{"article":{"annotation":{"article_id":"colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026","available_at":"2026-11-20T17:40:05.993458Z","geography_revision":"ef6ee0010dda5fe7b240fd514749b43e214c57da73222d2e40ec83b276dd0977","id":"432e8a8ab1354920c7f6ec397787466e0658052ddebb89a93dc707c5f81fa856","input_sha256":"eea02115cc7da95e831e14d5c861beffbf599a37aa79e1615383ef1741a3f75b","limitations":["Rule-derived subjects are candidates, not verified editorial labels or calibrated model probabilities.","Coverage is distinct from event location. Unknown country/city/coordinates remain absent; no automatic geocoding.","Article geometries keep their stated precision and methodology; reproducing them is not independent coordinate verification."],"method":"controlled-rules-v1","places":[{"admin1":null,"city":null,"coordinate_note":null,"coordinate_reference_system":"OGC:CRS84","coordinate_source":null,"country":"CO","evidence":[{"field":"country","language":"en","note":"Explicit preserved editorial country/region; no city or national centroid inferred","source_urls":["https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"]}],"geometry":null,"id":"iso3166-1:CO","kind":"country-or-area","labels":{"ar":"كولومبيا","en":"Colombia","es":"Colombia","fr":"Colombie"},"match_status":"candidate","precision":"regional","role":"coverage","uncertainty_m":null}],"rules_sha256":"fb5ad3c27c91cb840f7a0a05f7f64a5cb26ad0374409ff9457f277c7092e22b4","schema_version":1,"subjects":[{"concept_id":"medtop:20000260","confidence":null,"confidence_method":null,"evidence":[{"field":"en.title+en.summary","language":"en","note":"Subject suggested from the title or summary: power lines","source_urls":["https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"]}],"method":"controlled-rules-v1","rule_id":"electricity","status":"candidate"},{"concept_id":"medtop:13000000","confidence":null,"confidence_method":null,"evidence":[{"field":"category+topics","language":"en","note":"Preserved editorial category/topic; broad candidate only","source_urls":["https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"]}],"method":"controlled-rules-v1","rule_id":"technology-broad","status":"candidate"}],"taxonomy_revision":"1f2db31d811fca07e99b16d402c10e2cc2965c9df1c7b41d9be348b40a24e7fb","taxonomy_version":"IPTC Media Topics 2026-Q2"},"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=en","category":"technology","content":{"key_points":[],"paragraphs":["Colombia's Ministry of Information Technologies and Communications (MinTIC) announced on 20 November 2026 a joint infrastructure roadmap with Enlaza, the electric power transmission subsidiary of Grupo Energía Bogotá (GEB), to expand broadband access in remote areas by sharing optical fiber deployed along high-voltage power lines. Following a coordination meeting led by Vice Minister of Connectivity Camilo Carrascal, the two entities defined a portfolio that combines immediate local connectivity projects funded under Colombia's Works for Taxes (Obras por Impuestos) mechanism with longer-term evaluations of regional backbone corridors.","The technical approach described in the official release relies on optical fiber cables already strung along electric transmission towers and substations for grid control and telemetry. By utilizing surplus data-transport capacity on those power transmission lines, MinTIC and Enlaza aim to provide backhaul telecommunications links in rural territories where building standalone telecom trunk networks is costly, and then connect local access networks for households, schools, and agricultural or tourism businesses.","In the municipality of Medina, located in the department of Cundinamarca, the partners signed the official start certificate (acta de inicio) for a project representing an investment of 11,790 million Colombian pesos (11.79 billion pesos). According to MinTIC, the Medina deployment is planned to bring residential internet connections to 303 rural families, install 21 smart digital zones serving productive, commercial, and tourism activities, provide internet access to more than 900 students at local educational institutions, and reach 5,623 total beneficiaries.","In the municipality of Planadas, in the department of Tolima, the ministry reported that a second project valued at 17,400 million Colombian pesos (17.4 billion pesos) has been approved as viable. That initiative is designed to connect 800 coffee-farming families and includes a user-retention mechanism supported by the National Federation of Coffee Growers (Federación Nacional de Cafeteros). The Planadas scope also covers 20 smart tourist digital zones along the local coffee route integrated with an artificial-intelligence training programme, as well as technology competitions under the Ángeles de la Patria programme expected to reach more than 2,000 students in municipal schools.","Both the Medina and Planadas deployments are structured to be executed by Enlaza through the Works for Taxes mechanism, a Colombian fiscal instrument that allows corporate taxpayers to direct a portion of their income-tax liabilities directly into approved public infrastructure projects in designated priority municipalities. Signing a start certificate in Medina and clearing viability in Planadas mark administrative milestones toward deployment, rather than completed network commissioning.","Beyond those two municipal projects, MinTIC and Enlaza agreed to jointly evaluate two high-voltage transmission corridors for backbone data transport. The first exploratory initiative covers a telecommunications transport network of more than 200 kilometres linking the southern departments of Huila and Putumayo, intended to expand regional data-carrying capacity and create conditions for last-mile internet extensions in underserved communities.","The second backbone evaluation focuses on northern Colombia along the 475 kilometres of high-capacity optical fiber included in the Colectora electric power transmission project currently being constructed by Enlaza. The ministry stated that the partners will assess a connectivity solution across 14 municipalities—10 in the department of La Guajira (Albania, Maicao, Distracción, La Jagua del Pilar, Manaure, Riohacha, San Juan del Cesar, Uribia, Urumita, and Villanueva) and four in the department of Cesar (Valledupar, Becerril, La Paz, and El Paso)—taking into account the sociocultural conditions of local Indigenous and rural communities.","The 20 November 2026 announcement distinguishes between two funded Works for Taxes projects—totalling 29,190 million Colombian pesos across Medina and Planadas for 1,103 rural households, 41 digital zones, and over 2,900 students—and two regional grid-fiber corridors totaling more than 675 kilometres in Huila-Putumayo and La Guajira-Cesar that remain under technical evaluation. Actual broadband delivery across the 14 northern municipalities and the southern corridor will depend on completing the Colectora transmission line, finalizing community agreements, and financing the local distribution networks that connect to the high-voltage fiber trunk."],"sections":[]},"corrections":[],"country":"CO","data":{"blocks":[{"description":{"ar":"أرقام مختارة منقولة من المصدر الأولي المشار إليه.","de":"Ausgewählte Zahlen aus der zitierten Primärquelle.","en":"Selected figures transcribed from the cited primary source.","es":"Cifras seleccionadas transcritas de la fuente primaria citada.","fr":"Chiffres sélectionnés transcrits de la source primaire citée.","pt":"Valores selecionados transcritos da fonte primária citada.","tr":"Atıf yapılan birincil kaynaktan aktarılan seçilmiş rakamlar."},"id":"reported-figures","items":[{"basis":"target","label":{"ar":"استثمار مشروع الاتصال في ميدينا، كونديناماركا","de":"Investition in das Konnektivitätsprojekt in Medina, Cundinamarca","en":"Connectivity project investment in Medina, Cundinamarca","es":"Inversión del proyecto de conectividad en Medina, Cundinamarca","fr":"Investissement du projet de connectivité à Medina, Cundinamarca","pt":"Investimento do projeto de conectividade em Medina, Cundinamarca","tr":"Cundinamarca, Medina bağlantı projesi yatırım tutarı"},"measure":{"aggregation":"flow","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-1","periodRole":"announcement-date","unitCode":"million-cop"},"period":"2026-11-20","unit":"million COP","value":11790},{"basis":"target","label":{"ar":"المستفيدون المخطط لهم من مشروع الاتصال في ميدينا","de":"Geplante Begünstigte des Konnektivitätsprojekts in Medina","en":"Planned beneficiaries of the Medina connectivity project","es":"Personas beneficiarias previstas del proyecto de conectividad en Medina","fr":"Bénéficiaires prévus du projet de connectivité de Medina","pt":"Pessoas beneficiárias previstas do projeto de conectividade em Medina","tr":"Medina bağlantı projesinin planlanan yararlanıcı sayısı"},"measure":{"aggregation":"unspecified","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-2","periodRole":"announcement-date","unitCode":"count"},"period":"2026-11-20","unit":"beneficiaries","value":5623},{"basis":"target","label":{"ar":"استثمار مشروع الاتصال في بلاناداس، توليما","de":"Investition in das Konnektivitätsprojekt in Planadas, Tolima","en":"Connectivity project investment in Planadas, Tolima","es":"Inversión del proyecto de conectividad en Planadas, Tolima","fr":"Investissement du projet de connectivité à Planadas, Tolima","pt":"Investimento do projeto de conectividade em Planadas, Tolima","tr":"Tolima, Planadas bağlantı projesi yatırım tutarı"},"measure":{"aggregation":"flow","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-3","periodRole":"announcement-date","unitCode":"million-cop"},"period":"2026-11-20","unit":"million COP","value":17400},{"basis":"target","label":{"ar":"أسر مزارعي البن المستهدفة بخدمة الإنترنت المنزلي في بلاناداس","de":"Für Heimanschlüsse vorgesehene Kaffeebauernfamilien in Planadas","en":"Coffee-farming families targeted for home connectivity in Planadas","es":"Familias cafeteras previstas para conexión en sus hogares en Planadas","fr":"Familles de caféiculteurs visées par un raccordement à domicile à Planadas","pt":"Famílias cafeicultoras previstas para ligação residencial em Planadas","tr":"Planadas’ta ev interneti bağlantısı hedeflenen kahve üreticisi aile sayısı"},"measure":{"aggregation":"unspecified","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-4","periodRole":"announcement-date","unitCode":"count"},"period":"2026-11-20","unit":"households","value":800},{"basis":"target","label":{"ar":"طول الألياف الضوئية عالية السعة في مشروع نقل الكهرباء Colectora","de":"Länge der Hochleistungs-Glasfaser entlang des Stromübertragungsprojekts Colectora","en":"High-capacity optical fiber length along the Colectora transmission project","es":"Extensión de fibra óptica de alta capacidad del proyecto de transmisión Colectora","fr":"Longueur de fibre optique à haute capacité du projet de transport électrique Colectora","pt":"Extensão de fibra ótica de alta capacidade do projeto de transmissão elétrica Colectora","tr":"Colectora enerji iletim projesi boyunca yüksek kapasiteli fiber optik hat uzunluğu"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-5","periodRole":"announcement-date","unitCode":"kilometre"},"period":"2026-11-20","unit":"kilometres","value":475},{"basis":"target","label":{"ar":"طول شبكة نقل الاتصالات المقترحة بين إقليمي هويلا وبوتومايو","de":"Vorgeschlagene Länge des Telekommunikations-Transportkorridors zwischen Huila und Putumayo","en":"Proposed telecommunications transport corridor length between Huila and Putumayo","es":"Extensión de la red de transporte de telecomunicaciones explorada entre Huila y Putumayo","fr":"Longueur du réseau de transport de télécommunications envisagé entre Huila et Putumayo","pt":"Extensão da rede de transporte de telecomunicações avaliada entre Huila e Putumayo","tr":"Huila ve Putumayo arasında önerilen telekomünikasyon taşıma koridoru uzunluğu"},"measure":{"aggregation":"stock","frequency":"irregular","geography":"colombia","id":"g20261120p2-d9-co-mintic-6","periodRole":"announcement-date","unitCode":"kilometre"},"period":"2026-11-20","unit":"kilometres","value":200,"valueQualifier":"lower-bound"}],"methodology":{"ar":"تحتفظ الأرقام بالفترة والسكان والنطاق والتعريفات التي يحددها المصدر. وتُصنف الأهداف المعلنة والتقديرات والتوقعات والحدود العليا بحسب أساسها. ولا تُستنتج أي قيمة مفقودة.","de":"Die Zahlen behalten den in der Quelle angegebenen Zeitraum, die Bezugsgröße, den Umfang und die Definitionen bei. Angekündigte Ziele, Schätzungen, Prognosen und Obergrenzen sind nach ihrer Grundlage gekennzeichnet. Fehlende Werte werden nicht abgeleitet.","en":"Figures retain the source's stated period, population, scope and definitions. Announced targets, estimates, forecasts and upper bounds are labeled by basis. No missing value is inferred.","es":"Las cifras conservan el periodo, la población, el alcance y las definiciones indicados por la fuente. Los objetivos anunciados, estimaciones, previsiones y límites máximos se identifican según su base. No se infiere ningún valor ausente.","fr":"Les chiffres conservent la période, la population, le périmètre et les définitions indiqués par la source. Les objectifs annoncés, estimations, prévisions et plafonds sont qualifiés selon leur base. Aucune valeur manquante n’est déduite.","pt":"Os valores mantêm o período, a população, o âmbito e as definições indicados pela fonte. Metas anunciadas, estimativas, previsões e limites superiores são identificados segundo a respetiva base. Nenhum valor em falta é inferido.","tr":"Rakamlar kaynağın belirttiği dönem, nüfus, kapsam ve tanımları korur. Açıklanan hedefler, tahminler, öngörüler ve üst sınırlar dayanaklarına göre etiketlenir. Eksik değerler çıkarımla tamamlanmaz."},"sourceUrls":["https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"],"title":{"ar":"الأرقام الرئيسية المعلنة","de":"Wichtige gemeldete Kennzahlen","en":"Key reported figures","es":"Cifras clave comunicadas","fr":"Principaux chiffres déclarés","pt":"Principais valores reportados","tr":"Bildirilen temel rakamlar"},"type":"metrics","updatedAt":"2026-11-20T17:00:00Z"}],"version":1},"data_downloads":[{"formats":{"csv":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026/data/reported-figures?lang=en&format=csv","json":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026/data/reported-figures?lang=en&format=json"},"id":"reported-figures"}],"data_types":["metrics"],"editorial_illustration":{"alt":"Conceptual illustration of technology, processors and connected information.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"topic","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"event_id":"event-3df0ad02-fa28-579e-baf2-1e01d34cee07","event_period":"2026-11-20","event_period_basis":"event-or-reference-period","id":"colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026","image":null,"importance":0.6,"language":"en","modified_at":"2026-11-20T17:39:59+00:00","publication_basis":"publication-record","published_at":"2026-11-20T17:39:59+00:00","reading_minutes":4,"region":"world","relations":[],"section_illustration":{"alt":"Conceptual illustration of technology, processors and connected information.","asset_id":"newsverum-v1-technology","avif_variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.avif","width":480},{"height":480,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-720.avif","width":720},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.avif","width":960},{"height":800,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1200.avif","width":1200},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.avif","width":1536}],"caption":null,"credit":"Newsverum","documentary":false,"height":1024,"kind":"symbolic-editorial-illustration","language":"en","scope":"section","url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","variants":[{"height":320,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-480.webp","width":480},{"height":640,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-960.webp","width":960},{"height":1024,"url":"https://newsverum.com/assets/newsverum/illustrations/v1/technology-1536.webp","width":1536}],"width":1536},"slug":"colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026","sources":[{"checkedAt":"2026-11-20","name":"Ministerio de Tecnologías de la Información y las Comunicaciones (MinTIC) de Colombia, MinTIC y Enlaza unen infraestructura y tecnología para llevar conectividad a zonas apartadas del país","publishedAt":"2026-11-20","url":"https://www.mintic.gov.co/portal/inicio/Sala-de-prensa/Noticias/442577:MinTIC-y-Enlaza-unen-infraestructura-y-tecnologia-para-llevar-conectividad-a-zonas-apartadas-del-pais"}],"summary":"Colombia's Ministry of Information Technologies and Communications and Grupo Energía Bogotá transmission unit Enlaza outlined a joint roadmap using high-voltage power lines and Works for Taxes financing. The portfolio includes an 11.79 billion peso project in Medina and a 17.4 billion peso project in Planadas.","text":"Colombia's Ministry of Information Technologies and Communications and Grupo Energía Bogotá transmission unit Enlaza outlined a joint roadmap using high-voltage power lines and Works for Taxes financing. The portfolio includes an 11.79 billion peso project in Medina and a 17.4 billion peso project in Planadas.\n\nColombia's Ministry of Information Technologies and Communications (MinTIC) announced on 20 November 2026 a joint infrastructure roadmap with Enlaza, the electric power transmission subsidiary of Grupo Energía Bogotá (GEB), to expand broadband access in remote areas by sharing optical fiber deployed along high-voltage power lines. Following a coordination meeting led by Vice Minister of Connectivity Camilo Carrascal, the two entities defined a portfolio that combines immediate local connectivity projects funded under Colombia's Works for Taxes (Obras por Impuestos) mechanism with longer-term evaluations of regional backbone corridors.\n\nThe technical approach described in the official release relies on optical fiber cables already strung along electric transmission towers and substations for grid control and telemetry. By utilizing surplus data-transport capacity on those power transmission lines, MinTIC and Enlaza aim to provide backhaul telecommunications links in rural territories where building standalone telecom trunk networks is costly, and then connect local access networks for households, schools, and agricultural or tourism businesses.\n\nIn the municipality of Medina, located in the department of Cundinamarca, the partners signed the official start certificate (acta de inicio) for a project representing an investment of 11,790 million Colombian pesos (11.79 billion pesos). According to MinTIC, the Medina deployment is planned to bring residential internet connections to 303 rural families, install 21 smart digital zones serving productive, commercial, and tourism activities, provide internet access to more than 900 students at local educational institutions, and reach 5,623 total beneficiaries.\n\nIn the municipality of Planadas, in the department of Tolima, the ministry reported that a second project valued at 17,400 million Colombian pesos (17.4 billion pesos) has been approved as viable. That initiative is designed to connect 800 coffee-farming families and includes a user-retention mechanism supported by the National Federation of Coffee Growers (Federación Nacional de Cafeteros). The Planadas scope also covers 20 smart tourist digital zones along the local coffee route integrated with an artificial-intelligence training programme, as well as technology competitions under the Ángeles de la Patria programme expected to reach more than 2,000 students in municipal schools.\n\nBoth the Medina and Planadas deployments are structured to be executed by Enlaza through the Works for Taxes mechanism, a Colombian fiscal instrument that allows corporate taxpayers to direct a portion of their income-tax liabilities directly into approved public infrastructure projects in designated priority municipalities. Signing a start certificate in Medina and clearing viability in Planadas mark administrative milestones toward deployment, rather than completed network commissioning.\n\nBeyond those two municipal projects, MinTIC and Enlaza agreed to jointly evaluate two high-voltage transmission corridors for backbone data transport. The first exploratory initiative covers a telecommunications transport network of more than 200 kilometres linking the southern departments of Huila and Putumayo, intended to expand regional data-carrying capacity and create conditions for last-mile internet extensions in underserved communities.\n\nThe second backbone evaluation focuses on northern Colombia along the 475 kilometres of high-capacity optical fiber included in the Colectora electric power transmission project currently being constructed by Enlaza. The ministry stated that the partners will assess a connectivity solution across 14 municipalities—10 in the department of La Guajira (Albania, Maicao, Distracción, La Jagua del Pilar, Manaure, Riohacha, San Juan del Cesar, Uribia, Urumita, and Villanueva) and four in the department of Cesar (Valledupar, Becerril, La Paz, and El Paso)—taking into account the sociocultural conditions of local Indigenous and rural communities.\n\nThe 20 November 2026 announcement distinguishes between two funded Works for Taxes projects—totalling 29,190 million Colombian pesos across Medina and Planadas for 1,103 rural households, 41 digital zones, and over 2,900 students—and two regional grid-fiber corridors totaling more than 675 kilometres in Huila-Putumayo and La Guajira-Cesar that remain under technical evaluation. Actual broadband delivery across the 14 northern municipalities and the southern corridor will depend on completing the Colectora transmission line, finalizing community agreements, and financing the local distribution networks that connect to the high-voltage fiber trunk.","title":"Colombia's MinTIC and Enlaza advance 29.19 billion peso rural fiber projects and grid corridors","topics":[],"translations":[{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=tr","language":"tr","url":"https://newsverum.com/tr/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=en","language":"en","url":"https://newsverum.com/en/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=ar","language":"ar","url":"https://newsverum.com/ar/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=fr","language":"fr","url":"https://newsverum.com/fr/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=es","language":"es","url":"https://newsverum.com/es/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=de","language":"de","url":"https://newsverum.com/de/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},{"api_url":"https://newsverum.com/api/v1/articles/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026?lang=pt","language":"pt","url":"https://newsverum.com/pt/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"}],"url":"https://newsverum.com/en/news/colombia-mintic-enlaza-power-grid-fiber-connectivity-projects-2026"},"version":"1"}
