de fibre optique à haute capacité intégrés au projet de ligne de transport électrique Colectora actuellement construit par Enlaza. Le ministère précise qu’une solution de connectivité sera étudiée en tenant compte des conditions socioculturelles des communautés locales pour renforcer la capacité de transport de données dans 14 municipalités : dix dans le département de La Guajira (Albania, Maicao, Distracción, La Jagua del Pilar, Manaure, Riohacha, San Juan del Cesar, Uribia, Urumita et Villanueva) et quatre dans le département du Cesar (Valledupar, Becerril, La Paz et El Paso).\n\nL’annonce du 20 novembre 2026 distingue ainsi deux projets municipaux budgétés sous le régime Obras por Impuestos—totalisant 29 190 millions de pesos à Medina et Planadas pour 1 103 ménages ruraux, 41 zones numériques et plus de 2 900 élèves—et deux corridors dorsaux sur réseau électrique totalisant plus de 675 kilomètres entre Huila-Putumayo et La Guajira-Cesar, qui demeurent au stade de l’étude. La fourniture effective du haut débit dans les 14 communes du nord et le corridor sud dépendra de l’achèvement de la ligne Colectora, des concertations communautaires et du financement des réseaux locaux de desserte finale.","title":"En Colombie, le MinTIC et Enlaza lancent des projets ruraux de fibre optique de 29,19 milliards de pesos et deux corridors électriques","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"}],"url":"https://newsverum.com/fr/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},"version":"1"}
